API PUBL 341-1998 Survey of Diked-Area Liner Use at Aboveground Storage Tank Facilities《地面储罐设施护拦区衬垫使用调查》.pdf
《API PUBL 341-1998 Survey of Diked-Area Liner Use at Aboveground Storage Tank Facilities《地面储罐设施护拦区衬垫使用调查》.pdf》由会员分享,可在线阅读,更多相关《API PUBL 341-1998 Survey of Diked-Area Liner Use at Aboveground Storage Tank Facilities《地面储罐设施护拦区衬垫使用调查》.pdf(30页珍藏版)》请在麦多课文档分享上搜索。
1、A Survey of Diked-Area Liner Use at Aboveground Storage Tank Facilities Health i Environmental Affairs Department Publication Number 341 February 1998 STD.API/PETRO PUBL 341-ENGL 1978 = 0732270 0605!i74 bbl American Petroleum Institute -b- American Petroleum Institute Environmental, Health, and Safe
2、ty Mission and Guiding Principles MISSION The members of the American Petroleum institute are dedicated to continuous efforts to improve the compatibility of our operations with the environment while economically developing energy resources and supplying high quality products and services to consume
3、rs. We recognize our responsibility to work with the public, the government, and others to develop and to use natural resources in an environmentally sound manner while protecting the health and safety of our employees and the public. To meet these responsibilities, API members pledge to manage our
4、businesses according io the following principles using sound science to prioritize risks and to implement cost-effective management practices: PRINCIPLES e e e To recognize and to respond to community concerns about our raw materials, products and operations. To operate our plants and facilities, an
5、d to handle our raw materials and products in a manner that protects the environment, and the safety and health of our employees and the public. To make safety, health and environmental considerations a priority in our planning, and our development of new products and processes. To advise promptly,
6、appropriate officials, employees, customers and the public of information on significant industry-related safety, health and environmental hazards, and to recommend protective measures. To counsel customers, transporters and others in the safe use, transportation and disposal of our raw materials, p
7、roducts and waste materials. To economically develop and produce natural resources and to conserve those resources by using energy efficiently. To extend knowledge by conducting or supporting research on the safety, health and environmental effects of our raw materials, products, processes and waste
8、 materials. To commit to reduce overall emission and waste generation. To work with others to resolve problems created by handling and disposal of hazardous substances from our operations. To participate with government and others in creating responsible laws, regulations and standards to safeguard
9、the community, workplace and environment. To promote these principles and practices by sharing experiences and offering assistance to others who produce, handle, use, transport or dispose of similar raw materials, petroleum products and wastes. STD*API/PETRO PUBL 341-ENGL 1998 0732210 Ob05475 5T8 =
10、A Survey of Diked-Area Liner Use at Aboveground Storage Tank Facilities Health and Environmental Affairs Department API PUBLICATION NUMBER 341 PREPARED UNDER CONTRACT BY: JOSEPH S. BURKE SPEC CONSULTING SERVICES 427 CLIFTON CORPORATE DRIVE PO Box 912 CLIFTON PARK, NEW YORK 12065 FEBRUARY 1998 Americ
11、an Petroleum Institute I STD-APIIPETRO PUBL 341-ENGL L778 S 0732270 Ub0547b 439 S FOREWORD API PUBLICATIONS NECESSARILY ADDRESS PROBLEMS OF A GENERAL NATURE. WITH RESPECT TO PARTICULAR CIRCUMSTANCES, LOCAL, STATE, AND FEDERAL LAWS AND REGULATIONS SHOULD BE REVIEWED. API IS NOT UNDERTAKING TO MEET TH
12、E DUTIES OF EMPLOYERS, MANUFAC- TURERS, OR SUPPLIERS TO WARN AND PROPERLY TRAIN AND EQUIP THEIR EMPLOYEES, AND OTHERS EXPOSED, CONCERNING HEALTH AND SAFETY RISKS AND PRECAUTIONS, NOR UNDERTAKING THEIR OBLIGATIONS UNDER LOCAL, STATE, OR FEDERAL LAWS. NOTHING CONTAINED IN ANY API PUBLICATION IS TO BE
