AIR FORCE MIL-T-8429 B-1983 TESTER LEAKAGE DEMAND OXYGEN REGULATOR TYPE MH-2《MH-2型要求氧气调节器泄露测试仪》.pdf
《AIR FORCE MIL-T-8429 B-1983 TESTER LEAKAGE DEMAND OXYGEN REGULATOR TYPE MH-2《MH-2型要求氧气调节器泄露测试仪》.pdf》由会员分享,可在线阅读,更多相关《AIR FORCE MIL-T-8429 B-1983 TESTER LEAKAGE DEMAND OXYGEN REGULATOR TYPE MH-2《MH-2型要求氧气调节器泄露测试仪》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、Y. - MIL-T-8427B 47 7797906 02q3802 b =. - - MIL-T-8429B 11 JUL 83 SUPERSEDING MIL-T-8429A(USAF) 29 May 1957 - .- leakage; demand oxygen regulator, type MH-2 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-T-LI29B 97 7777706 OZi3807 5 W MIL-T-
2、8429B FIGURE 2. Tester, leakage, demand oxygen regulator, type MH-2 (dimensions in inches) Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NIL-T-i-129B 47 W 997970b 02i-13808 7 W MIL-T-8429B 3.7.5 Adapters. The adapters for connecting the tester to o
3、xygen regula- tors shall be as shown in Figure 1. directly to the tester to regulator tubing and the second adapter shall be secured to the end of the tubing by means of a small, flexible chain conform- ing to RR-C-271, type II, class 6. The stopper shall be a commercial No. 2 rubber stopper The oth
4、er adapter shall conform to-Figure 3, The stopper type shall be connected 3.7.6 Case. The case shall be fabricated from 0.062 inch aluminum con- The top shall be hinged to the body of A handle for carrying the case forming to QQ-A-250/8F, temper H34. the cae. cover closed when the tester is not in u
5、se. shall be provided on the top of the case. The cover shall be provided with a suitable latch for holding the 3.7.6.1 Finish. The case shall be given one coat of zinc-chromate primer, conforming to TT-P-1757 prior to painting. the case shall be painted with two coats of lacquer conforming to TT-L-
6、32. The color of the lacquer shall conform to No. 17038 of FED-STD-595. After the primer is thoroughly dry, 3.8 Weight. The weight of the complete tester shall not exceed 6 pounds. 3.9 Identification of product. The tester shall be marked in accordance with MIL-STD-130. 3.10 Operating instructions.
7、The operating instructions shall be securely attached to the inside of the case cover, positioned as shown in Figure 1, and placed on an easily replaceable card. The instructions shall be as follows: 1. Plug hose with connector from MH-2 tester into female connection of regulator hose, and close rel
8、ief valve on bulb. 2. Test of A-12, A-l2A, A-13, A-14, A-15, A-21, D-1, D-2, D-2A, MB-2, MD-1, or MD-2 regulators: (a) Squeeze bulb until pressure gage reads 17 inches of water and squeeze bladder to hold pressure. Leakage flow gage should not read more than 1.0 liter per minute on “normal“ nor more
9、 than 0.5 liter per minute on “100 percent. I (b) 3. If leakage is excessive, repeat test with tester, plugged into regulator outlet. If leakage is still excessive, regulator is defective; if it is no longer excessive, hose is defective. 4. If leakage exceeds the maximum allowable leakage, remove re
10、gula- tor for repair. Rework tag should read, “Removed for excessive outward leakage. To check the MH-2 tester, close end of stopper with finger and squeeze bulb until pressure gage reaches 17 inches of water pressure. the tester is operating satisfactorily. 5. A reading of zero on the leakage flowm
11、eter indicates 7 o Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-8429B 49 9797906 0243809 9 .- MIL-T-8429B FIGURE 3. Adapter f 8 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-8429B 6.
12、If it is impossible to reach 17 inches of gage pressure and according to test 5, above, tester is operating satisfactorily, the regulator is leaking excessively and should be removed for repair. 7. To test regulator technical order compliance with pressure breathing outlet pressures, read outlet pre
13、ssure in inches of water on testers pressure gage while the regulator is set as specified in the applicable. technical ordex, 3.11 Interchangeability. All parts having the same manufacturers part number shall be directly and completely interchangeable with each other with respect to installation and
14、 performance. bers shall be governed by the drawing number requirements of DOD-D-1000. Changes in manufacturers part num- 3.12 Workmanship. The tester shall be constructed in accordance with high-grade aircraft instrument manufacturing practice. thoroughly cleaned of all oil and foreign matter and f
15、ree from any defects that might affect its operations or functionability. The tester shall be 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise specified in the con- tract of purchase order, the contractor is responsible for the performance of all inspection require
16、ments as specified herein. Except as otherwise speci- fied in the contract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements reserves the right to perform any of the inspections set forth in the specifi- cation where
17、 such inspections are deemed necessary to assure supplies and ser- vices conform to prescribed requirements. - specified herein, unless disapproved by the Government. The Government 4.1.1 Classification of tests. The inspection and testing of testers shall be classified as follows: a. Acceptance tes
18、ts (see 4.2). b. Preproduction testing (see 4.3). 4.2 Acceptance tests. Acceptance test shall consist of: a. Individual tests. b. Sampling tests. 4.2.1 Individual tests. Each tester shall be subjected to the following tests as described under Test Methods of this specification: a. Examination of pro
19、duct. b. Flow measuring gage. c. Pressure gage. d. Leakage. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-84298 49 W 79999060243811 7 W MIL-T-8429B 4.2.2 Sampling plan and tests. 4.2.2.1 Sampling plan. One tester shall be selected at random f
20、rom each lot of 100 testers, or fraction thereof, and, subjected to the following tests: a. Overload. b. High and low temperature operation. c. Shock. 4.2.2.1.1 Rejection. When one tester from a lot fails the specified tests, this is cause for rejection of the lot. Before resubmitting the lot, the c
21、on- tractor shall fully explain to the inspector both the corrections made and the cause of previous rejections 4.3 Preproduction testing. 4.3.1 Preproduction test sample tested by the contractor. The contractor shall subject one tester to the preproduction tests specified in 4.3.4. 4.3.2 Preproduct
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AIRFORCEMILT8429B1983TESTERLEAKAGEDEMANDOXYGENREGULATORTYPEMH2MH2 要求 氧气 调节器 泄露 测试仪 PDF

链接地址:http://www.mydoc123.com/p-428677.html