ARMY MIL-C-50705-1971 CHEST 10548700《10548700 箱子》.pdf
《ARMY MIL-C-50705-1971 CHEST 10548700《10548700 箱子》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-50705-1971 CHEST 10548700《10548700 箱子》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、I MIL-C-50705 12 7777906 0330124 7 U PII1,ITARY SPECIFICATION CHEST: 10548700 ii 1. SCOPE 1.1 quality a Board M18 This specification covers the performance requirements and ssurance provisions for one type of reusable chest for Plotting -/ .+ 2. APPLICABLE DOCUMENTS 2.1 The following documents, of t
2、he issue in effect on date of invitation for bids or request for proposal, form a part of this specifi- cation to the extent specified herein. S PEC IF ICATIONS Mi 1 i tar y MIL- F- 13 9 2 6 FlIL-P-14232 PIIL-T-2 1200 HIL - I - 45 6 O 7 STANDARDS Mi 1 i tary MIL-STD-105 IIIL-STD- 109 MIL-STD- 139 bl
3、IL-STD-810 Fire Control Materiel: General Specifi- cation Governing the Manufacture and Inspect ion of Parts, Equipment and Tools for Army Materiel, Packaging and Packing of Test Equipment for Use with Electronic and Fire Control Systems, General Specification for Inspection Equipment, Acquisition,
4、Disposition and Maintenance of Sampling Procedures and Tables for Quality Assurance Terms and Definitions Marking for Shipment and Storage Environmental Test Methods Inspection by Attributes DRAWIMGS U.S. Army, Frankford Arsenal F105G8700 Chest , 10548700 ,- . d THIS DOCUMENT CONTAINS PAGES, Provide
5、d by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-(3-50705 (MJ) I (Copies of spccifictions, standards aiid drawings required by the sup- pliers n conncctioii with specific pro-urciiicnt func tians shoii Id ha obtainad roiii tlic! procuring activity or as
6、dircctcd by clid contracting officer. ) 3. REQUIREMENTS 3.1 Materials.- The materials shall be in accordance with draw- ings, material specifications and general specifications forming a part of this specification. 3.2 Fabrication.- The chest shall be manufactured in accordance with Drawing F1054870
7、0 and all drawings pertaining thereto. 3.3 General specification.- The contractor shall be responsible for adherence to the following requirements of MIL-F-13926: (a) Dimensions and tolerances (b) Inorganic protective surface finishes (c) Part identification and marking (d) Workmanship 3.4 Environme
8、ntal. 3.4.1 Storage.- The latched chest assenbly shall show no evidence of distoration, cracks or delamination after having been thermally stabilized at -70F and 160F. 3.4.2 Standard ambient temperature.- Subsequent to meeting the requirement of 3.4.1, the chest shall meet all the requirements of 3.
9、4.4, 3.4.5 and 3.5 at a standard ambient temperature between 60F to 90F. 3.4.3 Extreme operating temperature.- The chest shall meet all the requirements of 3.5.1 and 3.5.2 whilethermally stabilized at -40F and -t15OoF, 3.4.4 Impact resistance.- There shall be no evidence of loose or damaged parts to
10、 either the chest or plotting board as a result of the - chest being dropped on each of the 8 corners and 6 faces from a height of 12 inches IC 2 inches onto a 2 inch k 1/2 inch thick concrete surf.ace. The chest assembly shall not become unlatched as a result of the impacts and shall meet the requi
11、rements of 3.4.5 and 3.5. 3.4.5 Watertightness.- The latched chest assembly with the plotting board installed shall show no evidence of water penetration after being - submerged in 16 f 2 inches of water for 5 5 1 minute. The functioning portion of the breather valves shall be.covered during the wat
12、ertightness test. 3.5 Per formance. 3.5.1 FaSterners.- All catches, hinges, straps, etc. shall function without interference. The externabcatches, when engaged, shall secure I 2 , 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-. . - - . - - . . -
13、. - . . . . . . . . _. MIL-C-50705 12 W 7977906 0330326 O W XIL-C-50705 (W) the cover to the body and shi11 displace a uniform compression on the gasketed seal, 3.5.2 Handles,- All handles shall function 1;ithout interference and shall support the latched chest assembly with the Ml8 Plotting Board i
14、nstalled. There shall be no evidence of damage to, or separation of the handle assembly, and the supported load shall cause no damage to the cover or body in the vicinity of the handle attachments or elsewhere. 3.5.3 Interface requirements.- The chest shall interface, support, and retain the M18 Plo
15、tting Board. There shall be no free movement of any of the components after the plotting board components are properly arranged and secured within the chest and the cover is closed and latched to the body. 4, QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection.- Unless otherwise specified
16、 in the contract or purchase order, the supplier is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the supplier may utilize his own facilities or any other facili- ties suitable for the performance of the inspection requirements spe
17、cified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.1.1 General provisions.- The compo
18、nent and subassembly inspection requirements of MIL-F-13926 form a part of the quality assurance provisions of this specification. Definitions of inspection terms shall be as listed in MIL-STD-109. 4.2 First article (initial production) approval.- The requirement for first article approval and respo
19、nsibility (Government or contractor) for first article testing shall be as specified in the contract. The sample for first article approval tests shall consist of 3 chest assemblies manufactured in the same manner, using the same materials, equipment, processes, and procedures as used in regular pro
20、duction. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as used in regular production. 4.2.1 Government testing.- When the Government is responsible for conducting first article approval tests, the contractor, prior to sub- mitting the samp
21、le to the Governmerit, shall inspect the sample to insure that it conforms to all the requirtsments of the contract and submit a record of this inspection with the sample, including certificates of con- formance for materials. J Provided by IHSNot for ResaleNo reproduction or networking permitted wi
22、thout license from IHS-,-,-MIL-C-50705 (MU) . 4.2.2 Coiitrnctor tcstin5;. -, Wlicn tlic coiitractor is rcspoiisihle Lor conducting Eirst article approval tcsts, tlic srimplc sliall bc iiispectcct by the contractor for all the requircments of- tlic contract. . Th saiiple and a record of this inspecti
23、on, incI.uding certificates of conformance for materials shall be submitted t the Government for approval. The Government reserves the right to witness the contractors inspection. 4 . 3 nspec tion provis ions. 4.3.1 Submission of product.- Unless otherwise specified by the contracting officer, inspe
24、ction lot size, lot formation and presentation of lots shall be in accordance with “Submission of Product“ provisions Of MIL-STD-105 4.3.2 Examination and tests. 4.3.2.1 Components and subassemblies.- All components and sub- assemblies shall be inspected.in accordance with the inspection provisions
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC507051971CHEST1054870010548700 箱子 PDF

链接地址:http://www.mydoc123.com/p-441734.html