《AASHTO PG03-2006 AASHTO Practitioner's Handbook - Managing the NEPA Process for Toll Lanes and Toll Roads《AASHTO标准从业者手册.根据国家环境政策法案管理的收费行车线及收费道路.修改件1》.pdf》由会员分享,可在线阅读,更多相关《AASHTO PG03-2006 AASHTO Practitioner's Handbook - Managing the NEPA Process for Toll Lanes and Toll Roads《AASHTO标准从业者手册.根据国家环境政策法案管理的收费行车线及收费道路.修改件1》.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、AASHTO PRACTITIONERS HANDBOOKThe Practitioners Handbook is produced by the AASHTO Center for Environmental Excellence. The Handbook provide practical advice on a range of environmental issues that arise during the planning, development, and operation of transportation projects. The Handbook is prima
2、rily intended for use by project managers and others who are responsible for coordinating compliance with a wide range of regulatory requirements. With their needs in mind, each Handbook includes: key issues to consider; a background briefi ng; practical tips for achieving compliance. In addition, k
3、ey regulations, guidance materials, and sample documents for each Handbook is posted on the Centers web site at http:/environment.transportation.orgMANAGING THE NEPA PROCESS FOR TOLL LANES AND TOLL ROADSConducting National Environmental Policy Act (NEPA) studies projects involving toll lanes and tol
4、l roads involves many sensitive issues and complex considerations. Issues covered in this Handbook include: Developing plans and policies on tolling Building the project team Developing toll alternatives Framing the issues for decisions in the NEPA process Modeling the performance of tolled alternat
5、ives Evaluating impacts of tolled alternatives Synchronizing NEPA reviews with procurement process Considering tolling after NEPA is under way or completedAmerican Association of State Highway and Transportation Offi cials03July 2006AASHTO Center for Environmental ExcellenceManaging the NEPA Process
6、 for Toll Lanes and Toll Roads 1OverviewThis Handbook provides recommendations for conducting National Environmental Policy Act (NEPA) studies for projects involving toll lanes and toll roads. It covers issues associated with the NEPA process itself, as well as a range of related issues, such as dev
7、eloping tolling policies in the transportation planning process and coordinating NEPA studies with a competitive procurement for a public-private partnership.Tolling has received increased attention in recent years as a method for addressing transportation needs. This trend has resulted from many fa
8、ctors, including the expanded availability of electronic toll collection; the inadequacy of traditional funding sources for transportation projects; the removal of certain legal restrictions on tolling under federal law; and the success of toll projects both in the United States and around the world
9、. Recent legislationthe Safe, Accountable, Flexible, and Effi cient Transportation Equity Act: A Legacy for Users (SAFETEA-LU)seems likely to accelerate the trend toward tolling, by creating new programs that allow for the development of toll lanes and toll roads. For NEPA practitioners, the conside
10、ration of tolled alternatives presents a range of new issues to consider. This Handbook provides an overview of the key issues and offers suggestions for consideration in preparing a NEPA study for a project that includes tolled alternatives. It is important to bear in mind that approaches to these
11、issues are rapidly evolving; decisions for each study must be made on a case-by-case basis by the agencies involved, and may be different from the approaches suggested in this Handbook.Key Issues to ConsiderTransportation Plans and PoliciesDoes the statewide and/or metropolitan long-range plan addre
12、ss tolling? In particular, does the plan include a policy specifi cally regarding tolling?Is this project part of a larger network of toll roads or toll lanes? How does the projects role in the larger network affect the purpose and need, termini, and alternatives to be considered for this project?Ha
13、ve tolls on this project been assumed by a state Department of Transportation (DOT) or metropolitan planning organization (MPO) for purposes of revenue forecasts used in transportation plans or programs? If so, what specifi c assumptions about tolls were made?Proposed Tolling ConceptWhat type of tol
14、ling is being proposed? For example, does the project involve all lanes tolled, express toll lanes, high occupancy/toll (HOT) lanes, or some other concept?Does the proposed project involve the conversion of existing free lanes to toll lanes? Or will tolls be established only on new lanes?What toll c
15、ollection technology is proposed? Is it all electronic toll collection (ETC)? Or will a cash payment option be provided? Or has no decision been made?What additional work is needed to develop or refi ne the basic tolling concept in order to complete the NEPA analysis? Who is responsible for this wor
16、k?Scope of NEPA AnalysisWill both toll and non-toll alternatives be considered? Or toll alternatives only? If toll alternatives only, why?Are there are any tolling concepts that are considered “out of bounds” for purposes of the NEPA study (for legal or 2006 by the American Association of State High
17、way and Transportation Officials.All rights reserved. Duplication is a violation of applicable law.2 Managing the NEPA Process for Toll Lanes and Toll Roadspolicy reasons)? If so, how will this be documented?What toll rates will be assumed in the traffi c modeling in the NEPA study?Does the traffi c
18、 model have the capability to evaluate tolled alternatives? If not, what will be required to develop that capability, who will do it, and how long will it take?How will tolling affect the analysis of environmental justice, noise, and air quality impacts? Are there any other impact categories that mi
19、ght be affected by tolling?If NEPA has already been completed at the time tolling is fi rst considered, what additional work (re-evaluation or supplemental EIS) is needed to satisfy NEPA?Relationship of NEPA Process to Project Financing and ProcurementHow is the NEPA process being coordinated with o
20、ther aspects of project development, such as project fi nancing? Who is the “quarterback” for the overall effort within the State DOT?Will the project be developed solely by a public authority? Or will a publicprivate partnership be used? Is a traffi c and revenue study being prepared for purposes o
21、f a bond fi nancing or a potential private investment in the project? How does that study relate (in timing, assumptions, etc.) to the traffi c forecasts that are being prepared in the NEPA process?If a publicprivate partnership is contemplated:When will the selection of a private-sector partner occ
22、ur in relation to the NEPA process? If there is overlap with the NEPA process, how are the two being coordinated?What are the objectives of private sector investors (if known) and how do they relate to project assumptions and featuresfor example, project scope, termini, purpose and need, range of al
23、ternatives? Will the alternatives selection criteria in the NEPA process take into account the objectives of potential private investors? What ground rules will be established regarding communications between the NEPA team and any potential private investors?Who will be responsible for obtaining env
24、ironmental permits? Will this responsibility be placed on a private developer or on the State DOT?Legal IssuesWhat is the legal basis for tolling? Are there any conditions that must be met in order to obtain authorization to establish tolls on this facility?Are there any applicable state laws or pol
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AASHTOPG032006AASHTOPRACTITIONER SHANDBOOKMANAGINGTHENEPAPROCESSFORTOLLLANESANDTOLLROADSAASHTO 标准 业者

链接地址:http://www.mydoc123.com/p-417886.html