1、*USACE / NAVFAC / AFCESA / NASA UFGS-31 05 20 (August 2008)-Preparing Activity: USACE SupersedingUFGS-31 05 20 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 31 - EARTHWORKSECTION 31 05 20GEOSYNTHETIC DRAINAG
2、E LAYER08/08PART 1 GENERAL1.1 MEASUREMENT AND PAYMENT1.2 REFERENCES1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.5 DELIVERY, STORAGE, AND HANDLINGPART 2 PRODUCTS2.1 GEOSYNTHETIC DRAINAGE LAYER2.2 SAMPLING AND TESTING2.2.1 Manufacturing Quality Control Testing2.2.2 Construction Quality Control TestingPART 3 E
3、XECUTION3.1 INSTALLATION3.1.1 Surface Preparation3.1.2 Placement3.1.3 Seams and Overlaps3.1.3.1 Geonet Side Seams3.1.3.2 Geonet End Seams3.1.3.3 Geonet Fasteners3.1.3.4 Geotextile Seams3.1.3.5 Geotextile Cap Strips3.1.4 Stacked Geosynthetic Drainage Layers3.1.5 Corners3.1.6 Penetrations3.2 REPAIRS3.
4、2.1 Geonet Damage3.2.2 Geotextile Damage3.3 PROTECTION AND BACKFILLING- End of Section Table of Contents -SECTION 31 05 20 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-31 05 20 (August 2008)-Preparing Act
5、ivity: USACE SupersedingUFGS-31 05 20 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION 31 05 20GEOSYNTHETIC DRAINAGE LAYER08/08*NOTE: This guide specification covers the requirements for geosynthetic drainage layers including both geone
6、ts and geocomposites.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not bracket
7、s are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS sh
8、ould be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 MEASUREMENT AND PAYMENT*NOTE: Delete this paragraph when lump sum bidding is used.*Measure the total surface area in square meters feet covered by geosynthetic drainage layer. Base final quantities on as-built conditions. Allowa
9、nce will be made for geosynthetic drainage layer in anchor and/or drainage trenches but no allowance will be made for waste, overlap, or materials used for the convenience of the Contractor. Geosynthetic drainage layer accepted by the Contracting Officer will be paid for at the respective contract u
10、nit price in the bidding schedule.SECTION 31 05 20 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.2 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred
11、to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use t
12、he Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this
13、specification to the extent referenced. The publications are referred to within the text by the basic designation only.ASTM INTERNATIONAL (ASTM)ASTM D 1505 (2003) Density of Plastics by the Density-Gradient TechniqueASTM D 1603 (2006) Carbon Black Content in Olefin PlasticsASTM D 4218 (1996; R 2001)
14、 Determination of Carbon Black Content in Polyethylene Compounds by the Muffle-Furnace TechniqueASTM D 4355 (2007) Deterioration of Geotextiles from Exposure to Light, Moisture and Heat in a Xenon-Arc Type ApparatusASTM D 4491 (1999a; R 2004e1) Water Permeability of Geotextiles by PermittivityASTM D
15、 4533 (2004) Trapezoid Tearing Strength of GeotextilesASTM D 4632 (1991; R 2003) Grab Breaking Load and Elongation of GeotextilesASTM D 4716 (2007) Determining the (In-Plane) Flow Rate Per Unit Width and Hydraulic Transmissivity of a Geosynthetic Using a Constant HeadASTM D 4751 (2004) Determining A
16、pparent Opening Size of a GeotextileSECTION 31 05 20 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-ASTM D 4833 (2007) Index Puncture Resistance of Geotextiles, Geomembranes, and Related ProductsASTM D 5035 (2006) Breaking Force and Elongation
17、 of Textile Fabrics (Strip Method)ASTM D 5199 (2001; R 2006) Measuring Nominal Thickness of GeosyntheticsASTM D 5261 (1992; R 2003) Measuring Mass Per Unit Area of GeotextilesGEOSYNTHETIC INSTITUTE (GSI)GSI GRI GC7 (1997) Determination of Adhesion and Bond Strength of Geocomposites1.3 SUBMITTALS*NOT
18、E: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates tha
19、t the submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in co
20、ntext of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ f
21、or Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bra
22、cketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval. information only. When used, a designa
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3105202008GEOSYNTHETICDRAINAGELAYER 土工 合成 材料 水层 PDF

链接地址:http://www.mydoc123.com/p-449682.html