ARMY UFGS-09 97 30-2009 PREPARATION OF HISTORIC WOOD AND METAL SURFACES FOR PAINTING《历史木质和金属涂布面准备工作》.pdf
《ARMY UFGS-09 97 30-2009 PREPARATION OF HISTORIC WOOD AND METAL SURFACES FOR PAINTING《历史木质和金属涂布面准备工作》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-09 97 30-2009 PREPARATION OF HISTORIC WOOD AND METAL SURFACES FOR PAINTING《历史木质和金属涂布面准备工作》.pdf(13页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-09 97 30 (May 2009)-Preparing Activity: USACE SupersedingUFGS-09 97 30 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2009*SECTION TABLE OF CONTENTSDIVISION 09 - FINISHESSECTION 09 97 30PREPARATION OF HISTORIC
2、 WOOD AND METAL SURFACES FOR PAINTING05/09PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.4.1 Worker Exposures1.4.2 Training1.4.3 Coordination1.4.4 Qualifications1.5 DELIVERY, STORAGE, AND HANDLING1.6 ENVIRONMENTAL REQUIREMENTSPART 2 PRODUCTS2.1 PAINT REMOVERS2
3、.2 EPOXY CONSOLIDANTS2.2.1 Liquid Consolidant2.2.2 Epoxy PastePART 3 EXECUTION3.1 GENERAL REQUIREMENTS3.2 VENTILATION3.3 PROTECTION OF AREAS NOT TO BE PAINTED3.4 CLEANING OF SURFACES3.5 EXISTING PAINT3.6 PAINT REMOVAL3.6.1 Chemical Paint Removers3.6.2 Lead Paint3.7 SURFACE PREPARATION3.8 WOOD SURFAC
4、ES3.8.1 Interior Wood Surfaces3.8.2 Wood Repair3.8.2.1 Epoxy Wood Repair3.8.2.2 Epoxy Consolidant and Epoxy PasteSECTION 09 97 30 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.8.3 Exposed Ferrous Metals3.8.4 Finishing Nails3.8.5 Wood Preser
5、vative3.9 METAL SURFACES3.9.1 Ferrous Surfaces3.9.2 Nonferrous Metallic Surfaces3.9.2.1 Aluminum3.9.2.2 Zinc3.10 TIMING3.11 SURFACES TO BE PREPARED FOR PAINTING3.12 CLEANING- End of Section Table of Contents -SECTION 09 97 30 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted
6、 without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-09 97 30 (May 2009)-Preparing Activity: USACE SupersedingUFGS-09 97 30 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2009*SECTION 09 97 30PREPARATION OF HISTORIC WOOD AND METAL S
7、URFACES FOR PAINTING05/09*NOTE: This guide specification covers the requirements for preparation for painting wood and metal surfaces in historic structures.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable i
8、tems(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of
9、technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the gu
10、ide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place t
11、he reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update SECTION 09 97 30 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-the issue dates.References not used in the text will automatically be delet
12、ed from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.AMERICAN CO
13、NFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH)ACGIH 0100Doc (2005) Documentation of the Threshold Limit Values and Biological Exposure IndicesASTM INTERNATIONAL (ASTM)ASTM D 1730 (2003) Standard Practices for Preparation of Aluminum and Aluminum-Alloy Surfaces for PaintingASTM D 1731 (2003)
14、Preparation of Hot-Dip Aluminum Surfaces for PaintingASTM D 3274 (1995; R 2002) Evaluating Degree of Surface Disfigurement of Paint Films by Microbial (Fungal or Algal) Growth or Soil and Dirt AccumulationASTM D 3359 (2008) Measuring Adhesion by Tape TestASTM D 4214 (2007) Standard Test Method for E
15、valuating the Degree of Chalking of Exterior Paint FilmsTHE SOCIETY FOR PROTECTIVE COATINGS (SSPC)SSPC PA Guide 5 (2002; E 2004) Guide to Maintenance Coating of Steel Structures in Atmospheric ServiceSSPC SP 1 (1982; E 2004) Solvent CleaningSSPC SP 10 (2007) Near-White Blast CleaningSSPC SP 2 (1982;
16、 E 2004) Hand Tool CleaningSSPC SP 3 (2004; E 2004) Power Tool CleaningSSPC SP 5 (2007) White Metal Blast CleaningSSPC SP 6 (2007) Commercial Blast CleaningSSPC SP 7 (2007) Brush-Off Blast CleaningSECTION 09 97 30 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without lic
17、ense from IHS-,-,-1.2 SYSTEM DESCRIPTION*NOTE: The Federal Clean Air Act requires each state to meet the National Ambient Air Quality Standards. In addition, each state or local government may impose more restrictive requirements. States with areas identified as exceeding EPA standards for ozone mus
18、t adopt limits on the volatile organic compound (VOC) content of paint removers, wood preservatives, solvents and other chemical preparation materials. Therefore, the designer should determine the local restrictions and eliminate prohibited materials. It may be necessary to specify locally available
19、 commercial products which have been developed to meet local restrictions.The requirements for Contractor test report responsibilities should be modified regarding exempt materials.*The procedures proposed for the accomplishment of the work shall provide for safe conduct of the work, careful removal
20、 and disposition of materials specified to be salvaged, protection of property which is to remain undisturbed, and coordination with other work in progress. Include in the work plan a Safety and Health plan describing procedures for handling monitoring, and disposition of VOCs and other hazardous an
21、d toxic materials. The procedures shall include a detailed description of the methods and equipment to be used for each operation, and the sequence of operations. Test the materials designated by the Contracting Officer.1.3 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01
22、 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS0997302009PREPARATIONOFHISTORICWOODANDMETALSURFACESFORPAINTING 历史 木质 金属 布面 准备工作 PDF

链接地址:http://www.mydoc123.com/p-449608.html