1、*USACE / NAVFAC / AFCESA / NASA UFGS-23 52 43.00 10 (April 2008)-Preparing Activity: USACE SupersedingUFGS-23 52 43.00 10 (January 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION TABLE OF CONTENTSDIVISION 23 - HEATING, VENTILATING, AND AIR C
2、ONDITIONINGSECTION 23 52 43.00 10HEAT RECOVERY BOILERS04/08PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.4.1 Welding1.4.2 Conformance with Agency Requirements1.4.3 Detailed Drawings1.5 DELIVERY, STORAGE, AND HANDLING1.6 EXTRA MATERIALSPART 2 PRODUCTS2.1 MATER
3、IALS AND EQUIPMENT2.1.1 Nameplates2.1.2 Prevention of Rust2.1.3 Equipment Guards and Access2.1.4 Use of Asbestos Products2.2 BOILERS2.2.1 Capacity2.2.2 Electrical Equipment2.2.2.1 Motor Ratings2.2.2.2 Motor Starters2.2.3 Boiler Design Requirements2.2.3.1 Radiant Heating2.2.3.2 Combustion Gas2.2.3.3
4、Radiant Heating Surface2.2.3.4 Boiler Operating Capacity2.2.3.5 Boiler Output Capacity2.2.3.6 Boiler Markings2.2.3.7 Noise2.3 BOILER DETAILS2.3.1 Materials2.3.2 Lubrication2.3.2.1 Lubrication FittingsSECTION 23 52 43.00 10 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted wi
5、thout license from IHS-,-,-2.3.2.2 Caution Plates2.3.3 Lifting Attachments2.3.4 Accessibility2.3.5 Interchangeability2.3.6 Surfaces2.3.7 Fastening Devices2.3.8 Electrical2.3.9 Castings and Forgings2.3.10 Welding, Brazing, Soldering, Riveting, or Wiring2.3.11 Refractory and Insulation2.3.11.1 Insulat
6、ion2.3.11.2 Expansion Joints2.3.12 Boiler Setting2.3.12.1 Boiler Foundation2.3.12.2 Supports2.3.12.3 Shell2.3.12.4 Expansion and Contraction2.3.13 Water-Tube Boiler2.3.13.1 Drums or Dome Space2.3.13.2 Drum Outlets2.3.13.3 Tubes2.3.13.4 Baffles2.3.14 Fire-Tube Boiler2.3.15 Boiler Internals2.3.15.1 In
7、ternal Fittings2.3.15.2 Outlet Fittings2.3.15.3 Openings2.3.15.4 Settling Chamber2.3.16 Access Doors2.3.17 Miscellaneous Pipe Connections2.3.18 Observation Ports2.3.19 Test Holes2.3.20 Safety Devices2.3.21 Freeze Protection2.3.22 Fire Protection2.4 BOILER AUXILIARY EQUIPMENT2.4.1 Boiler Fittings and
8、 Appurtenances2.4.1.1 Water Column2.4.1.2 Low Water Cutoff2.4.1.3 Feed and Check Valves2.4.1.4 Continuous Blowdown Valve2.4.1.5 Safety Valves2.4.1.6 Steam Nonreturn Valves2.4.1.7 Feedwater Regulator2.4.1.8 Soot Blowers2.4.1.9 Drains2.4.2 Economizers2.4.3 Air Preheaters2.4.4 Draft Fans2.4.5 Flue Duct
9、ing2.4.6 Breaching2.4.7 Flue Gas Inlet Damper2.4.8 Flue Gas Discharge Dampers2.4.9 Blowoff Tank2.4.10 Boiler Feed Pumps2.4.10.1 Casings2.4.10.2 Pump Base2.4.10.3 Pump Couplings2.4.10.4 Pump Relief ValveSECTION 23 52 43.00 10 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted
10、without license from IHS-,-,-2.4.10.5 Pump Shutoff Valve2.4.10.6 Steam Turbines2.4.10.7 Electric Motor Drives2.4.10.8 Shop Hydrostatic Testing2.4.10.9 Control Location2.4.11 Condensate Pumps2.4.11.1 Design Conditions2.4.11.2 Condensate Pump Drives2.4.11.3 Condensate Pump Auxiliaries2.4.12 Emergency
11、Interlock2.4.13 Calorimeter2.5 CONDENSATE TANK AND ACCESSORIES2.5.1 Condensate Tank2.5.2 Feedwater Makeup Valve2.5.3 Overflow Trap2.5.4 Tank Connection and Controls2.5.5 Design Conditions2.5.6 Detail Specifications2.5.7 Condensate Tank Trim2.5.8 Additional Requirements2.6 HEAT EXCHANGERS2.7 DEAERATI
12、NG FEEDWATER HEATER2.7.1 Design Conditions2.7.2 Detail Specifications2.7.3 Deaerator Trim2.7.4 Additional Requirements2.7.5 Performance Guarantee2.8 PIPING2.9 CHEMICAL TREATMENT AND WATER SOFTENING EQUIPMENT2.9.1 Chemical Feeder2.9.2 Pumps and Tanks2.9.3 Water Softening Equipment2.10 BOILER CONTROL
