AASHTO M 190-2004 Standard Specification for Asphalt-Coated Corrugated Metal Culvert Pipe and Pipe-Arches《沥青涂层金属涵管和管拱的标准规范》.pdf
《AASHTO M 190-2004 Standard Specification for Asphalt-Coated Corrugated Metal Culvert Pipe and Pipe-Arches《沥青涂层金属涵管和管拱的标准规范》.pdf》由会员分享,可在线阅读,更多相关《AASHTO M 190-2004 Standard Specification for Asphalt-Coated Corrugated Metal Culvert Pipe and Pipe-Arches《沥青涂层金属涵管和管拱的标准规范》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、Standard Specification for Bituminous-Coated Corrugated Metal Culvert Pipe and Pipe-Arches AASHTO Designation: M 190-04 (2012) American Association of State Highway and Transportation Officials 444 North Capitol Street N.W., Suite 249 Washington, D.C. 20001 TS-4b M 190-1 AASHTO Standard Specificatio
2、n for Bituminous-Coated Corrugated Metal Culvert Pipe and Pipe-Arches AASHTO Designation: M 190-04 (2012) 1. SCOPE 1.1. This specification covers bituminous-coated corrugated metal pipe and pipe-arches intended to be used for the construction of metal culverts of the following types. 2. REFERENCED D
3、OCUMENTS 2.1. AASHTO Standards: M 36, Corrugated Steel Pipe, Metallic-Coated, for Sewers and Drains M 196, Corrugated Aluminum Pipe for Sewers and Drains T 44, Solubility of Bituminous Materials T 49, Penetration of Bituminous Materials 2.2. ASTM Standards: A849, Standard Specification for Post-Appl
4、ied Coatings, Pavings, and Linings for Corrugated Steel Sewer and Drainage Pipe A862/A862M, Standard Practice for Application of Asphalt Coatings to Corrugated Steel Sewer and Drainage Pipe C670, Standard Practice for Preparing Precision and Bias Statements for Test Methods for Construction Material
5、s D6/D6M, Standard Test Method for Loss on Heating of Oil and Asphaltic Compounds D1005, Standard Test Method for Measurement of Dry-Film Thickness of Organic Coatings Using Micrometers 3. DESCRIPTION 3.1. This specification covers four types of pipe as follows: Type AFully Bituminous-Coated Type BH
6、alf Bituminous-Coated with Paved-Invert Type CFully Bituminous-Coated and Paved-Invert Type DFully Bituminous-Coated and 100 Percent Paved or Lined 3.2. Bituminous-coated corrugated metal culvert pipe and pipe-arches shall conform to the requirements of M 36 or M 196 and, in addition, shall be coate
7、d with bituminous material as hereinafter described for the particular type specified. 2015 by the American Association of State Highway and Transportation Officials.All rights reserved. Duplication is a violation of applicable law.TS-4b M 190-2 AASHTO 3.2.1. Type AThe pipe shall be uniformly coated
8、, inside and outside, to a minimum thickness of 1.3 mm measured on the crest of the corrugations or, in the case of Type 1A pipe, over the inner surface of the pipe. This coating is also used for Type 1A pipe. 3.2.2. Type BThe pipe shall be uniformly coated for approximately one-half the circumferen
9、ce of the pipe (bottom of the pipe installed), inside and outside to a minimum thickness of 1.3 mm and, in addition, the bituminous material shall be applied in such a manner that one or more smooth pavements will be formed in the invert (inside bottom of the pipe when installed), filling the corrug
10、ations for at least 25 percent of the circumference of a pipe and 40 percent of the circumference of a pipe-arch. The pavement shall have a minimum thickness of 3.2 mm above the crest of the corrugations, except where the upper edges intersect the corrugations. 3.2.3. Type CThe pipe shall be fully c
11、oated as required for Type A and, in addition, a smooth pavement shall be provided as required for Type B. 3.2.4. Type DThe pipe shall be fully coated as required for Type A and, in addition, a smooth lining of asphalt shall be centrifugally spun inside the pipe. The lining shall have a minimum thic
12、kness of 3.2 mm above the crest of the corrugations. 4. BITUMINOUS MATERIAL 4.1. The bituminous material for coating shall be an asphalt having the following properties: Limit, % Solubility in trichloroethylene, not less than 99.0 Loss on heating to 163C, not more than 1 Penetration of residue after
