VA 09 06 00-2011 SCHEDULE FOR FINISHES.pdf
《VA 09 06 00-2011 SCHEDULE FOR FINISHES.pdf》由会员分享,可在线阅读,更多相关《VA 09 06 00-2011 SCHEDULE FOR FINISHES.pdf(66页珍藏版)》请在麦多课文档分享上搜索。
1、10-11 09 06 00 - i SECTION 09 06 00 SCHEDULE FOR FINISHES SECTION 09 06 00-SCHEDULE FOR FINISHES VAMC: Location: Project no. and Name: Submission Date: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-10-11 09 06 00 - ii INSTRUCTIONS FOR PREPARATON OF
2、 SECTION 09 06 00-SCHEDULE FOR FINISHES GENERAL: Use, SECTION 09 06 00, SCHEDULE FOR FINISHES as a master format for construction projects, to identify interior and exterior material finishes for type, texture, patterns, color and placement. Fully coordinate with other VA master construction specifi
3、cation sections for information, abbreviations and symbols contained in this Section to be consistent and fully coordinated with those in drawings, finish schedules and material boards. Provide dimensions in metric followed by English equivalent in parenthesis, when applicable. Slash symbol (/ /) Ed
4、it information contained between these symbols for project or delete if not applicable. These are not always used. Delete pages SECTION 09 06 00, SCHEDULE FOR FINISHES-i, ii, iii from final document. Submit complete master document that you received with edit marks during Design Development and Cons
5、truction Document stage of project. Provide a re-typed version for final document. Coordinate with VA handbook H-08-14, Room Finishes, Door and Hardware Schedule. Explanation of Terms: Material Abbreviations: Use in Room Finish Schedule to identify Finish Materials. Example: GWB-W is Gypsum Wall Boa
6、rd- Vinyl coated fabric wallcovering finish surface. Pain, Stain, or Coating Code and Finish Code: A number or abbreviation you assign for material color system texture and pattern in conjunction with a manufacturers identification when applicable. Instructions for Part I General Copy following para
7、graphs as stated: 1.1 DESCRIPTION, 1.2 MANUFACTURERS, 1.3 SUBMITTALS. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-10-11 09 06 00 - iii Paragraph 1.5 Digital Color Photos Interior Views: Include a series of photographic slides, representing a sequ
8、ential walk-through. Show typical public, patient, staff and all specialized areas. The photography is of architectural quality and are the property of the Department of Veterans Affairs, Office of Facility Management. Instruction for Part II Products Interior and Exterior Edit outline to suit the p
9、roject. The outline is divided by technical specification section and list items requiring finish selections. Locations are designated either in room finish schedule in this section or shown on drawings. Some products are listed for which a VA guide specifications is not available; no technical Sect
10、ion number shown, Section will have to be written. Identify locations for products not shown in Room Finish Schedule. Some items require identification of room number and name to establish location. Identify color, texture, patterns as applicable with manufacturers identification label with a produc
11、t or abbreviations are identified throughout drawings and specification sections. Coordinate for uniformity and consistency. Do not duplicate abbreviations for different materials. Avoid conflicts with technical specification sections. Example; Vinyl Composition Tile (VCT). Some Sections specify fin
12、ish on product and are not included in Part II, i.e. 10350, FLAGPOLES. Whenever possible minimize use of multiple manufacturers for colors and ones which constitute large quantities such as paint, plastic, laminate and carpet. Loose items are not permitted in construction contracts unless an integra
13、l component of a fixed item i.e. keys for locks, adjustable shelves in cabinets. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-10-11 09 06 00 - iv Give preference to products containing recovered materials when price performance and availability me
14、ets project requirements. Give sizes in metric followed by English in parenthesis, i.e. 100 mm (4 inches). Instructions for Part III Execution Paragraph 3.1 a: Finish Schedules and Miscellaneous Abbreviations-provide a complete list of product abbreviations used on project. Edit list to suit project
15、. Paragraph 3.1 b: Finish Schedule Symbols: Edit symbol list to suit project. Paragraph 3.2: Room Finish Schedule- Finish schedule format is contained in architectural package or at end of this Section. Surface for walls “C” is for free standing columns. Finish Plans: these plans are a part of archi
16、tectural drawing set as an adjunct to the finish schedule. Use for showing wall, ceiling and floor patterns and identifying stopping and starting points for finishes exterior elevations may be used to show locations of various finishes identified by finish code and materials. Provided by IHSNot for
17、ResaleNo reproduction or networking permitted without license from IHS-,-,-10-11 09 06 00 - 1 SECTION 09 06 00 SCHEDULE FOR FINISHES DESIGNER NOTE: Delete between /. / if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the document. PART
18、I GENERAL 1.1 DESCRIPTION This section contains a coordinated system in which requirements for materials specified in other sections shown are identified by abbreviated material names and finish codes in the room finish schedule or shown for other locations. 1.2 MANUFACTURERS Manufacturers trade nam
19、es and numbers used herein are only to identify colors, finishes, textures and patterns. Products of other manufacturers equivalent to colors, finishes, textures and patterns of manufacturers listed that meet requirements of technical specifications will be acceptable upon approval in writing by con
20、tracting officer for finish requirements. 1.3 SUBMITALS Submit in accordance with SECTION 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES provide quadruplicate samples for color approval of materials and finishes specified in this section. DESIGNER NOTE: See instructions. 1. DIGITAL COLOR PHOTOS-
21、INTERIOR VIEWS: Room Number and Name Item/View to be Photographed 1. 2. 3. 4. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-10-11 09 06 00 - 2 DESIGNER NOTE: Update Applicable Publications to correct issue at time of project specification preparati
22、on. 1.4 APPLICABLE PUBLICATIONS A. Publications listed below form a part of this specification to the extent referenced. Publications are referenced in text by basic designation only. B. MASTER PAINTING INSTITUTE: (MPI) 2001 . Architectural Painting Specification Manual PART 2- PRODUCTS 2.1 DIGITAL
23、COLOR PHOTOS A. Size 24 x 35 mm. B. Labeled for: 1. Building name and Number. 2. Room Name and Number. 2.2 DIVISION 31 - EARTHWORK A. SECTION 32 31 13, CHAIN LINK FENCES AND GATES Finish Chain Link Fabric Finish Posts and Rails Manufacturer Mfg. Color Name/No. Coated Galvanized Painted (P) B. SECTIO
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA0906002011SCHEDULEFORFINISHESPDF