1、. 30.1 GENERAL 30.1.1 Description Section 30 THERMOPLASTIC PIPE This work shall consist of furnishing and installing thermoplastic pipe in conformance with these Specifica- tions, any special provisions, and the details shown on the plans. As used in this specification, thermoplastic pipe is defined
2、 in Division I, Section 17, “Soil-Thermoplastic Pipe Interaction Systems.” 30.1.2 Workmanship and Inspection All thermoplastic pipe materials shall conform to the workmanship and inspection requirements of AASHTO M 278, M 294, or M 304; or ASTM F 679, F 714, F 794, or F 894 as applicable. 30.2 WORKI
3、NG DRAWINGS Whenever specified or requested by the Engineer, the Contractor shall provide manufacturers installation in- structions or working drawings with supporting data in sufficient detail to permit a structural review. Sufficient copies shall be furnished to meet the needs of the Engi- neer an
4、d other entities with review authority. The work- ing drawings shall be submitted sufficiently in advance of proposed installation and use to allow for their review, revision, if needed, and approval without delay of the work. The Contractor shall not start construction of any thermoplastic pipe ins
5、tallations for which working draw- ings are required until the drawings have been approved by the Engineer. Such approval will not relieve the Con- tractor of responsibility for results obtained by use of these drawings or any of the other responsibilities under the contract. 30.3 MATERIALS 30.3.1 T
6、hermoplastic Pipe Polyethylene pipe shall conform to the requirements of AASHTO M 294, or ASTM F 714, or ASTM F 894. Poly(Viny1 Chloride) (PVC) pipe shall conform to the requirements of AASHTO M 278 or M 304; or ASTM F 679 or F 794. 30.3.2 Bedding Material and Structurai Backfill Bedding and structu
7、ral backfill shall meet the re- quirements ofAASHTO M 145,A-1, A-2-4, A-2-5, or A- 3. Bedding material shall have a maximum particle size of 1.25 inch. Backfill for thermoplastic pipe shall be free of organic material, stones larger than 1 !4 inch in great- est dimension, or frozen lumps. Moisture c
8、ontent shall be in the range of optimum (typically -3% to +2%) per- mitting thorough compaction. Consideration should be given to the potential for migration of fines from adja- cent materials into open-graded backfill and bedding materials. For pipe types that are not smooth on the outside (cor- ru
9、gated or profile walls), backfill gradations should be se- lected that will permit the filling of the corrugation or pro- file valleys. Flowable fills, such as controlled low strength mortar (CLSM) or controlled density fill (CDF), may be used for backfill and bedding provided adequate flotation re-
10、 sistance can be achieved by restraints, weighting, or placementtechnique. With CLSM backfill, trench width can be reduced to a minimum of the outside diameter plus 12 inches. When CLSM is used all joints shall have gaskets. 687 - 688 HIGHWAY BRIDGES 30.5.4 30.4 ASSEMBLY 30.4.1 General Thermoplastic
11、 pipe shall be assembled in accordance with the manufacturers instructions. All pipe shall be un- loaded and handled with reasonable care. Pipe shall not be rolled or dragged over gravel or rock and shall be pre- vented from striking rock or other hard objects during placement in trench or on beddin
12、g. Thermoplastic pipe shall be placed in the bed starting at the downstream end. 30.4.2 Joints Joints for thermoplastic pipe shall meet the perfor- mance requirements for soiltightness unless watertight- ness is specified. (a) Corrugated bands (with or without gaskets) (b) Bell and spigot pipe ends
13、(with or without gaskets) (c) Double bell couplings (with or without gaskets) 30.5 INSTALLATION 30.5.1 General Installation Requirements Trenches must be excavated in such a manner as to in- sure that the sides will be stable under all working condi- tions. Trench walls shall be sloped or supported
14、in con- formance with all standards of safety. Only as much trench as can be safely maintained shall be opened. All GLIIG atmi UG UdLKlllltxI as soon as praciicabie, but not later than the end of each working day. Trench details, including foundation, bedding, haunch- ing, initial backfill, final ba
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AASHTOHB17DIVISIONIISEC302002DIVISIONIICONSTRUCTIONTHERMOPLASTICPIPEERRATA012003 热塑管 PDF

链接地址:http://www.mydoc123.com/p-417598.html