ARMY MIL-P-63334-1980 PANEL ASSEMBLY 11834831《面板组件 11834831》.pdf
《ARMY MIL-P-63334-1980 PANEL ASSEMBLY 11834831《面板组件 11834831》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-63334-1980 PANEL ASSEMBLY 11834831《面板组件 11834831》.pdf(16页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-F-13 926 Beneficial commenta (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commander, US Army Armament Research and Development Command, Attn. DRDAR-QA, Dover, New Jenrey 07801 by using the self-addressed Sta
2、ndardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. L MIL-P-14232 MIL-1-45607 MIL-P-63334 (AR) 15 February 1980 MILITARY SPECIFICATION PANEL ASSEMBLY: 11834831 This specification is approved for use by the U.S. Army Armament Research and Deve
3、lopment Command, and is available for use by all Departments and Agencies of the Department Defense. 1. SCOPE 1.1 This specification covers a transistorized panel assembly. It provides voltage control, distribution, regulating, and battery charging functions when energized with a direct current of b
4、etween 18 volts and 30 volts. The panel assembly also provides voltage control, regulating, and distribution functions when energized from an emergency direct current 6 volt battery power source. 2. APPLICABLF; DOCUMENTS 2.1 The following documents, of the issue in effect on data of invitation for b
5、ids or resquest for proposals, form a part of this specification to the extent specified herein. SPECIFICATIONS Military Fire Control Materiel: General Specification Parts, Equipment and Tools for Army Materiel: Inspection Equipment, Supply and Maintenance of Governing the Manufacturing and Inspecti
6、on of Packaging and Packing of STANDARDS Military MIL-STD-105 MIL-STD-109 MIL-STD-810 Sampling Procedures and Tables for Inspection by Quality Assurance Terms and Definitions Environmental Test Methods Attributes /- THIS DOCUMENT CONTAINS I PAGES. Provided by IHSNot for ResaleNo reproduction or netw
7、orking permitted without license from IHS-,-,-MIL-P-63334 12 7777906 0348527 7 W MIL-P-63334 (AR) DRAWINGS U.S. Army Armament Research and Development Command (ARRADCOM) F11834831 Panel Assembly F11748431 Schematic PACKAGING DATA SHEETS PS11834831 Packaging of Panel Assembly: 11834831 (Copies of spe
8、cifications, standards, drawings and packaging data sheets required by suppliers in connection with specific procurement functions should be obtained from the procuring activity 0.r as directed by the contracting officer,) 3. REQUIREMENTS 3.1 Materials. Materials shall be in accordance with the draw
9、ings, specifications, and standards which form a part of this specifications. 3.2 Fabrication. The panel assembly shall be manufactured in accordance with the applicable drawings listed in Section 2 and drawings pertaining thereto. 3.3 General specification. The contractor shall be responsible for c
10、ompliance with the following requirements of MIL-F-13926: a. Order of precedence b. Dimensions and tolerances c. Inorganic protection surface finishes d. Part identification and marking e. Workmanship f. Soldering electrical connections 3.4 Environmental service conditions. Unless otherwise specifie
11、d, the panel assembly shall meet all requirements of this specification at an ambient temperature between +600 and +900 Fahrenheit (F). 3.4.1 Vibration. the panel assembly shall show no evidence of physical failure due to being vibrated successively along three (3) mutually perpendi- cular axes. Vib
12、ration shall be a simple harmonic motion, the frequency varying either linearly or logarithmically from 5 to 55 to 5 CPS in five (5) minute cycles for a total of 15 minutes along each of the axes. The amplitude of vibration shall be maintained constant at 1/64 inch (1/32 inch total excur- sion) (See
13、 note under Table IV). 2 4 o Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-b3339 12 W 77777Ob 0398528 O MIL-P-6 3334 (AR) 3.4.2 Shock. The panel assembly shall shoG no evidence of physical failure after being subjected to a minimum of 6 shock
14、s of at least 30 gravi- tational units (gs) with each shock being 11 4-1 milliseconds duration. 3.4.3 Operating temperatures. The panel assembly shall meet all the requirements of 3.6 while thermally stabilized at temperatures of -650 and +1500F, 3.4.4 Storage temperatures. After having been thermal
15、ly stabilized at temperatures of -800 and +1600F, the panel assembly shall show no evidence of damage and shall be capable of meeting all requirements of this specifi- cation at ambient temperatures between 60 and 90F. 3.5 Electrical service conditions. 3.5.1 Primary power source. The panel assembly
16、 shall meet the applicable requirements of 3.6 when energized with a primary power source of 18 VDC to 30 VDC. respect to J1-J in accordance with Drawing F11748431 for Panel Assembly 11834831. This voltage shall be applied in positive polarity to.J1-H with 3.5.2 Emergency power source. The requireme
17、nts of 3.6, applicable to This voltage shall be applied in positive this source, shall be met when the panel assembly is energized with an emer- gency plower source of 6.0 VDC, polarity to J1-E with respect to J1-D, for the applicable panel assembly. 3.5.3 Input immunity to reverse polarity. The pan
18、el assembly shall not be damaged by the application of electrical potentials of 3.5.1 in reverse polarity. 3.5.4 Ground potential, When energized as specified in 3.5.1 exposed metallic surfaces of the panel assembly enclosure, exclusive of electrical terminations and sub-surface mounted parts, shall
19、 be at ground potential. 3.6 Performance. 3.6.1 Rheostat performance. The panel lamps (il) and reticle projector (R2) rheostats when rotated from an extreme clokwise (cw) to extreme counter- clockwise (ccw) position shall, exhibit no spasmodic performance throughout their range of rotation. 3.6.1.1
20、Rheostat R1. Rheostat R1 shall control total current as speci- fied in Table I, for each respective rheostat arm position and applied primary power source voltage. Switch S1 shall be in the “OFF“ position when meeting this requirement. +30 VDC to J1-H, GRD to J1-J. Primary bower shall be applies as
21、follows: 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-_-_- _-_- MIL-P-63334 12 = 7777906 0348529 2 m MIL-P-63334 (AR) TABLE I - Rl PERFORMANCE Primary Rheos tat Power Rheostat Wiper Arm Position Circuit Load DC amps Rl R1 R1 30 VDC extreme CW -
22、Min. Res. 30 VDC extreme CCW - Max. Res. 30 VDC OFF .28 + .O4 .185 T .O1 .12 - T .o1 3.6.1.2 Rheostat R2. Rheostat R2 output circuit shall exhibit the vol- tage specified in Table II for each respective circuit under the specified DC load conditions, rheostat arm positions, and applied battery power
23、, Switch S1 shall be in the “Emergency“ position and switch R2 shall be operated. TABLE II - R2 PERFORMANCE Primary Rheostat Power Rheostat Wiper Circuit Load Circuit Out- Arm Position DC amps puts DC Volts R2 6 VDC extreme CW - Min. Res. .700 5.6 + .4 1.7 T .2 R2 6 VDC Zero R2 6 VDC OFF - extreme C
24、CW - Max. Res. - - 3.6.1.3 Output of voltage regulated supplies. The battery charging, reticle projector, and high voltage oscillator supplies shall exhibit the vol- tage regulation specified in Table IV. This regulation shall exist over the indicated primary power source voltage and under the speci
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP633341980PANELASSEMBLY11834831 面板 组件 11834831 PDF

链接地址:http://www.mydoc123.com/p-446804.html