ARMY MIL-P-45455 E-1979 PROJECTILE 175MM HE M437 LOADING ASSEMBLING AND PACKING《M437式175 mm榴弹(HE)的装药 组装和包装》.pdf
《ARMY MIL-P-45455 E-1979 PROJECTILE 175MM HE M437 LOADING ASSEMBLING AND PACKING《M437式175 mm榴弹(HE)的装药 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-45455 E-1979 PROJECTILE 175MM HE M437 LOADING ASSEMBLING AND PACKING《M437式175 mm榴弹(HE)的装药 组装和包装》.pdf(27页珍藏版)》请在麦多课文档分享上搜索。
1、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-45455E 13 777770b 0307258 L MIL-P-45455E (AR) DRAWINGS (see 6.9) US ARMY ARMAMENT RESEARCH AND DEVELOPMENT COMMAND 8837902 - Projectile, 175MM, HE, M437A1 and M437A2, for 8857344 - Pallet for Proj
2、ectile, 175MM 175MM Gun Ml13 3. REQUIREMENTS 3.1 Materials. Materials and parts shall be in accordance with 3.1.1 Comp B - Clean explosive scrap. the applicable drawings and specifications. blended with virgin explosive only in an amount such that the 1.3% maximum desensitizer wax content will not b
3、e exceeded for the melt (see 4.5.5). Clean scrap produced in regular operations may be reused provided that it complies with the requirements for the grade of high explosive specified except for form. Scrap from floor sweepings, ventilation, and suction apparatus (other than from drilling operations
4、 specifically controlled to prevent contamination o? explosives) shall not be used (see 6.5). 3.2 Assembled projectile. The assembled projectile shall comply with all requirements specified on Drawing (dwg) 8837902, and with all requirements specified in the applicable specifications. Riser scrap sh
5、all be 3.3 Cavitation in high explosive charge 3.3.1 Cracks and projected cavities. Cracks and cavities within the explosive charge shall not exceed the requirements specified in Table I when determined in accordance with 4.5.1.1. Cavities having a maximum (max) projected length of 1/32 inch (in.) o
6、r less shall be disregarded. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-45455E 13 797970b 0307260 T MIL-P-4 54 55E (AR) max. dimension of
7、 any visible cavity in the faced surface of the charge shall not exceed 1/4 inch in any direction and the total area of all cavities shall not exceed 80 percent of the surface area. No individual point of explosive shall extend above the flat surface on which the liner would rest. (Cavities having a
8、 maximum dimension of 1/32 inch or less shall be disregarded in this computation as shall voids within the applicable forward region of the fuze well prescribed by drawing 8837902) . and shall be subject to the restrictions placed upon cavities, exccept that 80 percent of the projected length and 80
9、 percent of the projected area shall be considered for acceptance purposes. in Segment A and not more than a total of two transverse cracks shall be permitted in Segments B and C combined. Cracks shall be disregarded in Segment D, and DI. 3.3.5 Base separation. There shall be no base separation grea
10、ter than .O15 inches between the base of projectile and the charge. This pertains to a sectioned projectile after the post cycle heat. 3.3.3 Porous areas. Porous areas shall be treated as cavities 3.3.4 Cracked charges. NO transverse crack shall be permitted 3.4 Loading of high explosive 3.4.1 Matin
11、g surfaces. The mating surfaces of threads shall be free of caked explosive and all threads shall be free of foreign material. If a chemical cleaner is required, acetone or methylene chloride shall be used, Care shall be taken to prevent the chemical cleaner from coming into contact with the charge
12、and becoming entrapped in the projectile. projectile before loading or added to the projectile during initial pouring or cooling. coating shall not be loaded. shall be dry when the high explosive is poured into the projectile (see 4.4.2.1). 3.4.4 Projectile interior cavity. The interior cavity of th
13、e projectile prior to loading shall be free from foreign matter. 3.4.2 Solid explosives. Solid explosive shall not be in the 3.4.3 Coating. Projectile having the interior wall imperfectly The interior surface of the projectile 4 Provided by IHSNot for ResaleNo reproduction or networking permitted wi
14、thout license from IHS-,-,-MIL-P-45455E 13 M 7977906 03072h1 1 M - MIL-P-4 5 4 5 SE (AR) 3.4.5 Fuze well. The fuze well shall be free from any foreign 3.4.6 Unsolidified pool of paint. There shall be no unsolid- matter or loose explosive prior to assembly of the liner. ified pool of paint or blister
15、 in the bottom of the cavity prior to loading of the explosive. 3.4.7 Exterior surfaces. There shall be no explosive on the exterior surf ace of the projectile after loading. 3.4.8 Body cavity. The body cavity shall be free of scale, fins, burrs, draw marks-, laminations, imbedded foreign matter, pi
16、ts and sharp edges. 3.5 Proving ground test. The projectiles shall comply with the following requirements when tested as specified in 4.5.2. 3.5.1 Horizontal. range 3.5.1.1 The mean range of any group of projectiles shall vary not more than + 1% from the expected firing table range after correction
17、to standard conditions. 3.5.1.2 The horizontal range probable error shall be no greater 3.5.2 Deflection 3.5.2.1 The mean deflection of any group of projectiles shall vary not more than 5 10% from the expected firing table deflection after correction to standard conditions. than .25 percent of range
18、 after correction for velocity variation. 3.5.2.2 The probable error in deflection shall be no greater than .O6 percent of mean range. 3.5.3 Safety. There shall be no premature burst or indica- tion of metal parts failure in the gun bore or in flight before impact, when the loaded projectile is test
19、ed between 54,000 SI 58,000 pounds per square inch (psi) chamber pressure. 3.6 First Article inspection. This specification contains technical provisions for first article inspection. Requirements for the submission of first article samples by the contractor shall be as specified in the contract. 5
20、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-P-45455E 13 M 7777706 03072b2 3 W MIL-P-4 54553 (AR) 3.7 Exudation. After heat cycling of TNT and Comp B filled projectiles, there shall be no exudation in the fuze well or exterior of the projecti
21、le. 3.8 WorkmanshiE. The requirements of workmanship are as s.hown on the applicable drawing, in the applicable specifications and the follow i ng : 3.8.1 Cleaning. If required, the cleaning method shall not be injurious to any of the parts nor shall the parts be contaminated by the cleaning agent.
22、3.8.2 Protection of the rotating band. Care shall be exercised at all times so that the rotating band of each projectile will not be nicked or burred. 3.8.3 Painting. Painting shall comply with the requirements of the applicable drawing. esting and packing for shipment. Drying time prior to testing
23、shall be in accordance with the applicable specification. grease, chips, rust corrosion or other foreign matter, prior to inspection and shipping All paint shall be dry to the touch before 3.8.4 Foreign matter. No part or assembly shall contain dirt, 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibilit
24、y for inspection and standard quality assurance provisions. Unless otherwise specified herein or in the contract, the provisions of MIL-A-48078 shall apply and are hereby made a part of- this detail specification. inspections shall be performed on this item: 4.2 Classification of inspections. The fo
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP45455E1979PROJECTILE175MMHEM437LOADINGASSEMBLINGANDPACKINGM437 175 MM 榴弹 HE 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-446237.html