ABS 187 CORR-2017 GUIDE FOR BALLAST WATER TREATMENT AUGUST 2016.pdf
《ABS 187 CORR-2017 GUIDE FOR BALLAST WATER TREATMENT AUGUST 2016.pdf》由会员分享,可在线阅读,更多相关《ABS 187 CORR-2017 GUIDE FOR BALLAST WATER TREATMENT AUGUST 2016.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、 GUIDE FOR BALLAST WATER TREATMENT AUGUST 2016 CORRIGENDA/EDITORIALS 1 February 2017 Page No. Paragraph Comments Foreword iii Foreword In sixth paragraph, reference “Appendix 1” to read “Annex 1”. iii Foreword In sixth paragraph, reference “4/3.4.3” to read “4/3.5”. iii Foreword In seventh paragraph
2、, reference “Appendix 2B” to read “Appendix 3”. iii Foreword In eighth paragraph, reference “Appendix 3B” to read “Appendix 5”. iv Foreword In ninth paragraph, reference “Appendices 2 and 3” to read “Appendices 3, 4 and 5”. iv Foreword In ninth paragraph, references “Appendices 2A and 3A accordingly
3、” to read “Appendices 4, 6 and 7, respectively”. Section 1 General 3 1/9 Reference “Appendix 1” to read “Annex 1”. Annex 1 United States Coast Guard Type Approval 6 1/Annex 1 In title, “Appendix 1” to read “Annex 1”. 6 1/Annex 1 At the end of the first paragraph, add, “which states the following:”.
4、Section 3 General Requirements 11 3/3 Delete last paragraph of Subsection 3/3. 11 3/5.1 Relocate last paragraph of Subsection 3/3 to first paragraph of 3/5.1: “To receive the BWT notation, the BWMS installed onboard is to receive a Type Approval Certificate issued by an IMO Member State. For a syste
5、m that makes use of active substances, documentation relating to the IMO Basic Approval and Final Approval are required to be submitted to ABS.”. ABSGUIDE FOR BALLAST WATER TREATMENT .2016 1 Corrigenda/Editorials 1 February 2017 Page No. Paragraph Comments Section 3 General Requirements 12 3/5.1 Rel
6、ocate text of 3/5.5 to the end of 3/5.1: “For obtaining ABS certification, the acceptability of an IMO Member State TA by ABS will be subject to the following requirements: i) The approval of a BWMS installation or the issuance of an ABS PDA/TA Certificate, will be subject to the condition that the
7、documentation submitted includes the current valid flag Administration TA Certificate, Instruction Manual with the associated original approved piping schematics, along with its related components positively identified in the vendors/manufacturers submission for review or approval. ii) The approval
8、of a BWMS installation will only be considered subject to, and only if, the exact configuration of the entire system, with each of its components has been included in the schematics to be approved, as identified in the documentation in 3/5.1i) above. iii) The acceptance of any deviation from the ori
9、ginal flag Administration TA will be subject to the submission of documentation to ABS, issued by the TA issuing flag Administration or an RO on behalf of the TA issuing flag Administration with the endorsement of the flag Administration certifying that the deviation is acceptable within the framewo
10、rk of the original flag Administration TA certification. Such certification of acceptance will not be valid if issued by an RO only, in lieu of issuance of certification by an RO on behalf of the TA issuing flag Administration.”. 12 3/5.1 In first line, “IMO Member State TA” to read “IMO Member Stat
11、e Type Approval (TA)”. 12 3/5.5 Delete 3/5.5. 12 3/7.1.1 In second paragraph, reference “Appendix 5” to read “Appendix 7”. 13 3/7.1.2 Revise “to maintain its currency” to read “and maintained up to date”. Section 4 System-Related and Installation Criteria 15 4/3xiii) Revise to read “If servicing haz
12、ardous ballast tanks and installed in a hazardous area, among the other requirements indicated in this Guide, the BWMS is to comply with Appendix 6. If installed in a non-hazardous area, the BWMS is to comply with Appendices 1, 2, 3, 4, and 5 of this Guide, as applicable.” 15 4/3xiii) Reference “App
13、endix 4” to read “Appendix 6”. 15 4/3xiii) Reference “Appendices 1, 2A, 2B, 3A and 3B” to read “Appendices 1, 2, 3, 4, and 5”. 16 4/3.3.1ii) Reference “4/3.4.3” to read “4/3.5”. 17 4/3.3.2ii) Reference “4/3.4.3” to read “4/3.5”. 17 4/3.3.2ii)a) Revise “shutdown” to read “shut down”. 17 4/3.3.2ii)b)1
14、) Revise “shutdown” to read “shut down”. 17 4/3.3.2ii)c)1) Revise “shutdown” to read “shut down”. 18 4/3.4 Revise title to read, “BWMS Installations in Hazardous Areas on the Deck of Oil Carriers, Chemical Carriers or Tank Barges”. 18 4/3.4i) Modified text “compartment” to read “compartments”. 18 4/
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ABS187CORR2017GUIDEFORBALLASTWATERTREATMENTAUGUST2016PDF

链接地址:http://www.mydoc123.com/p-400719.html