ASHRAE INDEX IP-2003 Composite Index (Includes Additions and Corrections)《包括了补充和更正的综合指数》.pdf
《ASHRAE INDEX IP-2003 Composite Index (Includes Additions and Corrections)《包括了补充和更正的综合指数》.pdf》由会员分享,可在线阅读,更多相关《ASHRAE INDEX IP-2003 Composite Index (Includes Additions and Corrections)《包括了补充和更正的综合指数》.pdf(42页珍藏版)》请在麦多课文档分享上搜索。
1、ASHRAE HANDBOOK Additions and Corrections - This report includes additional information and technical errors found between June 15,2000, and April 1,2003, in the inch-pound (I-P) edition of the 2000, 2001, and 2002 ASHRAE Handbooks. Occasional typographical errors and nonstandard symbol labels will
2、be corrected in future volumes. The most current list of Hand- book additions and corrections is on the ASHRAE web site (www.ashrae.org). The authors and editor encourage you to notify them if you find other technical errors. Please send corrections to: Handbook Editor, ASHRAE, 1791 Tullie Circle NE
3、, Atlanta, GA 30329, or e-mail mowenashrae.org. 2000 HVAC Systems and Equipment p. 1.3,2nd column. In the Space requirements paragraph the first sentence should read “A decentralized system may or may not have an equipment room.” p. 7.11, 2nd column, 2nd to last paragraph. The Btu in the last senten
4、ce should be Btuh. p. 7.11, 2nd column, last paragraph. The “Btu” in the first sen- tence should be “Btu/h.” p. 7.28, 1st column, 3rd paragraph, third line up. The number should read “600 V.” p. 7.28, 1st column, 3rd paragraph, last line. Change “5 Hz” to “5 cycles.” p. 7.33, 1st column, last paragr
5、aph. Change “7000 lbh” to “7000 Ib” and “7 Ib/h” to “7 Ib.” p. 7.33, 1st column, last line. The “total energy requirement” should be “total power requirement.” p. 7.33,2nd column, 2nd paragraph, last sentence. “More energy than the gas turbine should be “more power than the gas turbine.” p. 7.33, 2n
6、d column, last sentence in Example 1. “Preceding energy costs” should be “preceding power costs.” p. 8.18,lst column, 1st line. Change “amplify” to “raise.” p. 9.4, 2nd column, 1st full paragraph, 2nd to last sentence. Delete “by more than 25% of the sensible load.” p. 11.27, Fig. 22. Replace Fig. 2
7、2 with the figure at top right, in which the primary and secondary systems are not shown to be connected. p. 11.29,2nd column, last line. Change “visa” to “vice.” p. 11.30, 2nd column, first bulleted text. Change “capacity” to “power.” p. 18.7, Fig. 13. Should read: “Curve shows performance of a fix
8、ed fan size running at a fixed speed.” p. 20.2, 1st column, last paragraph. Delete second sentence that reads “Water vapor migrates from areas of high vapor pressure and lower temperature.” p. 26.9, Fuel Oil Preparation System, 3rd paragraph, Ist sen- tence. Delete “X lo6” so that the viscosity is j
9、ust “156 cSt.” AIR REMOVAL AND EXPANSION - SYSTEM - I BOOSTER COILS I d I I - I DOMESTIC TO DHW LOADS FROM COLD WATER SUPPLY d DISTRICT SYSTEM RETURN Fig. 22 Basic Heating System Schematic (2000 HVAC Systems and Equipment, Chapter I I, p. 27) p. 30.31,lst column, 1st reference. Change the year to 19
10、92 and “Customer Service” to “Handbook Editor.” p. 32.3, 2nd column. In the definition for n, replace the last two definitions with “1 .O for ceiling heating and floor cooling panels, and 1.1 for floor heating and ceiling cooling panels.” p. 37.1,lst column, last paragraph, 2nd to last sentence. Del
11、ete “the volume of the.” p. 41.11,lst column. In the section on L Bends, change references from Equation (4) to Equation (5). Change references from Equa- tion (5) to Equation (6). Change the reference from Equation (6) to Equation (7). p. 42.14, 2nd column, last reference. The year should be 1998 a
12、nd the edition should be 3rd. p. 44.4, Eqs. (3) and (4). The equations should read as follows: x2 = x, + the revised table is included here for convenience: Table 2 Effective Roughness of Conduit Surfaces Material E, pin Commercially smooth brass, lead, copper, or plastic pipe 0.06 Steel and wrought
