ARMY UFGS-23 52 00-2008 HEATING BOILERS《加热锅炉》.pdf
《ARMY UFGS-23 52 00-2008 HEATING BOILERS《加热锅炉》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-23 52 00-2008 HEATING BOILERS《加热锅炉》.pdf(79页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-23 52 00 (April 2008)-Preparing Activity: USACE SupersedingUFGS-23 52 00.00 10 (January 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION TABLE OF CONTENTSDIVISION 23 - HEATING, VENTILATING, AND AIR CONDITI
2、ONINGSECTION 23 52 00HEATING BOILERS04/08PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 WELDING1.4 DELIVERY, STORAGE, AND HANDLING1.5 EXTRA MATERIALSPART 2 PRODUCTS2.1 MATERIALS AND EQUIPMENT2.1.1 Standard Products2.1.2 Asbestos Prohibition2.1.3 Nameplates2.1.4 Equipment Guards2.2 BOILERS2.2.1 Firetu
3、be Boiler2.2.2 Watertube Boiler2.2.3 Cast Iron Boiler2.2.4 Condensing Boiler2.2.5 Modular Configuration2.2.6 Hot Water Heating Boilers2.2.7 Steam Heating Boilers2.3 FUEL BURNING EQUIPMENT2.3.1 Burners2.3.1.1 Gas and Combination Gas-Oil Fired Burners and Controls2.3.1.2 Oil-Fired Burners and Controls
4、2.3.1.3 Steam or Air Atomizer2.3.1.4 Mechanical pressure atomizer2.3.2 Draft Fans2.3.2.1 Draft Fan Control2.3.2.2 Draft Fan Drives2.3.3 Draft Damper2.3.4 Ductwork2.4 COMBUSTION CONTROL EQUIPMENT2.4.1 Pneumatic ControlsSECTION 23 52 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking
5、permitted without license from IHS-,-,-2.4.1.1 Air Compressor Unit2.4.1.2 Air Receiver2.4.2 Electrical controls2.4.3 Water Temperature Controller2.4.4 Steam Pressure Controller2.4.5 Boiler Plant Master Controller2.4.6 Boiler Combustion Controls and Positioners2.4.7 Combustion Safety Controls and Equ
6、ipment2.4.7.1 Low-water Cutoff2.4.7.2 Water Flow Interlock2.5 PUMPS2.5.1 Fuel Oil Pumping and Heating Sets2.5.2 Hot Water and Boiler Circulating Pumps2.5.3 Condensate Pumping Unit2.5.3.1 Controls for Space Heating Steam Loads Only2.5.3.2 Space Heating and Steam Loads or Distribution Lines2.5.3.3 Rat
7、ing and Testing2.5.4 Vacuum Pumping Unit2.6 COLD WATER CONNECTIONS2.7 RADIATORS AND CONVECTORS2.8 RADIANT FLOOR HEATING SYSTEMS2.8.1 Tubing2.8.2 Joints2.8.3 Manifold2.9 UNIT HEATERS2.9.1 Propeller Fan Heaters2.9.2 Centrifugal Fan Heaters2.9.3 Heating Elements2.9.4 Motors2.9.5 Motor Switches2.9.6 Con
8、trols2.10 HEATING AND VENTILATING UNITS2.11 AIR HANDLING UNITS2.12 FITTINGS AND ACCESSORIES2.12.1 Soot Blowers2.12.1.1 Air Compressor Unit2.12.1.2 Air Receiver2.12.2 Continuous Emissions Monitoring2.12.2.1 Gaseous Emission Monitors2.12.2.2 Flue Gas Flow Monitor2.12.2.3 Particulate Matter Monitor2.12
9、.2.4 Wiring2.12.3 Tankless Water Heater2.12.4 Conventional Breeching and Stacks2.12.4.1 Breeching2.12.4.2 Stacks2.12.5 Direct Vents2.12.5.1 Combustion Air Intake Vent2.12.5.2 Exhaust Vent2.12.6 Expansion Tank2.12.7 Air Separator2.12.8 Filters2.12.9 Foundation (Setting) Materials2.12.9.1 Firebrick2.1
10、2.9.2 Tile2.12.9.3 Insulating Brick2.12.9.4 Refractory Mortar2.12.9.5 Castable Refractories2.12.10 Steel SheetsSECTION 23 52 00 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.12.10.1 Galvanized Steel2.12.10.2 Uncoated Steel2.12.11 Gaskets2.1
11、2.12 Steel Pipe and Fittings2.12.12.1 Steel Pipe2.12.12.2 Steel Pipe Fittings2.12.12.3 Steel Flanges2.12.12.4 Welded Fittings2.12.12.5 Cast-Iron Fittings2.12.12.6 Malleable-Iron Fittings2.12.12.7 Unions2.12.12.8 Threads2.12.12.9 Grooved Mechanical fittings2.12.13 Copper Tubing and Fittings2.12.13.1
12、Copper Tubing2.12.13.2 Solder-Joint Pressure Fittings2.12.13.3 Flared Fittings2.12.13.4 Adapters2.12.13.5 Threaded Fittings2.12.13.6 Brazing Material2.12.13.7 Brazing Flux2.12.13.8 Solder Material2.12.13.9 Solder Flux2.12.13.10 Grooved Mechanical Fittings2.12.14 Dielectric Waterways and Flanges2.12.
