1、10-11 32 84 00-1 SECTION 32 84 00 PLANTING IRRIGATION SPEC WRITER NOTE: Delete between /_/ if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies materials and procedu
2、res for furnishing and installing a complete automatically-controlled / lawn / trees / shrub / irrigation system, controllers and all other appurtenances necessary to serve specified landscape and plant bed areas. 1.2 RELATED WORK A. Excavation, Trench Widths, Pipe Bedding, Backfill, Shoring, Sheeti
3、ng, Bracing: Section 31 20 00, EARTH MOVING. B. Concrete Work, Reinforcing, Placement and Finishing: Section 03 30 00, CAST-IN-PLACE CONCRETE. C. General plumbing, protection of Materials and Equipment, and quality assurance: Section 22 05 11, COMMON WORK RESULTS FOR PLUMBING. D. Submittals: Section
4、 01 33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES. E. Plant materials: Section 32 90 00, PLANTING F. Metering: SECTION 25 10 10, ADVANCED UTILITY METERING SYSTEM. 1.3 DEFINITIONS A. Circuit Piping: Downstream from control valves to sprinklers, specialties, and drain valves. B. Drain Piping: Downstr
5、eam from circuit-piping drain valves. C. Main Piping: Downstream from point of connection to water distribution piping to, and including, control valves. D. Low Voltage: As defined in NFPA 70 for circuits and equipment operating at less than 50 volts or for remote-control, signaling power-limited ci
6、rcuits. 1.4 ABBREVIATIONS SPEC WRITER NOTE: Retain abbreviations that remain after this section has been edited. A. FPT: Female pipe thread B. HDPE: high-density polyethylene plastic Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-10-11 32 84 00-2 C.
7、 NPT: National pipe thread D. PTFE: Polytetrafluoroethylene E. PVC: Polyvinyl chloride plastic F. WOG: Water, oil and gas 1.5 PERFORMANCE REQUIREMENTS A. Irrigation zone control shall be automatic operation with controller and automatic control valves. B. Location of sprinklers and specialties on Dr
8、awings is approximate. Contractor to make minor adjustments necessary to avoid plantings and obstructions such as signs, utilities and light standards. Provide 100 percent irrigation coverage of areas indicated. C. Delegated Design: Provide a 100 percent coverage irrigation system, including compreh
9、ensive engineering analysis by a qualified professional engineer, using performance requirements and design criteria indicated. D. Minimum Working Pressures: The following are maximum pressure requirements for piping, valves and specialties unless otherwise indicated. 1. Irrigation Main Piping: / 10
10、0 psi (640 kPa) / Insert Value / 2. Circuit Piping: / 80 psi (520 kPa) / Insert Value / 1.6 DELIVERY, STORAGE, AND HANDLING A. Deliver piping with factory-applied end caps. Maintain end caps through shipping, storage, and handling to prevent pipe-end damage and to prevent entrance of dirt, debris, a
11、nd moisture. B. Store plastic piping protected from direct sunlight. Support pipe to prevent sagging and bending. 1.7 QUALITY ASSURANCE: A. Products Criteria: 1. When two or more units of the same type or class of materials or equipment are required, these units shall be products of one manufacturer
12、. 2. A nameplate bearing manufacturers name or trademark, including model number, shall be securely affixed in a conspicuous place on equipment. In addition, the model number shall be either cast integrally with equipment, stamped, or otherwise permanently marked on each item of equipment. B. Instal
13、ler Certification: 1. Installer should be an employer of workers that include a / certified irrigation designer qualified by The Irrigation Association Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-10-11 32 84 00-3 / Professional Class member of th
14、e American Society of Irrigation Consultants / Professional Technical Class member of the American Society of Irrigation Consultants / Insert qualifications / to perform specified work., and have provided irrigation installations for / 5 / 10 / Insert value / years. 2. Service provider qualification
15、s shall be maintained and/or trained by the manufacturer to render satisfactory service within 8 hours of service request notification. C. System Requirements: 1. 100 percent irrigation coverage of specified areas is required. The Contractor shall, at no additional cost to the Government, make minor
16、 adjustments necessary to avoid plantings and obstructions such as signs, utilities and light standards and achieve full and complete coverage of irrigated areas without overspray on roadways, sidewalks, window wells, or buildings and to protect trees from close high spray velocity. 1.8 SUBMITTALS A
17、. Submit product data as one package for each type of product indicated. Include rated capacities, operating characteristics, electrical characteristics, and furnished specialties and accessories. B. Submit the proposed irrigation system design signed and sealed by the qualified professional enginee
18、r licensed in the State where the project is located and responsible for document preparation. C. Submit complete detailed irrigation layout covering design of system showing pipe sizes and lengths; fittings; locations; types and sizes of sprinklers; controls; backflow preventers; valves; / drainage
19、 pits; / location and mounting details of electrical control equipment / complete wiring diagram showing routes and wire sizes for; power, signal and control wiring details / and connections to water supply main. Do not start work before final shop drawing approval. D. Provide qualification data for
20、: 1. A qualified irrigation Installer. 2. A qualified service provider, maintained and/or trained by the manufacturer to render satisfactory service within 8 hours of service request notification. E. Include a zone chart and controller timing schedule showing each irrigation zone and its control val
21、ve; and show the time settings for each automatic controller zone. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-10-11 32 84 00-4 F. Provide operation and maintenance data for / sprinklers / controllers / and / automatic control valves / other / to
22、 include in operation and maintenance manuals. 1.9 EXTRA MATERIALS A. Furnish extra materials, as called out below, that match products installed and that are packaged with protective covering for storage and identified with labels describing contents. 1. / Rotary and Spray Head Sprinklers / Bubbler
23、s / Emitters /: / 5 / Insert number / percent of amount installed for each type and size indicated, but no fewer than 2 units. 2. / Drip-tube system tubing / Soaker Tubes /: / Insert percent / of total length installed for each type and size indicated, but not less than / 50 feet (15 m) / 100 feet (
24、30 m) / Insert value /. 1.10 APPLICABLE PUBLICATIONS SPEC WRITER NOTE: Based on project design for local conditions, delete references not applicable for project. A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA3284002011PLANTINGIRRIGATIONPDF