ARMY MIL-F-63229-1979 FUZE PIBD XM740 (M740) SHOCK WAVE SENSOR FOR《XM740PIBD引信(M740)冲击波传感器》.pdf
《ARMY MIL-F-63229-1979 FUZE PIBD XM740 (M740) SHOCK WAVE SENSOR FOR《XM740PIBD引信(M740)冲击波传感器》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-F-63229-1979 FUZE PIBD XM740 (M740) SHOCK WAVE SENSOR FOR《XM740PIBD引信(M740)冲击波传感器》.pdf(18页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-F-63229 AR) 17 AWWST i 47 9 MILITARY SPECIFICATION FUZE, PIBD, XM740, SHOCK WAVE SENSOR FOR This specification is approved for use by U.S. Army Armament Research and Development Command and is available for use by all Departments and Agencies of the Department of Defense, 1.0 SCOPE 1.1 This spec
2、ification establishes the requirements for the manufacture and acceptance of the Shock Wave Sensor (SWS) critical item. 2.0 APPLICABLE DOCUMENTS 2.1 Government documents - Except as noted, the following documents of the issue in effect on date of invitation for bids or request for proposal form a pa
3、rt of this specification to the extent specified herein. PPP-T-97 Tape, Pressure Sensitive, Adhesive, Fi Rei nf orced Military MIL-B-117 Bag, Sleeve and Tubing - Interior Packag STANDARDS Military ament n9 MIL-STD- 105 * MIL-STD- 109 . MIL- STD- 129 Sampling Procedures and Tables for Inspection by A
4、ttributes Qual i ty Assurance Terms and Defini ti ons Marking for Shipment and Storage FSC: 1390 Beneficial coments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed-to: Conunander, US Army Armament Research and Developm
5、ent Comand, Attn: DRDAR-QA, Dover, New Jersey 07801 by using the self-addressed Standaraizatfon Docunent Irnprovenent Proposal (DD Form 1426) appearing at the end of this document or !by letter. A ;HE DOCUMENT CONTAINS Is) PAGES. - Provided by IHSNot for ResaleNo reproduction or networking permitted
6、 without license from IHS-,-,-MIL-F-63229( AR) MIL - STD- 33 1 MI L- STD-810 DRAW I NGS Army 9302271 9307240 I Performance Tests For Environmental Test Methods Container Sensor Assembly, Shock Wave Other Pub1 ications AR700 - 15 P,ackaging of Material (Copies of specifications, standards, drawings a
7、nd pub1 ications required by contractors in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer.) I I 3. O REQUIREMENTS 3.1 Item definition - The shock wave sensor (SWS) is mounted in a projectile and provides an ele
8、ctrical signal when subjected to shock caused by the projec- tile impacting a hard target. The SWS is a passive piezoelectric device and requires no electric power. . The SWS is mounted in either the axial or radial position within the projectile. Several sensors may be used to assure an immediate r
9、esponse to target impact conditions. 1- - 3.2 Character ist i cs 3.2.1 Performance 3.2.1.1 Direct current resistance - The direct current resistance from each termi na1 to the container shall be 10 megohms minimum. 3.2.1.2 Out ut si na1 - The SWS shall produce an output signal of 7.2 - + 3.6 3.2.2 E
10、nvironmental conditions - Except for temperature tests, these condi- . millivolts rms * w en es ed in accordance with 4.5.2.2. tions apply with the SWS mounted in a projectile or a simulated projectile. 3.2.2.1 High temperature - The SWS shall meet the perfogmance requirements specified in 3.2.1 whe
11、n stabilized at temperatures up to 145 F. I 3.2.2.2 Low tem erature - The SWS shall meet the performanEe requirements sDecified in *tabilized at temperatures down to -25 F. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-F-63227 13 7777706 034
12、5722 O - MILgF43229(AR) 3.2.2.3 Acceleration high 9 - The SWS shal.1 meet the performance requirements specified in 3.2.2 following exposure to acceleration of 9000 +1500, -300 gs at temperatures from -25OF to 145OF. The direction of acceleration is shown in Figure 1. The acceleration/time curve sha
