ANSI UL 203A-2015 UL Standard for Safety Sway Brace Devices for Sprinkler System Piping (First Edition Reprint with revisions through and including June 27 2016).pdf
《ANSI UL 203A-2015 UL Standard for Safety Sway Brace Devices for Sprinkler System Piping (First Edition Reprint with revisions through and including June 27 2016).pdf》由会员分享,可在线阅读,更多相关《ANSI UL 203A-2015 UL Standard for Safety Sway Brace Devices for Sprinkler System Piping (First Edition Reprint with revisions through and including June 27 2016).pdf(33页珍藏版)》请在麦多课文档分享上搜索。
1、UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL UL 203A Sway Brace Devices for Sprinkler System Piping STANDARD FOR SAFETYUL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM ULUL COPYRIGHTE
2、D MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL UL Standard for Safety for Sway Brace Devices for Sprinkler System Piping, UL 203A First Edition, Dated December 18, 2015 Summary of Topics This revision to ANSI/UL 203A is being issued as an editorial upda
3、te, which includes a correction to the table referenced in ASTM A1023/A1023M, and a correction in the column labeled Pipe Size , Table 9.2. The corrected requirements are substantially in accordance with Proposal(s) on this subject dated April 10, 2015 and September 25, 2015. Text that has been chan
4、ged in any manner or impacted by ULs electronic publishing system is marked with a vertical line in the margin. All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form by any means, electronic, mechanical photocopying, recording, o
5、r otherwise without prior permission of UL. UL provides this Standard as is without warranty of any kind, either expressed or implied, including but not limited to, the implied warranties of merchantability or tness for any purpose. In no event will UL be liable for any special, incidental, conseque
6、ntial, indirect or similar damages, including loss of prots, lost savings, loss of data, or any other damages arising out of the use of or the inability to use this Standard, even if UL or an authorized UL representative has been advised of the possibility of such damage. In no event shall ULs liabi
7、lity for any damage ever exceed the price paid for this Standard, regardless of the form of the claim. Users of the electronic versions of ULs Standards for Safety agree to defend, indemnify, and hold UL harmless from and against any loss, expense, liability, damage, claim, or judgment (including re
8、asonable attorneys fees) resulting from any error or deviation introduced while purchaser is storing an electronic Standard on the purchasers computer system. JUNE 27, 2016 UL 203A tr1UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL JUNE 27,
9、2016 UL 203A tr2 No Text on This PageUL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL DECEMBER 18, 2015 (Title Page Reprinted: June 27, 2016) 1 UL 203A Standard for Sway Brace Devices for Sprinkler System Piping Prior to the rst edition, the
10、requirements for the products covered by this standard were included in the Outline of Investigation for Sway Brace Devices for Sprinkler System Piping, UL 203A. First Edition December 18, 2015 This ANSI/UL Standard for Safety consists of the First Edition including revisions through June 27, 2016.
11、The most recent designation of ANSI/UL 203A as an American National Standard (ANSI) occurred on December 18, 2015. ANSI approval for a standard does not include the Cover Page, Transmittal Pages and Title Page. Comments or proposals for revisions on any part of the Standard may be submitted to UL at
12、 any time. Proposals should be submitted via a Proposal Request in ULs On-Line Collaborative Standards Development System (CSDS) at http:/. ULs Standards for Safety are copyrighted by UL. Neither a printed nor electronic copy of a Standard should be altered in any way. All of ULs Standards and all c
13、opyrights, ownerships, and rights regarding those Standards shall remain the sole and exclusive property of UL. COPYRIGHT 2016 UNDERWRITERS LABORATORIES INC. ANSI/UL 203A-2015UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL DECEMBER 18, 2015
14、SWAY BRACE DEVICES FOR SPRINKLER SYSTEM PIPING - UL 203A 2 No Text on This PageUL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL CONTENTS INTRODUCTION 1 Scope .4 2 Components 4 3 Units of Measurement .4 4 Undated References 4 5 Glossary .5 CON
15、STRUCTION 6 General 7 7 Materials .8 8 Protective Coatings .9 PERFORMANCE 9 Load Test 9 10 Zinc Coating Thickness Test for Cable 17 11 Metallic Coating Thickness Tests .17 12 Restraint Device Load Test 19 13 Assembly Test of Sway Brace Fitting 19 14 Torque Test of Shear Bolts 20 MARKINGS 15 General
16、20 INSTALLATION INSTRUCTIONS 16 General 21 Appendix A A1 Examples of Sway Brace Devices A1 DECEMBER 18, 2015 SWAY BRACE DEVICES FOR SPRINKLER SYSTEM PIPING - UL 203A 3UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL INTRODUCTION 1 Scope 1.1 T
17、hese requirements cover sway brace devices intended to protect re protection system piping in locations subject to earthquakes. These devices are intended for installation in accordance with the Standard for the Installation of Sprinkler Systems, NFPA 13. 1.2 These requirements cover restraint devic
18、es intended to restrict movement of re protection piping. 2 Components 2.1 Except as indicated in 2.2, a component of a product covered by this Standard shall comply with the requirements for that component. 2.2 A component is not required to comply with a specic requirement that: a) Involves a feat
19、ure or characteristic not required in the application of the component in the product covered by this standard, or b) Is superseded by a requirement in this standard. 2.3 A component shall be used in accordance with its rating established for the intended conditions of use. 2.4 Specic components are
20、 incomplete in construction features or restricted in performance capabilities. Such components are intended for use only under limited conditions, such as certain temperatures not exceeding specied limits, and shall be used only under those specic conditions. 3 Units of Measurement 3.1 Values state
21、d without parentheses are the requirement. Values in parentheses are explanatory or approximate information. 4 Undated References 4.1 Any undated reference to a code or standard appearing in the requirements of this standard shall be interpreted as referring to the latest edition of that code or sta
22、ndard. DECEMBER 18, 2015 SWAY BRACE DEVICES FOR SPRINKLER SYSTEM PIPING - UL 203A 4UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL 5 Glossary 5.1 For the purposes of this Standard, the following denitions apply. 5.2 BRACE MEMBER Structural c
23、omponent of a sway brace. 5.3 BRACE MEMBER NON-RIGID Standard Specication for Stranded Carbon Steel Wire Ropes for General Purposes, ASTM A1023/A1023M, Table 7, Galvanized Steel Cable, as referenced by Standard Guidelines for the Structural Applications of Steel Cables for Buildings, ASCE-19. 5.4 FA
24、STENER ADAPTER Device to facilitate the use of additional fasteners for mounting a sway brace (See Figure A.4). 5.5 LOAD RATING, NONRIGID ASSEMBLY The published load rating is less than or equal to the manufacturers specied minimum breaking strength of the cable divided by 1.5. 5.6 LOAD RATING, RIGI
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ANSIUL203A2015ULSTANDARDFORSAFETYSWAYBRACEDEVICESFORSPRINKLERSYSTEMPIPINGFIRSTEDITIONREPRINTWITHREVISIONSTHROUGHANDINCLUDINGJUNE272016PDF

链接地址:http://www.mydoc123.com/p-439030.html