1、Section 7 EARTH RETAINING SYSTEMS 7.1 DESCRIPTION This work shall consist of furnishing and installing earth retaining systems in accordance with the plans, these specifications, and the special provisions. Earth retaining systems include concrete and masonry gravity walls, reinforced concrete retai
2、ning walls, sheet pile and soldier pile walls (with and without ground an- chors or other anchorage systems), crib and cellular walls, and mechanically stabilized earth walls. 7.2 WORKING DRAWINGS Working drawings and design calculations shall be submitted to the Engineer for review and approval at
3、least 4 weeks before work is to begin. Such submittals shall be required (1) for each alternative proprietary or nonpropri- etary earth retaining system proposed as permitted or specified in the contract, (2) when complete details for the system to be constructed are not included in the plans, and (
4、3) when otherwise required by the special provisions or these specifications. Working drawings and design calcu- lations shall include the following: (a) Existing ground elevations that have been verified by the Contractor for each location involving con- struction wholly or partially in original gr
5、ound. (b) Layout of wall that will effectively retain the earth but not less in height or length than that shown for the wall system in the plans. (c) Complete design calculations substantiating that the proposed design satisfies the design parameters in the plans and in the special provisions. (d)
6、Complete details of all elements required for the proper construction of the system, including complete material specifications. (e) Earthwork requirements including specifications for material and compaction of backfill. (f) Details of revisions or additions to drainage sys- tems or other facilitie
7、s required to accommodate the system. (g) Other information required in the plans or special provisions or requested by the Engineer. The Contractor shall not start work on any earth re- taining system for which working drawings are required until such drawings have been approved by the Engineer. Ap
8、proval of the Contractors working drawings shall not relieve the Contractor of any of his responsibility under the contract for the successful completion of the work. 7.3 MATERIALS 7.3.1 Concrete 7.3.1.1 Cast-in-Place Cast-in-place concrete shall conform to the require- ments of Section 8, “Concrete
9、 Structures.” The concrete shall be Class A unless otherwise indicated in the contract documents. 7.3.1.2 Pneumatically Applied Mortar Pneumatically applied mortar shall conform to the requirements of Section 24, “Pneumatically Applied Mortar.” 7.3.1.3 Precast Elements The materials, manufacturing,
10、storage, handling, and erection of precast concrete elements shall conform to the requirements in Article 8.13, “Precast Concrete Members.” Unless otherwise shown on the plans or on the approved working drawings, Portland cement con- crete used in precast elements shall conform to Class A (AE) with
11、a minimum compressive strength at 28 days of 4,000 psi. 7.3.1.4 Segmental Concrete Facing Blocks Masonry concrete blocks used as wall facing elements shall have a minimum compressive strength of 4,000 psi and a water absorption limit of 5%. In areas of repeated freeze-thaw cycles, the facing blocks
12、shall be tested in ac- cordance with ASTM C 1262 to demonstrate durability. The facing blocks shall meet the requirements of ASTM 515 516 HIGHWAY BRIDGES 7.3.1.4 C 1372, except that acceptance regarding durability under this testing method shall be achieved if the weight loss of each of 4 of the 5 s
13、pecimens at the conclusion of 150 cy- cles does not exceed 1% of its initial weight. Blocks shall also meet the additional requirements of ASTM C 140. Facing blocks directly exposed to spray from deiced pave- ments shall be sealed after erection with a water resistant coating or be manufactured with
14、 a coating or additive to increase freeze-thaw resistance. 7.3.2 Reinforcing Steel Reinforcing steel shall conform to the requirements of Section 9, “Reinforcing Steel.” 7.3.3 Structural Steel Structural steel shall conform to AASHTO M 270 (ASTM A 709) Grade 36 unless otherwise specified. 7.3.4 Timb
15、er Timber shall conform to the requirements of Section 16, “Timber Structures” and Article 4.2.2, “Timber Piles.” 7.3.5 Drainage Elements 7.3.5.1 Pipe and Perforated Pipe Pipe and perforated pipe shall conform to subsections 708 and 709 of the AASHTO Guide SpeciJcations for Highway Construction. 7.3
16、.5.2 Geotextile Geotextile shall conform to AASHTO M 288. 7.3.5.3 Permeable Material Permeable material shall conform to subsection 704 of the AASHTO Guide SpeciJcations for Highway Con- struction unless otherwise specified in the contract or the approved working drawings. 7.3.5.4 Geocomposite Drain
17、age Systems Geocomposite drainage systems shall conform to the requirements specified in the special provisions or the ap- proved working drawings. 7.3.6 Structure Backfill Material 7.3.6.1 General All structure backfill material shall consist of material free from organic material or other unsuitab
18、le material as determined by the Engineer. Gradation will be determined by AASHTO T 27. Grading shall be as follows unless oth- erwise specified. Sieve Size Percent Passing 3 in. 1 O0 No. 4 35-100 No. 30 20-100 No. 200 0-15 7.3.6.2 Crib and Cellular Walls Structure backfill material for crib and cel
19、lular walls shall be of such character that it will not sift or flow through openings in the wall. For wail heights over 20 feet (6 meters), the following grading shall be required: Sieve Size Percent Passing 3 in. 1 O0 No. 4 25-70 No. 30 5-20 No. 200 0-5 7.3.6.3 Mechanically Stabilized Earth Walls
20、Structure backfill material for MSE walls shall consist of material free from organic material or other unsuitable material as determined by the Engineer. Gradation shall be determined by AASHTO T 27. Grading shall be as fol- lows unless otherwise specified: Sieve Size Percent Passing 4 in.+ 1 O0 No
21、. 40 0-60 No. 200 0-15” +For the soil to be considered to be nonaggressive, the maximum soil particle size for geosynthetic reinforce- ment shall be 0.75 inches unless full scale installa- tion damage tests are conducted in accordance with ASTM D 5818, or if epoxy coatings are used for steel reinfor
22、cements. *Plasticity index (PI), as determined by AASHTO T 90, shall not exceed 6. The material shall exhibit an angle of internal friction of not less than 34”, as determined by the standard Di- 7.3.6.3 DIVISION II-CONSTRUCTION 5 17 rect Shear Test, AASHTO T 236, on the portion finer than the No. 1
23、0 sieve, utilizing a sample of the material compacted to 95% of AASHTO T 99, Methods C or D (with oversized correction as outlined in Note 7) at optimum moisture content. No testing is required for backfills where 80% of the sizes are greater than 0.75 inches. The materials shall be substantially fr
24、ee of shale or other soft, poor durability particles. The material shall have a magnesium sulfate soundness loss of less than 30% after four cycles or a sodium sulfate soundness loss of less than 15% after five cycles determined in accordance with AASHTO T 104. The soil shall also have an organic co
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AASHTOHB17DIVISIONIISEC72002DIVISIONIICONSTRUCTIONEARTHRETAININGSYSTEMS 土系 PDF

链接地址:http://www.mydoc123.com/p-417602.html