ARMY MIL-D-46256 B-1973 DETONATOR STAB M24 PARTS FOR AND LOADING ASSEMBLING AND PACKING《针刺雷管的M24零件的装载 组装和包装》.pdf
《ARMY MIL-D-46256 B-1973 DETONATOR STAB M24 PARTS FOR AND LOADING ASSEMBLING AND PACKING《针刺雷管的M24零件的装载 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-D-46256 B-1973 DETONATOR STAB M24 PARTS FOR AND LOADING ASSEMBLING AND PACKING《针刺雷管的M24零件的装载 组装和包装》.pdf(16页珍藏版)》请在麦多课文档分享上搜索。
1、- MIL-D-qb25bB 13 977770b 0310Ll51 T W %r rg /- - c _ - MIL-D-46256B (MU) 29 October i973 SUPERSEDING . 7 May i965 and 7 May 1965 MIL-D-46256A (MU) I I MIL-D-46255A (MU) i (see 6.5) MILITARY SPECIFICATION DETONATOR STAB 1424 PARTS FOR, AND LOADING, ASSEMBLING AND PACKING 1, SCOPE 1.1 This specificat
2、ion covers the parts for, loading assembling and packing for one type of stab detonator designated as Detonator, Stab M24. 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in- effect on date of invitation for bids or request for proposal, form a part of this specification to the exte
3、nt specified herein. SPECIFICATIONS MILITARY MIL-P-116 - Preservation, Method of MIL-A-2550 - Ammunition and Special Weapons; General Specification for STANDARDS MILITARY MIL-STD-105 MIL-STD-109 MIL-STD-650 - Explosives: Sampling, Inspection - Sampling Procedures and Tables for Inspection by Attribu
4、tes (ABC-STD-105) - Quality Assurance Terms and Definitions and Testing - MIL-STD-1168 - Lot Numbering of Ammunition FSC: i375 - . -. . THIS DOCUMENT CONTAINS Ib PAGES. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-D-qbZSbB 13 979770h 03LOq52
5、L m - - - MIL-D-46256B (MU) . i , - MIL-STD-1235 - Single and Multilevel Continuous -. Sampling Procedures and Tables for Inspection by Attributes DRAWINGS U.S. ARm ARMAMENTS COMMAND 8797763 - Detonator, Stab, M24, Assembly 8816367 - Holder, Firing Pin 8827829 - Bushing 8827934 - Ball 92OOOl2 - Pin,
6、 Firing 9200754 - Firing Assembly 9258182 - Box, Set Up, Packing, Ammunition, Inner 9258183 - Box, Set up, Packing, Ammunition, Outer 9258184 - Box, Packing, Ammunition for Small ! - 8855295 -Disc, Coined for Small Explosive Components for Small Explosive Components Explosive Compoents (Copies of sp
7、ecifications, standards and drawings required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer.) 3. REQUIREMENTS 3.1 Material.-Materials shall be in accordance with applicable drawings and specific
8、ations. requirements specified on Drawing (dwg.) 8797763, and with all requirements specified in applicable specifications . . 3.2 Detonator.-The detonator shall comply with all 3.3 Moisture content of lead azide.-The moisture content of the lead azide used in loading the detonator shall not exceed
9、0.50 percent. 3.4 content of the primer mixture used in loading the detonator shall not exceed 0.30 percent. first attempt under a maximum (max.) applied energy of 47.40 Inch ounces and shall cause perforation of a coined lead disc, to a diameter of not less than 3/16 inch. Moisture content of prime
10、r mixture.-The moisture 3.5 Functioning.-The detonator shall function on the 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-46256B (MU) 3.6 Workmanship.-All parts and assemblies shall be fabricated and loaded in a thorough, workmanlike manne
11、r. shall be free of burrs, sharp edges, cracks, dirt, grease, rust, corrosion products and other foreign matter. The cleaning method used shall not be injurious to any part nor shall the I parts be contaminated by the cleaning agent. Exterior surface coatings shall be continuous except fomr a few li
12、ght scratches not exposing base material. All required markings shall be neat and sharply defined. They 3.7 First Article Inspection.-This specification makes provisions for first article inspection. Requirements for the submission of first article samples by the contractor shall be as specified in
13、the contract. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for Inspection.-Unless otherwise specified in the contract or purchase order, the supplier is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract or order, t
14、he supplier may use his own or any other facilities suitable for the performance of the inspection re- quirements specified herein, unless disapproved by the Govern- . ment. the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and ser- vices c
15、onform to prescribed requirements. Reference shall be made to 14IL-STD-lOg to define terms used herein. The provi- sions of MIL-A-2550 shall apply. Submission of Product.-At the time each completed lot of items deliverable under the contract is submitted to the Government for acceptance, the contrac
16、tor shall supply the fol- owing information accompanied by a certificate which attests that the information provided is correct and applicable to the product Being submitted. The Government reserves the right to perform any of 4.1.1 a. A statement that the lot complies with all of the quality assura
17、nce provisions specified in this specification. b. Drawing and specification number and date, together with identification and date of changes thereto. c. A statement that all material purchased by the con- tractor meets requirements, when such material is controlled by Government or commercial spec
18、ifications referenced in any of the contractual documents, and that certificates of conformance are on file and available for review. d. Number of items in the lot. e. Date submitted. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I The certificat
19、e shall be signed by a responsible agent of the certifying organization. The Initial certificate submitted shall be substantiated by evidence of the agents authority to bind his principal. be required with subsequent certificates unless, during the course of the contract, this authority is .vested i
20、n another agent of the certifying .organhat ion. Substantiation of the agents authority will not 4.2 First Article Inspection 4.2.1 Submission.-Prior to the start of regular production the contractor shall submit a first article sample (see 6.1) to a Government approved facility as designated by the
21、 contracting officer for evaluation in accordance with the provisions of 4.2.2 and 4.2.3. The first article sample shall consist of 50 complete sets of parts and sub-assemblies (i.e. 50 each of every component and sub-assembly, which have been produced by the contractor or furnished by a supplier an
22、d which have been manufactured using the same production processes, procedures and equipment which will be used in fulfilling the contract, including packaging and packing shall be obtained from the same source of supply as will be used in regular production. Prior to submission, the contractor shal
23、l inspect the sample to the degree necessary to assure that it conforms to the requirements of the contract and submit a record of this inspection with the sample, including a certificate of conformance for materials. A sample containing know defects will not be submitted unless specifically authori
24、zed by the Contracting Officer. A first article sample, or portion thereof, as directed by the Contracting Officer, shall also be submitted whenever there is a lapse in production for a period in excess of 90 days or whenever a change occurs In manufacturing process, material used, drawing or spec-
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILD46256B1973DETONATORSTABM24PARTSFORANDLOADINGASSEMBLINGANDPACKING 针刺 雷管 M24 零件 装载 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-442398.html