13、ll have no discontinuities, and shall remain above 8000 GIs for at least 1.5 milliseconds. 3.2.2.4 Transportation vibration - The SWS shall meet the performance requirements specif led in 3.2.1 fol 1owiBg exposure to the following vibration levels at temperatures from -5OOF to 160 F. Level + 10% Fre
14、quency (Hz) - 5-11 0.4 inch displacement, peak to peak 12-37 2.5 g acceleration, peak 38-52 0.036 inch displacement, peak to peak 53-500 5.0 g acceleration, peak 3.2.2.5 Humdit - The SWS shall meet the performance requirements specified in 3.2.1 fo e owing exposure to atmosptere wit8 a relative humi
15、dity of 94 - + 4 percent over a temperature range of 68 F to 149 F. 3.2.2.6 Five foot dro - The SWS shall meet the performance requirements specified in Ming a drop of 5 feet onto a steel plate solidly supported by concrete. 3.2.2.7 Thermal shock - The.SWS shall meet specified pgrformance tequiremen
16、ts specified in 3.2.1 following thermal shock between -50 F and +16 F in a one minute period. 3.2.2.8 Low g acceleration - The SWS shall meet the performance requirements specified in 3.2.1 following exposure to a shock load of 750 + 50 gs for a period of less than one millisecond along the axial an
17、d radial axs of the SWS. The direction of the acceleration forces shall be as shown in Figure 1. 3.3 Design and construction 3.3.1 Production drawings - The SWS shall be fabricated and assembled in accordance with th e requirements specified on Drawing 9307240 and the applicable specifications refer
18、enced thereon. 3.3.2 Workmanship - All parts shall be fabricated and finished in a thorough workmanlike manner. Except as otherwise Specified, the parts shall be free of cracks, scratches, burrs, dents, gouges, surface defects or any surface discon- tinuities. The items shall be free from dirt, chip
19、s, grease, corrosion, and other foreign material. The cleaning method used shall not be injurious to any part nor shall the parts be contaminated by the cleaning agent. All required markings shall be neat and sharply defined. Exterior surface coatings shall be continuous. Scratches not exposina base
20、 metal and voids in the Dottinq compound Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-F-63229 13 9999906 03Y5923 2 5 MIL-F-63229 (AR) L a c, O) 5 2 e f .4 T -4- cn 3 O U c m OY E O L a .- a u 2 U C IQ c O .C c, m L W c n 4 .hewn except that th
21、e High and Low Temperature tests may be interchanged. The sample shall meet the requirements of Table III for acceptance of the lot. If the sample fails to meet these requirements the lot shall be rejected. 4.5 Test methods 4.5.1 Test conditions 4.5.1.1 Environmental conditions - Unless otherwise sp
22、ecified for the purpose of test, testing shall be conducted at the following conditions: Temper at Ure Relative Humidity 90 percent maximum B aromet r i c Pressure 72 - i- 18OF (22.2 - i- 10C) 28 to 32 inches of mercury 4.5.1.2 Test tolerances - All tolerances specified herein are absolute with no a
23、llowance made for measuring equipment inaccuracy. Measurements shall ensure that the values measured are within the tolerances or limits specified. 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-4.5.1.3 Inspection equipment - The inspection equipm
24、ents required to perform the examinations and tests prescribed herein are described in the “Paragraph Reference/Inspection Method“ column in the inspection tables included herein. The contractor shall submit for approval inspection equipment designs in accord- ance with the terms of the contract. Se
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILF632291979FUZEPIBDXM740M740SHOCKWAVESENSORFORXM740PIBD 引信 M740 冲击波 传感器 PDF

链接地址:http://www.mydoc123.com/p-444811.html