1、*USACE / NAVFAC / AFCESA / NASA UFGS-09 24 23 (May 2009)-Preparing Activity: USACE SupersedingUFGS-09 24 23 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2009*SECTION TABLE OF CONTENTSDIVISION 09 - FINISHESSECTION 09 24 23STUCCO05/09PART 1 GENER
2、AL1.1 REFERENCES1.2 SUBMITTALS1.3 QUALITY ASSURANCE1.4 DELIVERY, STORAGE, AND HANDLING1.5 ENVIRONMENTAL REQUIREMENTSPART 2 PRODUCTS2.1 PORTLAND CEMENT2.2 COLORED STUCCO FINISH COAT2.3 LIME2.4 SAND2.5 ACCESSORIES2.6 STEEL FRAMING2.7 METAL LATH2.8 WATERPART 3 EXECUTION3.1 FRAMING3.2 CONTROL JOINTS3.3
3、LATH3.3.1 Steel and Wood Supports3.3.2 On Concrete and Masonry3.3.3 Over Metal Lintels and Flashings3.3.4 Special Shapes, Profiles, and Contours3.4 FURRING3.5 PREPARATION OF SURFACES3.6 PROPORTIONS AND MIXING3.7 STUCCO APPLICATION3.7.1 Workmanship3.7.2 Scratch Coat3.7.3 Brown Coat3.7.4 Finish CoatSE
4、CTION 09 24 23 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.7.5 Surface Tolerance3.8 CURING AND PROTECTION3.9 PATCHING AND POINTING- End of Section Table of Contents -SECTION 09 24 23 Page 2Provided by IHSNot for ResaleNo reproduction or n
5、etworking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-09 24 23 (May 2009)-Preparing Activity: USACE SupersedingUFGS-09 24 23 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2009*SECTION 09 24 23STUCCO05/09*NOTE: Thi
6、s section covers requirements for stucco, including associated framing and lathing.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requireme
7、nts not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telepho
8、ne number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: At paragraph SUBMITTALS, SD-04 Samples; for large projects, select the wording to require a jobsite sample panel.*1.1 REFERENCES*NOTE: This paragraph is used to li
9、st the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.SECTION 09 24 23 Page 3Provided by IHSNot for ResaleNo reproduction or networking permit
10、ted without license from IHS-,-,-Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References n
11、ot used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the
12、 text by the basic designation only.ASTM INTERNATIONAL (ASTM)ASTM A 185/A 185M (2007) Standard Specification for Steel Welded Wire Reinforcement, Plain, for ConcreteASTM C 1032 (2006) Standard Specification for Woven Wire Plaster BaseASTM C 1063 (2008) Standard Practice for Installation of Lathing a
13、nd Furring to Receive Interior and Exterior Portland Cement-Based PlasterASTM C 150 (2007) Standard Specification for Portland CementASTM C 206 (2003) Standard Specification for Finishing Hydrated LimeASTM C 841 (2003e1; R 2008) Installation of Interior Lathing and FurringASTM C 847 (2006) Standard
14、Specification for Metal LathASTM C 897 (2005) Aggregate for Job-Mixed Portland Cement-Based PlastersASTM C 926 (2006) Application of Portland Cement-Based PlasterASTM C 933 (2007b) Welded Wire LathASTM D 1784 (2008) Standard Specification for Rigid Poly(Vinyl Chloride) (PVC) Compounds and Chlorinate
15、d Poly(Vinyl Chloride) (CPVC) Compounds1.2 SUBMITTALS*NOTE: Review submittal description (SD) definitions SECTION 09 24 23 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to r
16、eflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” i
17、f the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters withi
18、n the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“
19、for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government appro
20、val is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval. information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. The following
21、shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-02 Shop DrawingsLathDrawings showing details of construction for reinforcement, furring, and grounds; including manufacturers installation instructions for stucco materials, and locations where each mix and coating thickn
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS0924232009STUCCO 灰泥 PDF