ANSI ISA 77.13.01-1999 Fossil Fuel Power Plant Steam Turbine Bypass System《火电厂汽轮机旁路系统》.pdf
《ANSI ISA 77.13.01-1999 Fossil Fuel Power Plant Steam Turbine Bypass System《火电厂汽轮机旁路系统》.pdf》由会员分享,可在线阅读,更多相关《ANSI ISA 77.13.01-1999 Fossil Fuel Power Plant Steam Turbine Bypass System《火电厂汽轮机旁路系统》.pdf(42页珍藏版)》请在麦多课文档分享上搜索。
1、 ANSI/ISA77.13.011999 (R2008) Fossil Fuel Power Plant Steam Turbine Bypass System Reaffirmed 30 December 2008 Copyright 2008 ISA. All rights reserved. ANSI/ISA77.13.011999 (R2008) Fossil Fuel Power Plant Steam Turbine Bypass System ISBN: 978-1-934394-74-8 Copyright 2008 by ISA. All rights reserved.
2、Not for resale. Printed in the United States of America. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise), without the prior written permission of the Publisher.- 3
3、 - ANSI/ISA77.13.011999 (R2008) Copyright 2008 ISA. All rights reserved. Preface This preface, as well as all footnotes and annexes, is included for information purposes and is not part of ANSI/ISA77.13.011999 (R2008). This document has been prepared as part of the service of ISA towards a goal of u
4、niformity in the field of instrumentation. To be of real value, this document should not be static but should be subject to periodic review. Toward this end, the Society welcomes all comments and criticisms and asks that they be addressed to the Secretary, Standards and Practices Board; ISA; 67 Alex
5、ander Drive; P. O. Box 12277; Research Triangle Park, NC 27709; Telephone (919) 549-8411; Fax (919) 549-8288; E-mail: standardsisa.org. The ISA Standards and Practices Department is aware of the growing need for attention to the metric system of units in general, and the International System of Unit
6、s (SI) in particular, in the preparation of instrumentation standards. The Department is further aware of the benefits to USA users of ISA standards of incorporating suitable references to the SI (and the metric system) in their business and professional dealings with other countries. Toward this en
7、d, this Department will endeavor to introduce SI-acceptable metric units in all new and revised standards, recommended practices, and technical reports to the greatest extent possible. Standard for Use of the International System of Units (SI): The Modern Metric System, published by the American Soc
8、iety for Testing the firebox area, including burners and dampers; the convection area, consisting of any superheater, reheater, and/or economizer sections as well as drums, generating tubes, and headers. 3.4 condenser backpressure elements: a multiple breakdown diffuser, normally installed in the st
9、eam condenser neck, used to generate a positive back pressure upstream of the condenser vacuum and to reduce the kinematic energy of steam from an external source other than the turbine exhaust. 3.5 controller: any automatic, semi-automatic, or manual device or system of devices used to regulate the
10、 boiler turbine, or any other equipment within defined parameters. If automatic, the device or system responds to variations in temperature, pressure, water level, flow, or other control variables. 3.6 differential producer: a measuring element that is inserted in a process flow path and used to cre
11、ate a pressure drop that is proportional to the square of the volumetric flow rate. ANSI/ISA77.13.011999 (R2008) - 10 - Copyright 2008 ISA. All rights reserved. 3.7 fail safe: the capability to go to a predetermined safe state in the event of a specific malfunction. 3.8 fault tolerant: built-in capa
12、bility of a system to provide continued, correct execution of its assigned function in the presence of a hardware and/or software fault. 3.9 integral windup: the saturation of the integral controller output, in the presence of a continuous error, which may cause unacceptable response in returning th
13、e process to its setpoint within acceptable limits of time and overshoot. 3.10 load: a device that receives power or that power which is delivered to such a device, as in the rate of output, lb/hr (kg/s) of steam or megawatts (kilowatts) of electrical generations. 3.11 logic system: decision-making
14、logic equipment with its associated power supplies, I/O hardware, and sensing devices. 3.12 mode (submode): a particular operating condition of a control system, such as manual, automatic, remote, or coordinated. 3.13 redundant (redundancy): the duplication or repetition of elements in electrical or
15、 mechanical equipment to provide alternative functional channels in case of failure of one channel. 3.14 severe duty valve: a mission-critical valve, typically seeing high-pressure drop service, which may see cavitating or flashing fluids, or if not properly designed, may see early trim erosion, vib
16、ration, or excess noise. 3.15 shall, should, and may: the word “SHALL” is to be understood as a REQUIREMENT; the word “SHOULD” as a RECOMMENDATION; the word “MAY” as a PERMISSIVE, neither mandatory nor recommended. 3.16 steam quality: the ratio of the vapors mass to the mixtures mass. 3.17 turbine:
17、a machine that converts energy from a moving fluid into rotating mechanical energy that drives a load. In a power plant, a turbine converts energy in the steam into mechanical energy to drive an electric generator (the mechanical load). 3.18 turbine governor valves: the primary control valves used t
18、o regulate the flow of steam through the turbine during normal operation. 3.19 turn-down ratio: the ratio from maximum operating to minimum operating conditions, providing a controllable or measurable span. The device must perform over this range. - 11 - ANSI/ISA77.13.011999 (R2008) Copyright 2008 I
19、SA. All rights reserved. 4 Bypass systems 4.1 General requirements The steam turbine bypass system requirements are defined for those components and logic systems necessary to handle steam to and around the turbine. The design of systems to prevent water damage to steam turbines is covered by the Am
20、erican Society of Mechanical Engineers (ASME) standard TDP-1. The steam should be of a minimum quality of 92 percent to avoid impingement and corrosion. Figures E.1 and E.2 show a typical turbine steam bypass system to assist in explaining the design requirements of this clause. Other figures show s
21、pecific areas to help clarify the text materials. This standard will cover the following functions: a) Matching with an acceptable difference the metal to steam temperatures before steam is admitted to the turbine b) Handling the difference between the generated and consumed steam flows during trans
22、ient conditions 4.1.1 High-pressure (HP) bypass system The HP bypass system shall fulfill the following requirements: a) Control the pressure of the steam bypassing the HP turbine b) Control the pressure of the main steam from the boiler c) Control the flow and temperature of steam through the cold
23、reheat line to cool the boiler reheater tubing d) Control the flow of steam through the main steam line to cool the boiler final superheater in case of sliding pressure operation e) Prevent lifting of main steam and hot reheat safety valves during transient operations 4.1.2 Intermediate-pressure (IP
24、) and low-pressure (LP) bypass system The IP and LP bypass system shall fulfill the following requirements: a) Control the pressure of the steam bypassing the IP and LP turbines b) Control the pressure and temperature of the hot reheat steam from the boiler c) Prevent the lifting of hot reheat safet
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ANSIISA7713011999FOSSILFUELPOWERPLANTSTEAMTURBINEBYPASSSYSTEM 火电厂 汽轮机 旁路 系统 PDF

链接地址:http://www.mydoc123.com/p-436978.html