ARMY MIL-A-51372-1973 ADAPTER BOMB CLUSTER 750 POUND M30E2《M30E2型750磅集束炸弹的转接器》.pdf
《ARMY MIL-A-51372-1973 ADAPTER BOMB CLUSTER 750 POUND M30E2《M30E2型750磅集束炸弹的转接器》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-A-51372-1973 ADAPTER BOMB CLUSTER 750 POUND M30E2《M30E2型750磅集束炸弹的转接器》.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、flIL-A-5I1372 13 m 7777706 0333773 I m b. _- I MIL-A-5137 2( I , MILITARY SPECIFICATION ADAPTER, BOMB CLUSTER, 750-P0vrrr, M30E2 1. SCOPE 1.1 “his specification covers one type of adapter. 2. APPLICABLE DOCWENTS 2.1 The following documents of the issue in effect on date of invita- tion for bids or r
2、equest for proposal, form a part of this specification to the extent specified herein : MILITARY MILSTD-105 - Sampling Procedures and Tables for Inspection by ML-STD-129 - Marking for Shipment and Storage. MIL-STD-1168 - Lot Numbering of Ammunition. fywB235 Attributes. i a;. ; : :;,;-: ;. 1 !.! i; +
3、; i; : I . : b-:;.: * , . ! 0. ;,:&;:; :. .- .:. . n., , I.,. 1 - . I: J , DRAWINGS A- , . QsiZms?%5B.f. :;. ;,. I. .- 3.1 Material and components. 3.1.1 Material. II_- All materials cited on Drawing E14-23-4080 or on the subsidiary drawings shall conform to the specifications listed thereon, or to
4、the specific characteristics set forth on the drawings, Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-A-51372 13 9 777770b 0333774 3 W MIL-A-51372 (MU) - - -I . . .I 3.1.2 Components. All components of the adapter shall conform to the specifica
5、tions and drawings listed on Drawing E14-23-4080 and subsidiary drawings. ?.l. It .,- I- *_ I :!:;., .! %;, .,: ,.ii. , r. . . -3 - 3.2 Assembl . The adapter shall be assembled as specified on Drawing Elk-23- Ty 080 3.3 Leakage. The adapter shall not leak when tested as specified in 4.4.4.1. 3.4 Gas
6、ket joint. The gasket joint shall not show evidence of sep- . aration when tested as specified in 4.4.4.2. 3.5 Preproduction. Prior to the start of regular production, a pre- production sample of adapters shall be produced in accordance with this specification for examination and tests ( see 4.3) .
7、3.6 Workmanship. The adapter shall be free from foreign matter (oil, grease or dirt) and damage such as dents, cracks or deformation which could affect its intended use. 4. QUALITY ASSURANCE PROVISIONS 4.1.1 Responsibility for inspection. 4.1.1 Supplier s responsibility. Unless otherwise specified i
8、n the contract or purchase order, the supplier is responsible for the perform- ance of all inspection requirements as specified herein. wise specified in the contract or order, the supplier may use his own or any other facilities suitable for the performance ofthe inspection re- quirements specified
9、 herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. Except as other- 4.1.2 Objective evidence.
10、 The supplier shall provide objective evidence acceptable to the contracting officer that the requirements of 3.1 and section 5 for which specific inspection has not been provided in this specification have been satisfied. 4.2 Classification of inspection. The inspection requirements spec- ified her
11、ein are classified as follows: (a) Preproduction inspection (see 4.3). (b) Quality conformance inspection ( see 4.4) r- i, - I , :. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-A-51372 13 m 7777906 0333775 5 m - - L MIL-A-51372( MU) 4.3 Prep
12、roduction inspection. 4.3.1 Sample. A preproduction sample of 10 adapters shall be manufactured using the same methods, materials, equipment and pro- cesses as will be used during regular production. 4.3.2 Inspection procedure 4.3.2.1 For examination and nondestructive test (4.4.4.2). Each adapter s
13、hall be examined and tested in accordance with the classifi- cation of defects (4.4.3.3). The AQLs do not apply. 4.3.2.2 For nondestructive test (4.4.4.1). Each adapter shall be tested as specified in 4.4.4.1. 4.3.3 Acceptance/rejection criteria. The preproduction sample shall comply with the examin
14、ations and tests specified in 4.3.2 to be accept- able. The acceptance number is zero. approval from the contracting officer prior to proceeding with regular product ion. The supplier shall obtain written 4.4 Quality conformance inspect ion. 4.4.1 Lotting. Each lot shall be identified and controlled
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILA513721973ADAPTERBOMBCLUSTER750POUNDM30E2M30E2 750 集束炸弹 转接 PDF

链接地址:http://www.mydoc123.com/p-440701.html