13、EQUIPMENT2.10.1 Positioning Type2.10.2 Equipment2.10.3 Boiler System Operation2.10.4 Damper Control2.10.5 Draft Fan Control2.10.6 Soot Blower2.10.7 Boiler Limit Controls2.10.7.1 Low-Water Cutoffs2.10.7.2 High-Pressure Limit Switch2.10.7.3 Draft Loss Interlock2.10.8 Instrument Control Panel2.10.8.1 P
14、anel Details2.10.8.2 Recorders2.10.8.3 Panel Display2.10.8.4 Identification2.10.8.5 System Diagram2.10.9 Pilot Lights2.10.10 Clock2.10.11 Alarm Annunciator Panel2.10.12 Steam Flowmeters2.10.12.1 Orifice Plate2.10.12.2 Flow Transmitters2.10.13 Boiler Feedwater Flow Meters2.10.13.1 Indicating Feedwate
15、r Meter Receivers2.10.13.2 Indicating, Recording, and Integrating Receivers2.10.14 Blowoff Sample CoolerSECTION 23 52 43.00 10 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.10.15 Temperature Indicators2.10.15.1 Thermometers2.10.15.2 Thermoc
16、ouples2.10.15.3 Indicating, Recording Pyrometers2.10.16 Draft Indicator and Control2.10.17 Pressure Gauges2.10.17.1 Pressure Gauges (Panel)2.10.17.2 Pressure Gauges (Local)2.10.18 Feedwater Temperature and Pressure Recorder2.10.19 Condensate Flowmeter2.11 TOOLS2.11.1 Tube Cleaner2.11.2 Tube Brush2.1
17、1.3 Smoke Pipe Cleaner2.11.4 Wrenches and Gaskets2.12 PAINTING AND FINISHING2.12.1 Preventing Corrosion2.12.2 Treatment2.12.3 Boiler Coating2.12.4 Equipment Coating2.13 FACTORY TESTSPART 3 EXECUTION3.1 EXAMINATION3.2 INSTALLATION3.2.1 Piping3.2.2 Field Painting3.2.3 Insulation3.2.4 Foundation3.2.5 E
18、quipment Structural Support3.2.5.1 Structural Steel3.2.5.2 Support Steel3.2.5.3 Column Base Plates3.2.5.4 Anchor Bolts3.2.6 Stack Support3.2.7 Catwalks and Access Platforms3.2.8 Control System Installation3.2.9 Field Tubing3.2.9.1 Tubing Supports3.2.9.2 Air Supply3.2.10 Electrical3.2.10.1 Cable Cond
19、uctor Identification3.2.10.2 Relays3.2.11 Steam Flowmeter Installation3.3 MANUFACTURERS SERVICES3.4 TESTING3.4.1 General3.4.1.1 Schedule for Testing3.4.1.2 Visual Inspection3.4.1.3 Repairs3.4.2 Instrumentation Tests3.4.3 Dielectric Tests3.4.4 Control Tests3.4.5 Necessary Temporary Piping3.4.6 Test o
20、f Deaerating Feedwater Heater3.4.7 Test of Water Treatment Equipment3.4.8 Hydrostatic Tests3.4.9 Test for Steam Purity and Water Level StabilitySECTION 23 52 43.00 10 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.4.9.1 Steam Tests3.4.9.2 Wa
21、ter Level Stability Test3.4.10 Performance Tests3.5 CLEANING OF BOILERS AND PIPING3.6 FRAMED INSTRUCTIONS3.7 OPERATING TEST3.8 FIELD TRAINING- End of Section Table of Contents -SECTION 23 52 43.00 10 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-
22、,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-23 52 43.00 10 (April 2008)-Preparing Activity: USACE SupersedingUFGS-23 52 43.00 10 (January 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION 23 52 43.00 10HEAT RECOVERY BOILERS04/08*NOTE: This guide
23、specification covers the requirements for both fire-tube and water-tube heat recovery, steam generating boilers with individual capacities from 907 to 136,000 kg (2,000 to 300,000 pounds) of steam per hour.Edit this guide specification for project specific requirements by adding, deleting, or revisi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS23524300102008HEATRECOVERYBOILERS 回收 锅炉 PDF

链接地址:http://www.mydoc123.com/p-449654.html