13、 iron 1.8 Galvanized iron or steel 6.0 Cast iron 10.2 p. 6.5, Table 2, under “Specific Entropy.” At t = 129”F, change the value for sda to “0.05946 Btu/lbd, . “E” p. 6.11, Table 3. For 256”F, replace the following variables with these values: vfg 12.517 vP 12.535 hf 224.72 hfP 941.33 hP 11 66.05 sr
14、0.3763 srg 1.3152 p. 17.3, 1st column, 9th line. Change “25 kWh/ft2.yr” to read 1 5 kWh/ft2 . yr.” p. 23.2, Thermal Insulation section, 1st sentence. Delete “trans- fer” from “radiative transfer modes” and add “transfer” after “heat.” p. 25.24,lst column, after 10th entry. Add the following: Lotz, W
15、.A. 1964. Vapor barrier design, neglected key to freezer insulation effectiveness. Quick Frozen Foods (November): 122. p. 26.8, Fig. 6A. The label Poutside should indicate the more diago- nal line. p. 26.28, Symbols. Change the definition for g to read “gravita- tional constant,” and add the followi
16、ng definition: G = wind speed multiplier (Table 10) p. 26.30, References. Add the following source below Mauss et al.: Klote, J.H. and J.A. Milke. 1992. Design of smoke management systems. p. 27.1. The second paragraph under Climatic Design Conditions should read, “Information on station location, p
17、eriod analyzed, heat- ing design conditions, mean annual extreme, and standard deviation of minimum and maximum dry-bulb temperature are listed in Tables IA, 2A, and 3A. Information on the design conditions for cooling and humidity control, along with the mean daily temperature range for the warmest
18、 month, is provided in Tables lB, 2B, and 3B.” p. 29.14, Eq. (13). The equation should read as follows: ASHRAE. qb = AE, SHGC(0)IAC (13) p. 30.33, Table 13. In the footnote, change the reference for ID numbers from “Table 5” to “Table 4.” p. 30.38,2nd column, 2nd paragraph. The reference to Tables 1
19、6 through 22 should be to Tables 15 through 22. p. 34.9, Fig. 9. Replace SI value chart with I-P value chart (p. AS) p. 34.23, Example 9, 2nd paragraph, 2nd line. Change “Figure 13 in Chapter 16” to read “Figure 2 in Chapter 43 of the 1999 ASHRAE Handbook-HVAC Applications.” Figure 2 is presented at
20、 right for convenience. p. 34.17, 2nd column, Ist paragraph. AMCA Standard 500-L should be AMCA Standard 500. RECOMMENDED 3000 fpm MINIMUM a DISCHARGE VELOCITY DRAIN DRAIN BEST- NO CAPS OR HEADS T E II F G VERTICAL p:gINd Q Q CI I , DRAIN OFFSET POWERHOUSE GOOD - DRAIN-NPE STACKS - II II II I1 II II
21、 Il II II Il II %- K L M N O P Q POOR -SHOULD NOT BE USED Fig. 2 Stack Designs Providing Vertical Discharge and Rain Protection (2001 Fundamentals, Chapter 34, p. 23) p. 34.57, table for CR-6 Screen (Only). In the cell for n = 0.65 and A,/A, = 1.2, replace “0.36” with “0.52.” p. 35.6, Fig. 1. Replac
22、e Figure 1 with the corrected figure shown at the top of page 3. p. 38.4. Under the Specific Heat column, the cross reference should be to Table 4 in Chapter 25. p. 1.28, Index. The page numbers for the Louvers, sizing entry should be 34.17-18. 2002 Refrigeration p. 2.4, Example 1. Please replace th
23、e specified Solution calcula- tions with the following text: Estimated friction loss = 0.59 x 3.05 = 1.8 psi Total pressure losses 10.0 + 1.7 = 11.8 psi Total liquid line losses - 11.8 psi The saturation temperature at 199 psig is 1Ol.l”F p. 12.1, 2nd column. In the first full paragraph, change “The
24、se values decrease” to “These values increase.” Additions and Corrections A.3 Fig. 1 Friction Loss for Water in Commercial Steel Pipe (Schedule 40) (2001 Fundamentals, Chapter 35, p. 6) p. 12.7, Infiltration Load values. Delete “OF” from the definitions for hf, h, and pr; for pi, the entire definiti
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASHRAEINDEXIP2003COMPOSITEINDEXINCLUDESADDITIONSANDCORRECTIONS 包括 补充 更正 综合指数 PDF

链接地址:http://www.mydoc123.com/p-455225.html