13、CONSTRUED AS GRANTING ANY RIGHT, BY IMPLICATION OR OTHERWISE, FOR THE MANU- FACTURE, SALE, OR USE OF ANY METHOD, APPARATUS, OR PRODUCT COV- ERED BY LETTERS PATENT. NEITHER SHOULD ANYTHING CONTAINED IN ITY FOR INFRINGEMENT OF LETERS PATENT. THE PUBLICATION BE CONSTRUED AS INSURING ANYONE AGAINST LIAB
14、IL- All rights reserved. No part of this work may be reproduced, stored in a retrieval system, or transmitted by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior written permission from the publisher. Contact the publisher; API Publishing Services. 1220 L Stree
15、r, N. W. Washington, D.C. 20005. Copyright O 1998 American Petroleum Institute iii STD-APIIPETRO PUBL 3YL-ENGL 1718 II 0732270 Db05Y77 370 i ACKNOWLEDGMENTS THE FOLLOWING PEOPLE ARE RECOGNIZED FOR THEIR CONTRIBUTIONS OF TIME AND EXPERTISE DURING THIS STUDY AND IN THE PREPARATION OF THIS REPORT: MI S
16、TAFF CONTACT F. Dee Gavora, Health and Environmental Affairs Department MEMBERS OF THE STORAGE TANK TASK FORCE SUBCOMMITIEE Jerry Boldra, Shell Oil Company Jerry Engelhardt, Santa Fe Pacific Pipeline Company Gerald L. Garteiser, Exxon Company Don Gilson, Chevron Products Company Gary Henmann, Marath
17、on Oil Company Ken Lloyd, Citgo Pipeline Company William Martin, ARCO Products Company Eugene P. Milunec, Mobil Oil Corporation James Moore, Amoco Oil Company Philip Myers, Chevron Products Company James Stevenson, Phillips Pipeline Company John Thomas, Shell Oil Company I STD-API/PETRO PUBL 391-ENG
18、L 11478 = 0732270 Ub05478 207 m TABLE OF CONTENTS Section EXECUTIVE SUMMARY . 1 INTRODUCTION .3 BACKGROUND .3 SURVEY FINDINGS 4 Liner System Effectiveness . .4 Reliability .4 . Effectiveness in Containing Releases . .6 Effect on Facility Operations . 6 Preferred Approaches to Release Prevention .7 E
19、PA LINER STUDY . 8 CONCLUSIONS . .9 REFERENCES R- 1 APPENDIX A SURVEY QUESTIONNAIRE RESULTS A- 1 APPENDIX B LIQUID RELEASE PREVENTION AND DETECTION MEASURES FOR ABOVEGROUND STORAGE TANK FACILITIES EXECUTIVE SUMMARY . B- 1 STD.API/PETRO PUBL 34L-ENGL 1198 E 073C270 OLU5479 Li3 E 1 Table 1 2 A- 1 A-2
20、A-3 A-4A A-4B A-5 A-6 A-7 A-8A A-8B A-9 A-10 A-1 1 A-12 A-13 A-14 A-1 5 A-16 A-17 A-18 A-19 A-20 A-2 1 A-22 A-23 LIST OF FIGURES Pane Major Causes of Liner Failure 5 LIST OF TABLES Page Location of Responding Facilities 7 Diked-Area Liner Installed Costs . 9 Retrofit vs . New Facilities A- 1 Product
21、s Stored . A-1 Sectors Reporting A-2 Area Covered A-2 Included Lined Area A-2 Year of Liner Installation A-3 Reason for Liner Installation A-3 Type of Liner System Installed . A-3 Liner Cover Material . A-4 Depth of Cover Material . A-4 Reason for Selection . A-4 Liner Design Permeability A-5 Meets
22、Design Objectives A-5 Nature of Problems . A-6 Liner Impact on Facility Operation . A-6 Types of Operational Problems A-7 Liner Effects on Storm Water Management . A-7 Inspection of Liner System . A-8 Method of Periodic Inspection of Liner A-8 Has a Release Occurred? . A-8 Type of Release Experience
23、d A-9 Did Liner Prevent Release to Soil or Groundwater? . A-9 Confirmation of Liner Performance A-9 Better Approaches to Liners . A-10 Alternate Approaches Available . A- 10 STD-API/PETRO PUBL 3LiL-ENGL 1998 M fl732270 Ob05480 9b5 i EXECUTIVE SUMMARY i In 1997, the American Petroleum Institute (API)
24、 conducted a survey on the use of diked- area liners around aboveground storage tanks. The data indicate that the effectiveness of liners in protecting the environment is limited because liner systems frequently fail. Further, the resulting data indicate that there are few releases from aboveground
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- APIPUBL3411998SURVEYOFDIKEDAREALINERUSEATABOVEGROUNDSTORAGETANKFACILITIES 地面 设施 护拦区 衬垫 使用 调查 PDF

链接地址:http://www.mydoc123.com/p-399746.html