AASHTO GSBTW AMD 1-2008 Guide Design Specifications for Bridge Temporary Works (Revision 1 2008 Interim Revision)《桥梁临时工程设计规范指南.修改件1 2008年临时修改件》.pdf
《AASHTO GSBTW AMD 1-2008 Guide Design Specifications for Bridge Temporary Works (Revision 1 2008 Interim Revision)《桥梁临时工程设计规范指南.修改件1 2008年临时修改件》.pdf》由会员分享,可在线阅读,更多相关《AASHTO GSBTW AMD 1-2008 Guide Design Specifications for Bridge Temporary Works (Revision 1 2008 Interim Revision)《桥梁临时工程设计规范指南.修改件1 2008年临时修改件》.pdf(35页珍藏版)》请在麦多课文档分享上搜索。
1、 To recipients of the Guide Design Specifications for Bridge Temporary Works, First Edition (1995): Instructions Interim revisions have been made to the Guide Design Specifications for Bridge Temporary Works, First Edition (1995). They have been designed to replace the corresponding pages in the boo
2、k and are numbered accordingly. Underlined copy indicates revisions that were approved in 2007 by the AASHTO Highways Subcommittee on Bridges and Structures. A listing of newly changed and deleted articles is included with these interim revisions as an addendum to the preface of the book. All revise
3、d pages also display a box in the lower outside corner indicating the interim publication year. Any non-technical changes in page appearance will be indicated by this revision box alone to differentiate such changes from those which have been approved by the AASHTO Highways Subcommittee on Bridges a
4、nd Structures. To keep your Specifications correct and up-to-date, please replace the appropriate pages in the book with the pages in this packet. ii American Association of State Highway and Transportation Officials Executive Committee 19941995 Voting Members Officers: President: Wayne Shackelford,
5、 Georgia Vice President: Bill Burnett, Texas Secretary/Treasurer: Clyde E. Pyers, Maryland Regional Representatives: Region I Patrick Garahan, Vermont Region II Ben Watts, Florida Region III Darrel Rensick, Iowa Region IV Larry Bonine, Arizona Non-Voting Members Executive Director: Francis B. Franco
6、is, Washington, D.C. 2008 by the American Association of State Highway and Transportation Officials.All rights reserved. Duplication is a violation of applicable law.1 Interim2008 Section 1 INTRODUCTION 1.1 SCOPE This guide design specification has been developed for use by State agencies to include
7、 in their existing standard specifications for falsework, formwork, and related temporary construction used to construct highway bridge structures. The specification should also be useful to bridge engineers, falsework designers, contractors, and inspectors. Sections within this specification addres
8、s falsework, formwork, and temporary retaining structures. Reference standards, related publications, and definitions are identified below. 1.2 REFERENCES 1.2.1 Codes and Standards Standard Specifications for Highway Bridges, 17th Edition, American Association of State Highway and Transportation Off
9、icials, Washington, DC. Errata to the Standard Specifications for Highway Bridges, 2003, American Association of State Highway and Transportation Officials, Washington, DC. Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-03), Federal Highway Administrati
10、on, Washington, DC. American National Standard for Construction and Demolition Operations: Concrete and Masonry Work-Safety Requirements (ANSI A10.9-1997), American National Standards Institute, New York, NY. American National Standard for Construction and Demolition Operations: Safety and Health Pr
11、ogram Requirements for Multi-Employer Projects (ANSI A 10.33-1998), American National Standards Institute, New York, NY. Manual of Steel Construction, Thirteenth Edition, American Institute of Steel Construction, Chicago, IL. Structural Welding Code-Steel (AWS D1.1/D1.1M-06), American Welding Societ
12、y, Miami, FL. National Design Specification for Wood Construction, 2005 Edition, National Forest Products Association, Washington, DC. NDS Supplement-Design Values for Wood Construction, National Forest Products Association, Washington, DC. Building Code Requirements for Reinforced Concrete (ACI 318
13、-05) and Commentary (ACI 318R-05), American Concrete Institute, Detroit, MI. Minimum Design Loads for Buildings and Other Structures (ASCE/SEI 7-05), American Society of Civil Engineers, New York, NY. Uniform Building Code, 1997 Edition, International Conference of Building Officials, Whittier, CA.
14、The BOCA National Building Code/1999, Building Officials d is the least dimension of rectangular columns, or the width of a square of equivalent cross-sectional area for round columns, or the depth of beams; b is the width and t is the thickness of the compression flange; and r is the radius of gyra
15、tion of the member. 2.1.2.3 Welding All provisions of the Structural Welding Code, AWS D1.1/D1.1M, of the American Welding Society, except 2.3.2.4, 2.5, 8.13.1.2, and Section 9, as appropriate, apply to work performed under this specification. 2.1.3 Timber 2.1.3.1 Allowable Stresses All species of w
16、ood to which allowable unit stresses have been assigned in the National Design Specification for Wood Construction (NDS) Supplement are acceptable for use in falsework. Design working stresses for new lumber shall not exceed the design values for visually graded dimension lumber and visually graded
17、timbers as tabulated in the National Design Specification for Wood Construction (NDS) Supplement. The listed values are for normal load duration and dry service conditions, and shall be modified as provided herein. 2.1.3.2 Modification Factors Modification factors for service conditions and duration
18、 of load shall be as prescribed by NDS except that the normal service condition for falsework members shall be considered to be dry and reduction for wet service conditions will not apply. All modification factors are cumulative. Load duration factors shall not apply to values for modulus of elastic
19、ity or compression perpendicular to the grain. 2008 by the American Association of State Highway and Transportation Officials.All rights reserved. Duplication is a violation of applicable law.7 Interim2008 2.2.4 Minimum Vertical Load The minimum total design vertical load for any falsework member sh
20、all be not less than 100 psf (4800 N/m2) for the combined dead and live load, exclusive of any increase for impact, regardless of slab thickness. 2.2.5 Environmental Loads 2.2.5.1 Wind For heavy duty shoring systems having a vertical load-carrying capacity exceeding 30 kips (130 N) per tower leg, th
21、e minimum horizontal load to be allowed for wind shall be determined in accordance with Chapter 23, Part II of the Uniform Building Code (reproduced in Appendix C). The wind impact area shall be the total projected area of all elements in the tower face normal to the applied wind. The basic wind pre
22、ssure for each height zone shall be increased by 5 psf (240 N/m2) for falsework members over or adjacent to traffic openings. The minimum horizontal load to be allowed for wind on all other types of falsework, including falsework supported on heavy duty steel shoring, shall be the sum of the product
23、s of the wind impact area and the applicable wind pressure value for each height zone listed on Table 2.2. The basic wind speed used in the determination of design wind loads shall be as given in Fig. 2.1. The wind impact area shall be the gross projected area of the falsework and any unrestrained p
24、ortion of the permanent structure, excluding the areas between falsework posts or towers where diagonal bracing is not used. The basic wind pressure for each height zone shall be increased by 5 psf (240 N/m2) for falsework members over or adjacent to traffic openings. 2.2.5.2 Stream Flow When falsew
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AASHTOGSBTWAMD12008GUIDEDESIGNSPECIFICATIONSFORBRIDGETEMPORARYWORKSREVISION12008INTERIMREVISION 桥梁 临时

链接地址:http://www.mydoc123.com/p-417524.html