ARMY MIL-I-46224 E-1989 IGNITER ELECTRIC PRIMER M63 PARTS FOR AND LOADING ASSEMBLING AND PACKING《M63型电动雷管点火器零件的装卸 组装及包装》.pdf
《ARMY MIL-I-46224 E-1989 IGNITER ELECTRIC PRIMER M63 PARTS FOR AND LOADING ASSEMBLING AND PACKING《M63型电动雷管点火器零件的装卸 组装及包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-I-46224 E-1989 IGNITER ELECTRIC PRIMER M63 PARTS FOR AND LOADING ASSEMBLING AND PACKING《M63型电动雷管点火器零件的装卸 组装及包装》.pdf(25页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-I-46224E 13 II 9999906 0310072 8 m c3-3 74/9 (INCH-POUND I MIL-I-46224E (AR) 4 FEBRUARY 1989 SUPERSEDING MIL-I -46 2 24D 18 March 1975 MIL I TARY SPECIFICATION IGNITER, ELECTRIC, PRIMER, M63, PARTS FOR, AND LOADING ASSEMBLING AND PACKING This Specification is approved for use within the U. S. Ar
2、my Armament, Munitions and Chemical Command, and is available for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Saope. This specification covers the parts for, and the loading, assembling and packing for the Igniter, Electric, Primer, M63. 2. APPLICABLE DOCUMENTS 2.1
3、 Government documents 2.1.1 Specifications and standards. The following specifications and standards form a DaKt of this specification to the extent specified herein. these documents shall be,those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISS) and su
4、pplement thereto, cited in the solicitation. Unless othrwise specified, the issues of SPECIFICATIONS MI L I T ARY MIL-P-116 - Preservation, Packaging, Methods of MIL-P-223 - Powder,. Black MIL-A-48078 - Ammunition, Standard Quality Assurance Provisions, General Specification For Beneficial comments
5、(recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commander, U.S. Army Armament, Munitions, and Chemical Command, Attn. AMSMGQA, Picatinny Arsenal, New Jersey 07806-5MM by using the self-addressed Standardization DaC
6、ument Improvement Proposai (DD Form 1426) appearing at the end of this document or by letter. AMSC NIA mc 1390 ON STA- 4, Approved for public rele-; distribution is unlimited. -. THIS DOCUMENT CONTAINS PAGES. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from I
7、HS-,-,-MIL-1-46224E 13 7777706 0330073 T MIL-I-46224E (AR) STANDARDS MI L I TARY MIL-STD-105 - Sampling Procedures and Tables ,for MIL-STD-1169 - Packaging, Packing and Marking for Shipment MIL-STD-1234 - Pyrotechnics, Sampling, Inspection and Inspection by Attributes of Inert Ammunition Components
8、Testing (Unless otherwise indicated, copies of federal and military specifications, standards, and handbooks are available from the Naval Publications and Forms Center, (ATTN: NPODS), 5801 Tabor Avenue, Philadelphia, PA 19120-5099.) The following other Government documents, drawings, and publication
9、s form a part of this specification to the extent specified herein. Unless otherwise specified, the issues shall be those in effect on the date of the solicitation. U 2.1.2 Other Government documents, drawings, and publications. DRAWINGS U. S. ARMY ARMAMENT RESEARCH, DEVELOPMENT AND ENGINEERING CENT
10、ER (ARDEC) 8837897 Box, Set-up, Packing, Ammunition For Igniter, Electric, Primer M63 8837898 - Box, Packing, Ammunition for Igniter, Electric, Primer, M63 8839497 - Igniter, Electric, Primer, M63, 8839502 - Closing Plug Loading Assembly 8839503 - Plug, Closing 8839504 Body 8839505 Ignition Element
11、Assembly 8839509 - Retainer 9235760 - Igniter, Electric, M63 Metal Parts 2.2 Order of precedence. In the event of a conflict between the text of this specification and the references cited herein (except for associated detail specifications, specification sheets or MS standards), the text of this sp
12、ecification shall take precedence. Nothing in this specification, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-I-Yb224E 13 II 7777906 031
13、0094 I XIL-I-46224E (AR) 3. REQUIREMENTS 3.1 First article. When specified in the contract or purchase order, a sample shall be subjected to first article inspection in accordance with the technical provisions herein. (See 4.3). applicable drawings and specifications. 3.2 Materials. Materials shall
14、be in.accordance with 3.3 Metal parts. Component parts shall comply with all requirements specified on Dwg. 9235760 and in applicable specifications. 3.4 igniters. igniters shall comply with all requirements specified on Dwg. 8839497 and in applicable specifications. 3.5 Moisture content 3.5.1 Ignit
15、ion element charge. The moisture content of the 3.5.2 Black powder. The moisture content of the black powder at ignition element charge after drying shall not exceed 0.02 percent. the time of loading the closing plug shall not exceed 0.50 percent. 3.6 Electrical resistance. Electrical resistance bet
16、ween the ignition element and the body shall be not less than 0.80 ohms nor more than 1.80 ohms. 3.7 Functioning. The igniter shall function when a current of 1.25 amperes, maximum, is applied. 3.8 Non-functioning. The igniter shall not function when a current limited to 190 milliamperes, minimum, i
17、s applied. 3.9 Woxkmanship. All parts and assemblies shall be fabricated and loaded in a thorough workmanlike manner, and all manufacturing, processing, and assembly operations shall be correctly performed. They shall be clean and free of burrs, sharp edges, unblended radii, surface defects, chips,
18、dirt, grease and oil (except where specifically required) , corrosion products and other foreign matter. The cleaning method used shall not be injurious to any part or assembly nor shall they be contaminated by the cleaning agent. Exterior surface coatings shall be continuous except for a few light
19、scratches no? exposing base material. All required markings shall be neat and sharply defined. Required packing shall be dry. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-I-46224E (AR) 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for i
20、nspection. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the performance of al1 inspection requirements as specified herein. Except as otherwise specified in the contract or purchase order, the contractor may use his own or any other facilities suita
21、ble for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in this specification. 4.2.1 Responsibility for compliance. All items must meet all requirements of sections 3
22、and 5. The inspections set forth in this specification shall become a part of the contractors overall inspection system or quality program. The absence of any inspection requirements in this specification shall not relieve the contractor of the responsibility of assuring that all products or supplie
23、s submitted to the Government for acceptance comply with all requirements of the contract. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, nor does it commit the Government to acceptance of de f ec t ive ma ter i a 1 . 4.3 Classi
24、fication of inspection. The following types of inspections shall be conducted on this item. a. First Article Inspection (See 4.4) b. Quality Conformance Inspection (See 4.5) 4.4 First article inspection 4.4.1 Submission. The contractor shall submit a first article sample as designated by the Contrac
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILI46224E1989IGNITERELECTRICPRIMERM63PARTSFORANDLOADINGASSEMBLINGANDPACKINGM63 电动 雷管 点火器 零件 装卸 组装

链接地址:http://www.mydoc123.com/p-445380.html