13、 heating compared with penetration of same sample before testing for loss on heating, not less than 85 4.2. Shock TestThe bitumen shall be considered acceptable if not more than one of four test specimens shows a crack. If it is difficult to determine visually whether a specimen has cracked, the spe
14、cimen should be removed from the test apparatus and subjected to a slight bending. 4.3. Flow TestsThe bitumen shall be considered acceptable if the flow does not exceed 6.4 mm on either of the two test specimens. 5. TANK CONTROL AND MAINTENANCE 5.1. Tank TemperatureThe asphalt temperature in the tan
15、k shall be maintained between 200 and 210C during the coating operation. 5.2. Tank Cleanliness: 5.2.1. The asphalt in the tank shall be kept free of contaminants such as dirt, drum paper, and asphalt drippings from the shop floor. 5.2.2. The asphalt tank shall be cleaned as necessary with a minimum
16、frequency of once per year. 2015 by the American Association of State Highway and Transportation Officials.All rights reserved. Duplication is a violation of applicable law.TS-4b M 190-3 AASHTO 5.2.3. The foam that results from the inadvertent introduction of moisture to the tank shall be skimmed of
17、f or moved to the side of the tank before inserting or extracting the product. 6. PROCEDURE 6.1. Coating ApplicationApply the asphalt coating by inserting the product into the bath twice; the first application results in a thin coating to achieve good adherence, and the second achieves the coating t
18、hickness required in Section 3.2. 6.1.1. Steel surfaces shall be free of dirt, grease, dust, and moisture before placement in the asphalt bath. The product shall be prepared immediately prior to the coating operation. 6.1.2. Rotate any large structures in the tank to ensure that all surfaces are coa
19、ted. 6.1.3. The product must remain in the tank until it achieves a minimum temperature of 190C. The specific time requirements will depend on factors unique to each operation and the product being coated. The time to reach the required temperature is dependent on the initial temperature of the prod
20、uct, the steel thickness, the size of the product, and the volume of the tank. 6.1.4. The following table contains minimum immersion times: Steel Thickness, mm Time, min 1.32 2 to 2.5 1.63 2.5 to 3 2.01 3.5 to 5 2.77 5 to 6 3.50 6.5 to 8 4.27 8 to 14 6.1.5. Cool the product to ambient temperature be
21、fore application of the second coat. 6.1.6. Insert the product a second time to provide the minimum thickness of each surface. 6.2. Paving: 6.2.1. Pave the interior of the coated pipe by applying the hot asphalt from the tank to the interior surface of the pipe to provide a thickness over the crest
22、of the corrugation as required by Section 3.2. Pump the hot asphalt to the pipe by appropriate mechanical means, not by transfer with buckets. The asphalt used for paving shall be at least 200C to ensure good adhesion to the coated pipe. Pave the pipe as soon as possible after coating to avoid poor
23、adhesion associated with the accumulation of dirt and other residue on the coating surface. 6.2.2. Place end dams of wood or heavy paper at the ends of the pipe to retain the asphalt in the pipe. Three or more applications are usually required for most operations. 6.3. Smooth Lining: 6.3.1. Line the
24、 interior of the pipe that has been coated by covering the corrugations with hot asphalt. Provide a thickness over the crest of the corrugations as required by Section 3.2. 6.3.2. Spray the hot asphalt, taken from the tank, while rotating the pipe on a powered rotary device to provide a uniform smoo
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AASHTOM1902004STANDARDSPECIFICATIONFORASPHALTCOATEDCORRUGATEDMETALCULVERTPIPEANDPIPEARCHES 沥青 涂层 金属 涵管

链接地址:http://www.mydoc123.com/p-417694.html