ARMY MIL-B-51373-1973 BOMB CLUSTER INCENDIARY TH3 750 POUND M36E2 (WITHOUT FUZE FIN& WIRE)《M36E2型750 磅重TH3燃烧弹集束炸弹(无引信 钢丝肋)》.pdf
《ARMY MIL-B-51373-1973 BOMB CLUSTER INCENDIARY TH3 750 POUND M36E2 (WITHOUT FUZE FIN& WIRE)《M36E2型750 磅重TH3燃烧弹集束炸弹(无引信 钢丝肋)》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-B-51373-1973 BOMB CLUSTER INCENDIARY TH3 750 POUND M36E2 (WITHOUT FUZE FIN& WIRE)《M36E2型750 磅重TH3燃烧弹集束炸弹(无引信 钢丝肋)》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、. . , - . . .I I. a. _- 2%- .*A . . . . . ,-, . MIL-B-51373 (MU) 13 July 1973 Isee section 6) MILITARY SPECIFICATION BOMB CLUSTER, INCENDWY, TH3, 750 - POUND, M36E2 (W/O FUZE, FIN AND WIRE) 1. SCOPE 1.1 This specification covers one type of side opening cluster for use in grouping incendiary bombs f
2、or release from aircraft. 2. APPLICABLE DOCUMENTS 2.1 The following documents, of the issue in effect on date of invita- tion for bids or request for proposal, form a part of this specification to the extent specified herein : STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables for Inspe
3、ction MILSTD-1168 - Lot Numbering of Ammunition. by Attributes, DRAWINGS US ARMY MUNITIONS COMMAND EDGEWOOD ARSENAL E14-23-4081 - Bomb Cluster , Incendiary, TH3, 750-Lb. , 362 (w/o Fuze, Fin and Wire). E14-23-4083 - Bomb Cluster, Incendiary, TH3, 750 Lb. , M36E2. (Copies of specifications, standards
4、, drawings, and publications required by contractors in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer ,) 3. REQUIRENEWS 3.1 Materials and components. All materials and components cited on Drawing Elk-23-4081 or
5、 on the subsidiary drawings shall conform to the Licensed by Information Handling ServicesMIL-B-SL373 13 m 7797706 0333780 9 W f specifications listed thereon or to the specific characteristics set forth .on. the drawings. 3.2 Assembl . on Drawing -+ El -23-4081, except that each bomb shall have its
6、 safety clamp, if any, removed. The cluster shall be assembled (see 6.2) as specified 3.3 Leakage. The cluster shall not leak air when subjected to a minimum internal air pressure of 10 inches of mercury gage when tested in accordance with 4.4.4.1. 3.4 Functioninq. The cluster shall function so that
7、 95 percent of the bombs shall function upon ground impact when tested and computed in accordance with 4.4 , 4.2. 3.5 Preproduction. - Prior to the start of regular production, a pre- production sample shall be produced in accordance with this specification for examination and test (see 4.3). 3.6 Wo
8、rkmanship. The cluster shall be free frm foreign matter (oil and grease) and damage which could affect its intended use. 4, QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. 4.1.1 Suppliers responsibility. Unless otherwise specified in the contract or purchase order, the supplier is re
9、sponsible for the perform- ance of all inspection requirements as specified herein, wise specified in the contract or order, the supplier may use his own or any other facilities suitable for the performance of the inspection re- quirements specified herein, unless disapproved by the Government. The
10、Government reserves the right to perform any of the inspection set forht in the specificaiton where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.1.2 Governments res onsibility. The Government will perform test specified in 4.3.2.3 and f.
11、4.4.2. Samples shall be forwarded to the - Government test facility designated by the contracting officer, Except as other- 4.1.3 Objective evidence. The supplier shall provide objective evidence acceptable to the contracting officer that the requirements of 3.1 and section 5 for which specific insp
12、ection has not been provided in this specification have been satisfied, 2 Licensed by Information Handling ServicesMIL-B-53373 33 7777706 0333983 O 9 MIL-B-51373 4.2 Classification of inspections. The inspection requirements specified herein are classified as follows: (a) Preproduction inspection (s
13、ee 4.3) (b) Quality conformance inspection (see 4.4) 4.3 Preproduction inspection. 4.3.1 Sample. A preproduction sample of 10 clusters shall be manufac- tured using the same methods, materials, equipment and processes as Will be used in regular production. 4.3.2 Inspection procedure. 4.3.2.1 For exa
14、mination and nondestructive test. Each cluster shall be examined in accordance with the classification of defects, the AQLs do not apply. Cluster leakage test shall be 100 percent inspection. 4.3.2.2 For destructive test (functioning), Each cluster shall be tested in accordance with 4.3.2.4. 4.3.2.3
15、 Functioning test (see 6.2)_. The cluster assembled in accordance with Drawing Ei4-23-4083 and with the tail fuzes set to function 16 second6 after release from the airplane, shall be dropped from an altitude of 7,000 + 500 feet traveling at 600 knots indicated airspeed m8xhum. The fuzes shall- func
16、tion, ignite the detonating cord, and burst the cluster emitting all of the bombs. fuzing or installation of the cluster, that cluster shall be disregarded and the results computed on the basis of the nine remaining clusters. of percent functioning shall be recorded in the following ranges: 4.4.4.2
17、for formula to be used in determining percent functioning,) Should one of the clusters fail to function due to improper .: .: ;i “ 2 Data (See (a) 98.1 to LOO (b) 97.1 to 98.0 (CI 95.0 to 97.0 4.3.3 Acceptance/rejection criteria. The preproduction sample (see 6.3) shall meet the examinations and tes
18、ts specified herein to be accept- able. The supplier shall obtain written approval from the contracting officer prior to proceeding-with regular production. . 4.4 Quality conformance inspection. J 4.4.1 Lotting. Each lot shall be identified and controlled in accordance with MIL-STD-1168, and shall c
19、onsist of the clusters produced during one week s production. c 3 i -:, Licensed by Information Handling ServicesNIL-B-51373 13 W 797770b 0333782 2 W 11 4.4.2 Sampling. 4.4.2.1 For examination and nondestructive, test. Sampling shall be con- sucted in accordance with MIL-STD-105. 4.4.2.2 For destruc
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILB513731973BOMBCLUSTERINCENDIARYTH3750POUNDM36E2WITHOUTFUZEFINWIREM36E2 750 TH3 燃烧弹 集束炸弹 引信 钢丝

链接地址:http://www.mydoc123.com/p-440962.html