API SPEC 6A-2010 Specification for Wellhead and Christmas Tree Equipment (TWENTIETH EDITION Incorporating ERTA 1 January 2011 ADDENDUM 1 November 2011 ERTA 2 November 2011 ADDENDUM.pdf
《API SPEC 6A-2010 Specification for Wellhead and Christmas Tree Equipment (TWENTIETH EDITION Incorporating ERTA 1 January 2011 ADDENDUM 1 November 2011 ERTA 2 November 2011 ADDENDUM.pdf》由会员分享,可在线阅读,更多相关《API SPEC 6A-2010 Specification for Wellhead and Christmas Tree Equipment (TWENTIETH EDITION Incorporating ERTA 1 January 2011 ADDENDUM 1 November 2011 ERTA 2 November 2011 ADDENDUM.pdf(466页珍藏版)》请在麦多课文档分享上搜索。
1、Date of Issue: June 2016 Affected Publication: API Specification 6A, Specification for Wellhead and Christmas Tree Equipment, Twentieth Edition, October 2010 ERRATA 8 (includes changes from Errata 1, January 2011; Errata 2, November 2011; Errata 3, June 2013; Errata 4, August 2013; Errata 5, Novembe
2、r 2013, and Errata 6, March 2014; and Errata 7, December 2014) Page vii, Table of Contents, change: Annex O (informative) API Regional Annex to Annex O (normative) API Regional Annex Page 67, Table 17, change: Impact Testing 7.4.2.1.2 7.4.2.1.2 7.4.2.1.2 7.4.2.1.2 to Impact Testing 7.4.2.1.2 7.4.2.2
3、.2 7.4.2.3.2 7.4.2.4.2 Page 69, 7.4.2.2.12 a), change to read: 100% of all pressure-containing fabrication welds and weld overlay shall be examined by either magnetic-particle (in the case of ferromagnetic materials) or liquid-penetrant (in the case of ferromagnetic or non-ferromagnetic materials) m
4、ethods after all welding, post-weld heat treatment and machining operations. Page 87, Table 30, insert the following footnote at the end of the table: Note: Due to SI unit conversion methods noted in Annex B, the drift dimensions in millimeters may have interference if used for drifting equipment ma
5、nufactured to USC bore sizes, measured in inches. It is recommended that the units of measure used for the drift diameter D1be consistent with the units used for manufacturing equipment to be drift tested. Page 89, 7.4.9.4.5, change: The following apply: to For PSL 2 and PSL 3G, the following apply:
6、 Page 91, Table 33, change: Hydrostatic test body 7.4.9.3.3 7.4.9.3.3 seat 7.4.9.3.5 7.4.9.4.5 Hydrostatic text (extended) body 7.4.9.5.4 7.4.9.5.4 7.4.9.5.4 seat 7.4.9.5.6 7.4.9.5.6 7.4.9.5.6 to Hydrostatic test body 7.4.9.3.3 7.4.9.3.3 seat 7.4.9.3.5 7.4.9.4.5 7.4.9.4.5 Hydrostatic text (extended)
7、 body 7.4.9.5.4 7.4.9.5.4 7.4.9.5.4 seat 7.4.9.5.6 7.4.9.5.6 Page 91, Table 34, change: Hydrostatic test body 7.4.9.3.3 7.4.9.3.3 seat 7.4.9.3.5 7.4.9.4.5 Hydrostatic text (extended) body 7.4.9.5.4 7.4.9.5.4 7.4.9.5.4 seat 7.4.9.5.6 7.4.9.5.6 7.4.9.5.6 to Hydrostatic test body 7.4.9.3.3 7.4.9.3.3 se
8、at 7.4.9.3.5 7.4.9.4.5 7.4.9.4.5 Hydrostatic text (extended) body 7.4.9.5.4 7.4.9.5.4 7.4.9.5.4 seat 7.4.9.5.6 7.4.9.5.6 Page 96, 7.4.10.1.2 c), change the reference in the second sentence from: Table 48 and Table B.48 to Table 61 and Table B.61 Page 102, change title from: 7.4.11 Bullplugs, valve-r
9、emoval plugs and back-pressure valves (see Table 26) to 7.4.11 Bullplugs, valve-removal plugs and back-pressure valves (see Table 38) Page 121, Table 49: Change “tol.” column values for Outside diameter of flange to be “” the stated value. Page 124, Table 50: Change “tol.” column values for Outside
10、diameter of flange to be “” the stated value. Page 162, Table 63 (continued), line R 57, change the Width of Flat of Octagonal Ring (C) value from: 7,79 to 7,75 Page 198, Table 87 (continued): The first two columns, for 13,8 MPa, 20,7 MPa, and 34,5 MPa, should read as follows: Nominal size and bore
11、Vertical BV +0,80Outlet B0+0,8013,8 MPa 52 52 65 52 65 65 79 52 79 65 79 79 103 52 103 65 103 79 103 103 20,7 MPa 79 52 79 65 79 79 103 52 103 65 103 79 103 103 34,5 MPa 52 52 65 52 65 65 79 52 79 65 79 79 103 52 103 65 103 79 103 103 130 52 130 65 130 79 130 103 130 130 Page 200, Table 88 (continue
