ARMY MIL-C-51542-1988 CONVERTER FREQUENCY STATIC XM5 (FOR M56 XM59 OR XM62 FILTER UNITS)《静止变频器 XM5(用于M56、XM59或XM62滤波装置)》.pdf
《ARMY MIL-C-51542-1988 CONVERTER FREQUENCY STATIC XM5 (FOR M56 XM59 OR XM62 FILTER UNITS)《静止变频器 XM5(用于M56、XM59或XM62滤波装置)》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-51542-1988 CONVERTER FREQUENCY STATIC XM5 (FOR M56 XM59 OR XM62 FILTER UNITS)《静止变频器 XM5(用于M56、XM59或XM62滤波装置)》.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-C-5 1542(EA) 29 September 1988 SUPERSEDING (See section 6) MILITARY SPECIFICATION CONVERTER, FREQUENCY, STATIC, XM5 (FOR M56, XM59, OR X?A62 FILTER UNITS) This specification is approved for use within the U.S. Army Chemical Research, Development and Engineering Center, Depart- ment of the Army,
2、and is available for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers a static frequency converter from a 208 volt (V), 3-phase, 60 Hertz (Hz) power source. 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Standards and handbooks.
3、 The following standards and handbooks form a part of this specification to the extent specified herein. Unless otherwise THIS DOCUMENT CONTAINS PAGES. specified, the issues of these documents shall be those listed in the issue of the Department of Defense Index of Specifications and Standards (DODI
4、SS) and supplement thereto, cited in the solicitation. STANDARDS FEDERAL FED. TEST METHOD STD. NO. 123 - Marking for Shipment (Civil Agencies). MILITARY MIL-STD-105 - Sampling Procedures and Tables for Inspection by MIL-STD-781 - Reliability Testing for Engineering Development, Attributes. Qualifica
5、tion, and Production. : Beneficial comments (recommendations, additions, deletions) and any perti- : : nent data which may be of use in improving this document should be addressed: : to: Commander, U.S. Army Chemical Research, Development and Engineering : : Center, ATTN: SMCCR-SPT-S, Aberdeen Provi
6、ng Ground, MD 21010-5423 by using: : the self-addressed Standardization Document Improvement Proposal (DD Form : : 1426) appearing at the end of this document or by letter. AMSC NIA FSC 4240 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Provided by IHSNot for Resa
7、leNo reproduction or networking permitted without license from IHS-,-,-MIL-C-51542 42 U 7799706 0235q38 4 MIL-C-51542(EA) HANDBOOKS MILITARY MIL-HDBK-781 - Reliability Test Methods, Plans, and Environments for Engineering Development, Qualification, and Produc- tion. 2.1.2 Drawings. The following dr
8、awings form a part of this specification to the extent specified herein. Unless otherwise specified, the issues shall be those in efEect on the date of the solicitation. DRANINGS IFoSo ARMY ARMAMENT, MUNITIONS AND CHEMICAL COMMAND CHEMICAL RESEARCH, DEVELOPMENT AND ENGIWERING CENTER 5-19-6425 - Conv
9、erter, Frequency, Static. SPECIAL PACKAGING INSTRUCTIONS (SPI) P5-19-6425 - Converter, Frequency, Static. I (Copies of standards, handbooks, and drawings required by contractors in con- nection with specific acquisition functions should be obtained from the con- tracting activity or as directed by t
10、he contracting activity.) 2&2 Order of precedence. In the event of a conflict between the text of this specification and the references cited herein, the text of this specifi- cation shall take precedence. Nothing in this specification, however, shall supersede applicable laws and regulations unless
11、 a specific exemption has been chta ned . 3 mQUIREMENTS 3.1: Materials and components. 3.1,1 Materials. All materials cited on Drawing 5-19-6425 and on the subsid- iary drawings shall conform to the specifications listed thereon, and to the specific characteristics set forth on the drawings. 3,1e2 C
12、omponents. All-components of the converter shall conform to the specifications and drawings listed on Drawing 5-19-6425 and subsidiary draw- fngs. 3.2 Manufacture and assembly. The converter shall be manufactured and assembled in accordance with Drawing 5-19-6425. 2 Provided by IHSNot for ResaleNo r
13、eproduction or networking permitted without license from IHS-,-,-MIL-C-515qZ q2 m 9999906 0235L139 b 3.3 Performance. 3.3.1 Cycling burn-in. burn-in which shall consist of 3 hours continuous operation under no load con- ditions and 3 hours on-off operation in accordance with 4.4.4.1. The converter s
14、hall be subjected to a cycling 3.3.2 Operational characteristics. The converter shall conform to the sche- matic representations specified in Drawings 5-19-6492 and 5-19-6437 and shall perform as specified in 3.3.2.1 through 3.3.2.6 when the applicable voltages, voltage phases, and load-are applied
15、to the specific junctions on the static frequency converter. 3.3.2.1 DC voltage. The test point DC voltages from test points 1, 2, and 3 to test point 4 shall be between 10.75 and 13.25 when tested as specified in 4.4.4.2(b) 3.3.2.2 AC voltage. The test point AC voltage between test points 5 and 6 -
16、 shall be greater than 2 volts when tested in accordance with 4.4.4.2(C). 3.3.2.3 Phasing. The phasing of the output shall be phase 1 on pin A, phase 2 on pin B and phase 3 on pin C of connector 58, when tested in accordance with 4.4.4.2(d). 3.3.2.4 Output voltage (line to line). The output line to
17、line voltage with load applied (see 6.3) shall be 208 + 15 Volts, root-mean-square (VRMS), when tested in accordance with 4.4.4.2(e)y 3.3.2.5 Output voltage (line to neutral). The output line to neutral volt- age with load applied (see 6.3) shall be 120 - + 10 VRMS when tested in actor- dance with 4
18、.4.4.2(f). 33.2.6 Output frequency. The output frequency of each-phase shall be 400 - + 10 Hz when tested in accordance with 4.4.4.2(g). 3.4. Reliability. 3.4.1 Preproduction reliability qualification. Prior to the start of regu- lar production, the preproduction sample converters shall demonstrate
19、accept- able reliability when tested in the configuration specified in 4.4.4.1 in accor- dance with task 302 of MIL-STD-781, using test plan IV of MIL-HDBK-781 with minimum test mean time between failures (01) equal to 934 hours. able failure shall be defined as any deviation from the requirements s
20、pecified in 3.3.2.1 through 3.3.2.6. An account- 3.4.2 Production reliability. The production reliability acceptance sample for each lot shall demonstrate acceptable reliability when tested in the con- figuration specified in 4.4.4.1 in accordance with task 302 of MIL-STD-781, using test plan IV of
21、MIL-HDBK-781 with a minimum test mean-time-between- failures (el), equal to 934 hours. any deviation from the requirements specified in 3.3.2.1 through 3.3.2.6. An accountable failure shall be defined as 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-
22、,-,-MIL-C-51542 42 799470b 0235440 2 m 3.5 Workmanship. The converter shall be free from chipped or bent metal sec- tions, and foreign matter (dirt, oil, or viscous materials). 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise specified in the con- tract or purchase
23、 order, the contractor is responsible for the performance of all inspection requirements as specified herein. in the contract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements speci- fied herein, unless disapproved b
24、y the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. Except as otherwise specified 4.1.1 Responsibility for compliance. All
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC515421988CONVERTERFREQUENCYSTATICXM5FORM56XM59ORXM62FILTERUNITS 静止 变频器 XM5 用于 M56 XM59 XM62 滤波

链接地址:http://www.mydoc123.com/p-441830.html