13、15 Flexible Pipe Connectors2.12.16 Pipe Supports2.12.17 Pipe Expansion2.12.17.1 Expansion Loops2.12.17.2 Expansion Joints2.12.18 Valves2.12.18.1 Gate Valves2.12.18.2 Globe Valves2.12.18.3 Check Valves2.12.18.4 Angle Valves2.12.18.5 Ball Valves2.12.18.6 Plug Valves2.12.18.7 Grooved End Valves2.12.18.
14、8 Balancing Valves2.12.18.9 Automatic Flow Control Valves2.12.18.10 Butterfly Valves2.12.18.11 Drain valves2.12.18.12 Safety Valves2.12.19 Strainers2.12.20 Pressure Gauges2.12.21 Thermometers2.12.22 Air Vents2.12.22.1 Manual Air Vents2.12.22.2 Automatic Air Vents2.12.23 Steam Traps2.12.23.1 Thermost
15、atic Traps2.12.23.2 Float-and-Thermostatic Traps2.12.23.3 Inverted Bucket Traps2.13 ELECTRICAL EQUIPMENT2.13.1 Motor Ratings2.13.2 Motor Controls2.14 INSULATION2.15 TOOLS2.15.1 Breeching CleanerSECTION 23 52 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without licens
16、e from IHS-,-,-2.15.2 Tube Cleaner2.15.3 Tube Brush2.15.4 Wrenches2.16 FUEL OIL STORAGE SYSTEM2.17 BOILER WATER TREATMENT2.17.1 MakeUp Water Analysis2.17.2 Boiler Water Limits2.17.3 Water Softening System2.17.4 Chemical Feed Pumps2.17.5 Tanks2.17.6 Injection Assemblies2.17.7 Water Meter2.17.8 Water
17、Treatment Control Panel2.17.9 Sequence of Operation2.17.10 Chemical Shot Feeder2.17.11 Chemical Piping2.17.12 Test Kits2.17.13 Glycol Feed System2.17.13.1 Supply Tank and Stand2.17.13.2 Glycol Pump2.17.13.3 Pressure Switch2.17.13.4 Level Switch2.17.13.5 Control PanelPART 3 EXECUTION3.1 EXAMINATION3.
18、2 ERECTION OF BOILER AND AUXILIARY EQUIPMENT3.3 PIPING INSTALLATION3.3.1 Hot Water Piping and Fittings3.3.2 Vent Piping and Fittings3.3.3 Gauge Piping3.3.4 Steam Piping and Fittings3.3.5 Condensate Return Pipe and Fittings3.3.6 Joints3.3.6.1 Threaded Joints3.3.6.2 Welded Joints3.3.6.3 Grooved Mechan
19、ical Joints3.3.6.4 Flared and Brazed Copper Pipe and Tubing3.3.6.5 Soldered Joints3.3.6.6 Copper Tube Extracted Joint3.3.7 Flanges and Unions3.3.8 Branch Connections3.3.8.1 Branch Connections for Hot Water Systems3.3.8.2 Branch Connections for Steam Systems3.3.9 Steam Connections to Equipment3.3.10
20、Steam Risers3.3.11 Air Vents for Steam Systems3.3.12 Flared, Brazed, and Soldered Copper Pipe and Tubing3.3.13 Copper Tube Extracted Joint3.3.14 Supports3.3.14.1 Seismic Requirements for Supports and Structural Bracing3.3.14.2 Pipe Hangers, Inserts, and Supports3.3.14.3 Multiple Pipe Runs3.3.15 Anch
21、ors3.3.16 Valves3.3.17 Pipe Sleeves3.3.17.1 Pipes Passing Through Waterproofing Membranes3.3.17.2 Optional Modular Mechanical Sealing AssemblySECTION 23 52 00 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.3.17.3 Optional Counterflashing3.3.
22、17.4 Fire Seal3.3.18 Balancing Valves3.3.19 Thermometer Wells3.3.20 Air Vents3.3.21 Escutcheons3.3.22 Drains3.3.23 Strainer Blow-Down Piping3.3.24 Direct Venting for Combustion Intake Air and Exhaust Air3.4 GAS FUEL SYSTEM3.5 FUEL OIL SYSTEM3.5.1 Piping and Storage Tank3.5.2 Fuel-Oil Storage Tank He
23、ating-Coil Piping3.5.3 Automatic Safety Shutoff Valve3.5.4 Earthwork3.6 RADIANT FLOOR HEATING SYSTEM3.6.1 Concrete Slab construction3.6.2 Wooden Floor Construction3.6.3 Penetrations to Fire Rated Assemblies3.7 COLOR CODE MARKING AND FIELD PAINTING3.8 MANUFACTURERS SERVICES3.9 TEST OF BACKFLOW PREVEN
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS2352002008HEATINGBOILERS 加热 锅炉 PDF
