1、Guide to Placing Concrete by Pumping Methods Reported by ACI Committee 304 ACI 304.2R-17First Printing October 2017 ISBN: 978-1-945487-82-8 Guide to Placing Concrete by Pumping Methods Copyright by the American Concrete Institute, Farmington Hills, MI. All rights reserved. This material may not be r
2、eproduced or copied, in whole or part, in any printed, mechanical, electronic, film, or other distribution and storage media, without the written consent of ACI. The technical committees responsible for ACI committee reports and standards strive to avoid ambiguities, omissions, and errors in these d
3、ocuments. In spite of these efforts, the users of ACI documents occasionally find information or requirements that may be subject to more than one interpretation or may be incomplete or incorrect. Users who have suggestions for the improvement of ACI documents are requested to contact ACI via the er
4、rata website at http:/concrete.org/Publications/ DocumentErrata.aspx. Proper use of this document includes periodically checking for errata for the most up-to-date revisions. ACI committee documents are intended for the use of individuals who are competent to evaluate the significance and limitation
5、s of its content and recommendations and who will accept responsibility for the application of the material it contains. Individuals who use this publication in any way assume all risk and accept total responsibility for the application and use of this information. All information in this publicatio
6、n is provided “as is” without warranty of any kind, either express or implied, including but not limited to, the implied warranties of merchantability, fitness for a particular purpose or non-infringement. ACI and its members disclaim liability for damages of any kind, including any special, indirec
7、t, incidental, or consequential damages, including without limitation, lost revenues or lost profits, which may result from the use of this publication. It is the responsibility of the user of this document to establish health and safety practices appropriate to the specific circumstances involved w
8、ith its use. ACI does not make any representations with regard to health and safety issues and the use of this document. The user must determine the applicability of all regulatory limitations before applying the document and must comply with all applicable laws and regulations, including but not li
9、mited to, United States Occupational Safety and Health Administration (OSHA) health and safety standards. Participation by governmental representatives in the work of the American Concrete Institute and in the development of Institute standards does not constitute governmental endorsement of ACI or
10、the standards that it develops. Order information: ACI documents are available in print, by download, on CD-ROM, through electronic subscription, or reprint and may be obtained by contacting ACI. Most ACI standards and committee reports are gathered together in the annually revised ACI Manual of Con
11、crete Practice (MCP). American Concrete Institute 38800 Country Club Drive Farmington Hills, MI 48331 Phone: +1.248.848.3700 Fax: +1.248.848.3701 www.concrete.orgThis guide discusses the use of pumps for transporting and placing concrete. Rigid and flexible pipelines, couplings and other acces- sori
12、es, and the various types of concrete pumps are discussed. The importance of proportioning a pumpable concrete mixture is emphasized with reference to sources for further direction on its design. Evaluation of trial mixtures to ensure pumpability and strength is encouraged. Of specific importance is
13、 a discussion on the use of lightweight aggregates. Methods to saturate these aggre- gates and provide a consistent moisture content are discussed. Preconstruction planning for equipment placement and line routing are emphasized. Discussions on achieving a consistent mixture and its critical importa
14、nce are also addressed. Keywords: blockage; boundary layer; concrete pump; coupling; mixture design; pipeline; placing boom; preprimed; pumpability; reverse pumping; valve. CONTENTS CHAPTER 1INTRODUCTION AND SCOPE, p. 2 1.1Introduction, p. 2 1.2Scope, p. 2 CHAPTER 2DEFINITIONS, p. 2 CHAPTER 3PUMPING
15、 CONCRETE, p. 2 3.1Mixture component distribution, p. 2 3.2Disruptions to flow, p. 3 CHAPTER 4PUMPING EQUIPMENT AND COMPONENTS, p. 4 4.1Piston pumps, p. 4 4.2Valve types, p. 4 4.3Trailer pumps, p. 5 4.4Truck-mounted concrete pumps, p. 5 4.5Separate placing booms, p. 6 4.6Specialized equipment, p. 6
16、4.7Pipeline and accessories, p. 6 4.8Flexible system hose types and applications, p. 9 4.9Concrete placing system accessories, p. 9 CHAPTER 5PUMPABLE CONCRETE, p. 11 5.1Basic considerations, p. 11 5.2Normalweight aggregate, p. 11 5.3Lightweight aggregate concrete, p. 12 5.4Water and slump, p. 12 5.5
17、Cementitious materials, p. 14 5.6Admixtures, p. 14 5.7Fiber reinforcement, p. 14 5.8Trial mixtures and pumpability testing, p. 15 5.9Estimating performance, p. 15 Larry G. Leper, Chair ACI 304.2R-17 Guide to Placing Concrete by Pumping Methods Reported by ACI Committee 304 Hakim S. Abdelgader David
18、J. Akers Casimir J. Bognacki David A. Burg Manjit S. Chopra Bernard J. Eckholdt III J. Mitchell Engelstead Michael R. Gardner Daniel J. Green Neil R. Guptill Terence C. Holland Tarek S. Khan Gary R. Mass Larry W. Matejcek Avi A. Mor Mike Murray Dipak T. Parekh James S. Pierce Jorge L. Quiros Jr. Roy
19、ce J. Rhoads James M. Shilstone Jr. Boris Y . Stein Samuel X. Yao Richard Yelton Consulting Member Thomas R. Clapp The committee would like to give special acknowledgement to associate member J. Bury, Chair of the subcommittee that prepared this document, for his considerable contribution to its dev
20、elopment. ACI Committee Reports, Guides, and Commentaries are intended for guidance in planning, designing, executing, and inspecting construction. This document is intended for the use of individuals who are competent to evaluate the significance and limitations of its content and recommendations a
21、nd who will accept responsibility for the application of the material it contains. The American Concrete Institute disclaims any and all responsibility for the stated principles. The Institute shall not be liable for any loss or damage arising therefrom. Reference to this document shall not be made
22、in contract documents. If items found in this document are desired by the Architect/Engineer to be a part of the contract documents, they shall be restated in mandatory language for incorporation by the Architect/Engineer. ACI 304.2R-17 supersedes ACI 304.2R-96 and was adopted and published October
23、2017. Copyright 2017, American Concrete Institute. All rights reserved including rights of reproduction and use in any form or by any means, including the making of copies by any photo process, or by electronic or mechanical device, printed, written, or oral, or recording for sound or visual reprodu
24、ction or for use in any knowledge or retrieval system or device, unless permission in writing is obtained from the copyright proprietors. 1CHAPTER 6FIELD PRACTICES, p. 15 6.1General, p. 15 6.2Pipeline concrete placement, p. 16 6.3Powered boom placement, p. 17 6.4Equipment and operational safety, p.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ACI3042R2017GUIDETOPLACINGCONCRETEBYPUMPINGMETHODSPDF

链接地址:http://www.mydoc123.com/p-1242752.html