12、d): The first two columns, for 13,8 MPa, 20,7 MPa, and 34,5 MPa, should read as follows: Nominal size and bore Vertical BV +0,80Outlet B0 +0,8013,8 MPa 52 52 65 52 65 65 79 52 79 65 79 79 103 52 103 65 103 79 103 103 20,7 MPa 79 52 79 65 79 79 103 52 103 65 103 79 103 103 34,5 MPa 52 52 65 52 65 65
13、79 52 79 65 79 79 103 52 103 65 103 79 103 103 130 52 130 65 130 79 130 103 130 130 Page 202, Figure 19 d), replace with the following: Page 218, Section 10.19.9, delete the following: “and shall be equipped with a bleeder plug” Page 272, Table B.55 (continued), change: 10 000 psi 5 1/85,16 14,06 0,
14、06 0,12 8,69 3,13 8,81 7,19 3,19 0,38 to 10 000 psi 5 1/85,16 14,06 0,06 0,12 8,69 3,12 8,81 7,19 3,19 0,38 Page 277, Table B.57 (continued), change: 10 000 psi 5 1/85,16 14,06 0,06 0,12 8,69 3,13 8,81 7,19 3,19 0,38 to 10 000 psi 5 1/85,16 14,06 0,06 0,12 8,69 3,12 8,81 7,19 3,19 0,38 Page 319, Tab
15、le F.1, change Valves, gate and plug / Allowable leakage to: 30 cm3/hr/25,4 mm of nominal bore size Page 319, Table F.1, change Hangers / Allowable leakage to: 10 cm3/hr/25,4 mm of nominal bore size Page 355, Table G.4, remove the following row: ASTM A453/453M Gr660 0,99 0,95 0,97 (UNS S66286) Page
16、383, Section K.9, delete the second sentence: “Top connectors shall be shipped with a bleeder plug.” Page 393, Table K.5, fifth row, Seals column, replace: SAE AS 568-436-90 FKM with SAE AS 568-435-90 FKM Specification for Wellhead and Christmas Tree EquipmentANSI/API SPECIFICATION 6ATWENTIETH EDITI
17、ON, OCTOBER 2010EFFECTIVE DATE: APRIL 1, 2011ERRATA 1, JANUARY 2011ERRATA 2, NOVEMBER 2011ERRATA 3, JUNE 2013ERRATA 4, AUGUST 2013ERRATA 5, NOVEMBER 2013ERRATA 6, MARCH 2014ERRATA 7, DECEMBER 2014ERRATA 8, JUNE 2016ADDENDUM 1, NOVEMBER 2011ADDENDUM 2, NOVEMBER 2012ADDENDUM 3, MARCH 2013ADDENDUM 4, J
18、UNE 2016CONTAINS API MONOGRAM ANNEX AS PART OF U.S. NATIONAL ADOPTIONISO 10423:2009 (Modified), Petroleum and natural gas industriesDrilling and production equipmentWellhead and christmas tree equipmentSpecification for Wellhead andChristmas Tree EquipmentUpstream SegmentANSI/API SPECIFICATION 6ATWE
19、NTIETH EDITION, OCTOBER 2010EFFECTIVE DATE: APRIL 1, 2011ERRATA 1, JANUARY 2011ERRATA 2, NOVEMBER 2011ERRATA 3, JUNE 2013ERRATA 4, AUGUST 2013ERRATA 5, NOVEMBER 2013ERRATA 6, MARCH 2014ERRATA 7, DECEMBER 2014ERRATA 8, JUNE 2016ADDENDUM 1, NOVEMBER 2011ADDENDUM 2, NOVEMBER 2012ADDENDUM 3, MARCH 2013A
20、DDENDUM 4, JUNE 2016CONTAINS API MONOGRAM ANNEX AS PART OF U.S. NATIONALADOPTIONISO 10423:2009 (Modified), Petroleum and natural gasindustriesDrilling and production equipmentWellhead and christmas tree equipmentSpecial NotesAPI publications necessarily address problems of a general nature. With res
21、pect to particular circumstances, local,state, and federal laws and regulations should be reviewed.Neither API nor any of APIs employees, subcontractors, consultants, committees, or other assignees make anywarranty or representation, either express or implied, with respect to the accuracy, completen
22、ess, or usefulness of theinformation contained herein, or assume any liability or responsibility for any use, or the results of such use, of anyinformation or process disclosed in this publication. Neither API nor any of APIs employees, subcontractors,consultants, or other assignees represent that u
23、se of this publication would not infringe upon privately owned rights.API publications may be used by anyone desiring to do so. Every effort has been made by the Institute to assure theaccuracy and reliability of the data contained in them; however, the Institute makes no representation, warranty, o
24、rguarantee in connection with this publication and hereby expressly disclaims any liability or responsibility for loss ordamage resulting from its use or for the violation of any authorities having jurisdiction with which this publication mayconflict.API publications are published to facilitate the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- APISPEC6A2010SPECIFICATIONFORWELLHEADANDCHRISTMASTREEEQUIPMENTTWENTIETHEDITIONINCORPORATINGERTA1JANUARY2011ADDENDUM1NOVEMBER2011ERTA2NOVEMBER2011ADDENDUMPDF

链接地址:http://www.mydoc123.com/p-400100.html