1、*USACE / NAVFAC / AFCESA / NASA UFGS-23 54 16.00 10 (April 2008)-Preparing Activity: USACE SupersedingUFGS-23 54 16.00 10 (January 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION TABLE OF CONTENTSDIVISION 23 - HEATING, VENTILATING, AND AIR C
2、ONDITIONINGSECTION 23 54 16.00 10HEATING SYSTEM; GAS-FIRED HEATERS04/08PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 QUALITY ASSURANCE1.4 DELIVERY, STORAGE, AND HANDLING1.5 EXTRA MATERIALSPART 2 PRODUCTS2.1 MATERIALS AND EQUIPMENT2.1.1 General2.1.2 Nameplates2.1.3 Equipment Guards2.2 ELECTRICAL WORK
3、2.3 HEATERS2.3.1 Direct Fired Make-Up Air Heaters2.3.2 Indirect Fired Make-Up Heaters2.3.3 Unit Heaters2.3.4 Wall Furnace2.3.5 Duct Furnace2.3.6 Infrared Heaters2.4 THERMOSTATS2.5 VENT PIPING2.6 ELECTRIC AUTOMATIC VENT DAMPERS2.7 INSULATION2.8 FACTORY FINISHESPART 3 EXECUTION3.1 EXAMINATION3.2 INSTA
4、LLATION3.2.1 Heating Equipment3.2.2 Vents3.2.3 Gas Piping3.3 TRAININGSECTION 23 54 16.00 10 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.4 TESTING, ADJUSTING, AND BALANCING- End of Section Table of Contents -SECTION 23 54 16.00 10 Page 2Pr
5、ovided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-23 54 16.00 10 (April 2008)-Preparing Activity: USACE SupersedingUFGS-23 54 16.00 10 (January 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement w
6、ith UMRL dated March 2008*SECTION 23 54 16.00 10HEATING SYSTEM; GAS-FIRED HEATERS04/08*NOTE: This guide specification covers the requirements for gas-fired heaters, including unit heaters, wall furnaces, and infrared heaters.Edit this guide specification for project specific requirements by adding,
7、deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be dir
8、ected to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 REFERENCES*NOTE: This pa
9、ragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RI
10、D outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update SECTION 23 54 16.00 10 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-t
11、he issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications
12、 are referred to within the text by the basic designation only.CSA AMERICA, INC. (CSA/AM)CSA Directory (updated continuously online) Certified Products ListingsCSA/AM Z21.66 (1996; R 2006) Automatic Vent Damper Devices for Use with Gas-Fired AppliancesCSA/AM Z21.86 (2004) Vented Gas-Fired Gravity Sp
13、ace Heating AppliancesCSA/AM Z83.19 (2001; R 2005; Addenda 2007) Gas-Fired Infrared HeatersCSA/AM Z83.4 (2003; A 2004, 2006) Non-Circulating Direct Gas-Fired Industrial Air HeatersCSA/AM Z83.8 (2006) Gas Unit Heaters and Gas-Fired Duct FurnacesNATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)NEMA
14、 MG 1 (2007) Standard for Motors and GeneratorsNATIONAL FIRE PROTECTION ASSOCIATION (NFPA)NFPA 211 (2006) Chimneys, Fireplaces, Vents, and Solid Fuel-Burning AppliancesNFPA 54 (2006) National Fuel Gas CodeUNDERWRITERS LABORATORIES (UL)UL Gas “DO“ for District Office (Engineering Division or other or
15、ganization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed
16、 item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval. information only. When used, a designation following the “G“ designation identifies the office that will review the sub
17、mittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-02 Shop DrawingsDetail DrawingsInstallationDetail drawings as specified.SD-03 Product DataSpare PartsSpare parts data for each different item of materials and equipment specified.S
18、D-06 Test ReportsTesting, Adjusting, and BalancingTest reports shall be submitted in booklet form showing all field tests performed to adjust each component and all field tests performed to prove compliance with the specified performance criteria, upon completion and testing of the installed system.
19、 Each test report shall indicate the final position of controls.SD-10 Operation and Maintenance DataOperation and Maintenance InstructionsSECTION 23 54 16.00 10 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Six _ complete copies of operating
20、instructions outlining the step-by-step procedures required for system startup, operation and shutdown. The instructions shall include the manufacturers name, model number, service manual, parts list, and brief description of all equipment and basic operating features. Six _ complete copies of maint
21、enance instructions listing routine maintenance, possible breakdowns, repairs and troubleshooting guide. The instructions shall include simplified piping, wiring, and control diagrams for the system as installed.1.3 QUALITY ASSURANCE*NOTE: All Federal buildings must comply with Executive Order 13423
22、 and Public Law 109-58 (Energy Policy Act of 2005); whether new construction, replacement construction, or, to the greatest extent practical, refurbishment and system replacement. In order to comply with E.O. 13423 and the Energy Policy Act of 2005, building designs must achieve energy consumption l
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS23541600102008HEATINGSYSTEMGASFIREDHEATERS 供热 系统 燃气 加热器 PDF

链接地址:http://www.mydoc123.com/p-449655.html