ARMY UFGS-09 06 90-2009 COLOR SCHEDULE《颜色目录》.pdf
《ARMY UFGS-09 06 90-2009 COLOR SCHEDULE《颜色目录》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-09 06 90-2009 COLOR SCHEDULE《颜色目录》.pdf(16页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-09 06 90 (May 2009)-Preparing Activity: USACE SupersedingUFGS-09 06 90 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2009*SECTION TABLE OF CONTENTSDIVISION 09 - FINISHESSECTION 09 06 90COLOR SCHEDULE05/09PART
2、 1 GENERAL1.1 SYSTEM DESCRIPTION1.2 SUBMITTALSPART 2 PRODUCTS2.1 REFERENCE TO MANUFACTURERS COLOR2.2 COLOR SCHEDULE2.2.1 Exterior Walls2.2.1.1 Brick:2.2.1.2 Mortar:2.2.1.3 Concrete Masonry Units:2.2.1.4 Paint:2.2.1.5 Metal Wall Panels, Hardware, and Associated Trim:2.2.1.6 Insulation and Finish Syst
3、em:2.2.1.7 Precast Concrete:2.2.1.8 Precast Stone:2.2.1.9 Glass and Glazing:2.2.1.10 Cement Board Siding and Trim:2.2.1.11 Cultured Stone:2.2.2 Exterior Trim2.2.2.1 Steel Doors and Door Frames:2.2.2.2 Steel Windows (mullion, muntin, sash, trim, and sill):2.2.2.3 Aluminum Doors and Door Frames:2.2.2.
4、4 Aluminum Windows (mullion, muntin, sash, trim, and sill):2.2.2.5 Wood Clad Windows (mullion, muntin, sash, trim, and sill):2.2.2.6 Wood Stain:2.2.2.7 Fascia:2.2.2.8 Soffits and Ceilings:2.2.2.9 Overhangs:2.2.2.10 Downspouts, Gutters, Louvers, and Flashings:2.2.2.11 Coping:2.2.2.12 Precast Concrete
5、 Caps, _ and Sills:2.2.2.13 Precast Stone Caps, _ and Sills:2.2.2.14 Caulking and Sealants:SECTION 09 06 90 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.2.2.15 Stringers and Stair Framing:2.2.2.16 Control Joints:2.2.2.17 Expansion Joint an
6、d/or Covers:2.2.2.18 Handrails:2.2.2.19 Signage:2.2.3 Exterior Roof2.2.3.1 Metal:2.2.3.2 Shingles:2.2.3.3 EPDM:2.2.3.4 Penetrations:2.2.4 Interior Floor Finishes2.2.4.1 Carpet:2.2.4.2 Carpet Tile:2.2.4.3 Vinyl Composition Tile:2.2.4.4 Sheet Vinyl:2.2.4.5 Rubber Tile:2.2.4.6 Stair Treads, Kick Strips
7、, and Risers:2.2.4.7 Quarry Tile:2.2.4.8 Ceramic Tile:2.2.4.9 Porcelain Tile:2.2.4.10 Grout:2.2.4.11 Plastic Laminate:2.2.4.12 Wood:2.2.4.13 Static DissipativeConductive Tile:2.2.4.14 Concrete PaintStain_:2.2.4.15 Industrial Floor Coating:2.2.5 Interior Base Finishes2.2.5.1 Resilient Base and Moldin
8、gs:2.2.5.2 Quarry Tile:2.2.5.3 Ceramic Tile:2.2.5.4 Porcelain Tile:2.2.5.5 Grout:2.2.5.6 Coved Sheet Vinyl:2.2.5.7 Glazed Structural Units:2.2.5.8 Prefaced Concrete Masonry Units:2.2.5.9 Brick:2.2.5.10 Mortar:2.2.5.11 Paint:2.2.5.12 Wood:2.2.6 Interior Wall Finishes2.2.6.1 Paint:2.2.6.2 Vinyl Wall C
9、overing:2.2.6.3 Fabric Wall Covering:2.2.6.4 Acoustical Wall Covering:2.2.6.5 Ceramic Tile:2.2.6.6 Ceramic Tile Grout:2.2.6.7 Brick:2.2.6.8 Mortar:2.2.6.9 Metal Liner Panels:2.2.6.10 Glazed Structural Units:2.2.6.11 Prefaced Concrete Masonry Units:2.2.6.12 Columns:2.2.7 Interior Ceiling Finishes2.2.
10、7.1 Acoustical Tile and Grid:2.2.7.2 Paint:2.2.7.3 Metal Deck:2.2.7.4 Structural Framing:2.2.8 Interior Trim2.2.8.1 Steel Doors:SECTION 09 06 90 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.2.8.2 Steel Door Frames:2.2.8.3 Steel Windows:2.2
11、.8.4 Aluminum Doors and Door Frames:2.2.8.5 Aluminum Windows :2.2.8.6 Wood Doors:2.2.8.7 Wood Stain:2.2.8.8 Window Sills:2.2.8.9 Fire Extinguisher Cabinets:2.2.8.10 Handrails:2.2.8.11 Ladders:2.2.8.12 Metal Stairs:2.2.8.13 Exposed Ductwork:2.2.8.14 Closet Shelving:2.2.8.15 Benches:2.2.9 Interior Win
12、dow Treatment2.2.9.1 Horizontal Blinds:2.2.9.2 Integral Blinds:2.2.9.3 Vertical Blinds:2.2.9.4 Drapery Hardware:2.2.9.5 Window Shades:2.2.10 Interior Miscellaneous2.2.10.1 Toilet Partitions and Urinal Screens:2.2.10.2 Plastic Laminate:2.2.10.3 Solid Surfacing Material:2.2.10.4 Casework:2.2.10.5 Sign
13、age Message Color:2.2.10.6 Signage Background Color:2.2.10.7 Operable Partitions:2.2.10.8 Acoustical Wall Panels:2.2.10.9 Corner Guards:2.2.10.10 Wall Switch Handles and Standard Receptacle Bodies:2.2.10.11 Electrical Device Cover Plates:2.2.10.12 Electrical Panels:2.2.10.13 Shower CurtainDoors:2.2.
14、10.14 Shower Wall Kits, Trim and Shower Pan:2.3 PLACEMENT SCHEDULEPART 3 EXECUTION (Not Applicable)- End of Section Table of Contents -SECTION 09 06 90 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-09 06 9
15、0 (May 2009)-Preparing Activity: USACE SupersedingUFGS-09 06 90 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2009*SECTION 09 06 90COLOR SCHEDULE05/09*NOTE: This guide specification covers the requirements for color of exterior and interior mate
16、rials and products.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets
17、are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS shou
18、ld be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 SYSTEM DESCRIPTIONThis section covers only the color of the exterior and interior materials and products that are exposed to view in the finished construction. The word “color“, as used herein, includes surface color and pattern.
19、Requirements for quality and method of installation are covered in other appropriate sections of the specifications. Specific locations where the various materials are required are shown on the drawings. Items not designated for color in this section may be specified in other sections. When color is
20、 not designated for items, the Contractor shall propose a color for approval.1.2 SUBMITTALS*SECTION 09 06 90 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCE
21、DURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked wit
22、h a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects,
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS0906902009COLORSCHEDULE 颜色 目录 PDF
