ARMY UFGS-31 60 00-2008 FOUNDATION PREPARATION《挖地基》.pdf
《ARMY UFGS-31 60 00-2008 FOUNDATION PREPARATION《挖地基》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-31 60 00-2008 FOUNDATION PREPARATION《挖地基》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-31 60 00 (November 2008)-Preparing Activity: USACE (CW) SupersedingUFGS-31 60 00 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2008*SECTION TABLE OF CONTENTSDIVISION 31 - EARTHWORKSECTION 31 60 00FOUNDATION
2、 PREPARATION11/08PART 1 GENERAL1.1 UNIT PRICES1.1.1 Preliminary Cleanup1.1.1.1 Payment1.1.1.2 Measurement1.1.1.3 Unit of Measure1.1.2 Final Cleanup1.1.2.1 Payment1.1.2.2 Measurement1.1.2.3 Unit of measure1.1.3 Foundation Preparation1.1.3.1 Payment1.1.3.2 Measurement1.1.3.3 Unit of measure1.1.4 Denta
3、l Concrete1.1.4.1 Payment1.1.4.2 Measurement1.1.4.3 Unit of measure1.1.5 Dental Mortar1.1.5.1 Payment1.1.5.2 Measurement1.1.5.3 Unit of measure1.1.6 Shotcrete1.1.6.1 Payment1.1.6.2 Measurement1.1.6.3 Unit of measure1.1.7 Protective Coating1.1.7.1 Payment1.1.7.2 Measurement1.1.7.3 Unit of measure1.2
4、REFERENCES1.3 DEFINITIONS1.3.1 Foundations1.3.2 Rock Joints1.4 SUBMITTALSSECTION 31 60 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-PART 2 PRODUCTS2.1 MATERIALS2.1.1 Dental Concrete2.1.2 Dental Mortar2.1.3 Shotcrete2.1.4 Welded Wire Fabri
5、c2.1.5 Filter MaterialPART 3 EXECUTION3.1 EXAMINATION3.2 PREPARATION3.2.1 Equipment3.2.1.1 Tools3.2.1.2 Air Jet3.2.1.3 Air/Water Jet3.2.1.4 Water Jet3.3 PRELIMINARY CLEANUP3.4 FINAL CLEANUP AND FOUNDATION PREPARATION3.5 DENTAL TREATMENT3.5.1 Dental Concrete3.5.2 Dental Mortar3.6 PROTECTIVE TREATMENT
6、3.6.1 Wetting3.6.2 Shotcrete3.6.3 Protective Coating3.6.4 Protective Backfill3.6.5 Protective Concrete3.6.6 Temporary Earth Cover3.7 TESTS3.7.1 General3.7.1.1 Equipment3.7.1.2 Foundation Excavation3.7.1.3 Inspection, Mapping, and Cleanup3.7.1.4 Specialized operations3.7.2 Reports3.8 FOUNDATION INSPE
7、CTION AND GEOLOGIC MAPPING- End of Section Table of Contents -SECTION 31 60 00 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-31 60 00 (November 2008)-Preparing Activity: USACE (CW) SupersedingUFGS-31 60 00
8、 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2008*SECTION 31 60 00FOUNDATION PREPARATION11/08*NOTE: This guide specification covers the requirements for embankments and concrete structures placed on rock foundations, including all operations
9、 on the rock surface to make that surface acceptable for the placement of embankment or concrete.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information
10、 and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designati
11、on and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: This section is not complete, but should normally be incorporated into the sections dealing with EARTHWORK, and/or CONCRETE, or a separate section on
12、 FOUNDATION PREPARATION may be included in the project specifications.*1.1 UNIT PRICES*NOTE: If Section 01 22 00.00 10 MEASUREMENT AND PAYMENT is included in the project specifications, SECTION 31 60 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from I
13、HS-,-,-this paragraph title (UNIT PRICES) should be deleted from this section and the remaining appropriately edited subparagraphs below should be inserted into Section 01 22 00.00 10.*1.1.1 Preliminary Cleanup1.1.1.1 PaymentPayment will be made for costs for each preliminary cleanup satisfactorily
14、performed at the direction of the Contracting Officer. Payment will be made for each cleanup of the same area if more than one cleanup has been directed and satisfactorily performed.1.1.1.2 MeasurementPreliminary cleanup will be measured for payment by determining the area cleaned to the nearest squ
15、are meter yard.1.1.1.3 Unit of MeasureUnit of measure: square meter yard.1.1.2 Final Cleanup1.1.2.1 PaymentPayment will be made for costs associated with final cleanup of the area for each type of foundation preparation that has been satisfactorily prepared. Where preliminary cleanup has been direct
16、ed and performed and the Contractor subsequently performs final cleanup, payment will be made for preliminary cleanup. Payment will not be made for any cleanup subsequent to final cleanup.1.1.2.2 MeasurementFinal cleanup will be measured for payment by determining the area cleaned to the nearest squ
17、are meter yard.1.1.2.3 Unit of measureSquare meter yard.1.1.3 Foundation Preparation1.1.3.1 PaymentPayment will be made for costs associated with foundation preparation of the area for each type of foundation preparation that has been satisfactorily prepared. Where preliminary cleanup has been direc
18、ted and performed and the Contractor subsequently performs foundation preparation, payment will be made for foundation preparation. Payment will not be made for more than one foundation preparation of the same area.1.1.3.2 MeasurementFoundation preparation will be measured for payment by determining
19、 the area prepared to the nearest square meter yard.SECTION 31 60 00 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.1.3.3 Unit of measureSquare meter yard.1.1.4 Dental Concrete1.1.4.1 PaymentPayment will be made for costs associated with den
20、tal concrete placed.1.1.4.2 MeasurementDental concrete will be measured for payment by determining the volume to the nearest one-tenth cubic meter yard.1.1.4.3 Unit of measureCubic meter yard.1.1.5 Dental Mortar1.1.5.1 PaymentPayment will be made for costs associated with dental mortar placed.1.1.5.
21、2 MeasurementDental mortar will be measured for payment by determining the volume to the nearest one-tenth cubic meter yard.1.1.5.3 Unit of measureCubic meter yard.1.1.6 Shotcrete1.1.6.1 PaymentPayment will be made for costs associated with shotcrete satisfactorily placed.1.1.6.2 MeasurementShotcret
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3160002008FOUNDATIONPREPARATION 地基 PDF

链接地址:http://www.mydoc123.com/p-449695.html