VA 08 17 10-2012 INTEGRATED DOOR ASSEMBLIES.pdf
《VA 08 17 10-2012 INTEGRATED DOOR ASSEMBLIES.pdf》由会员分享,可在线阅读,更多相关《VA 08 17 10-2012 INTEGRATED DOOR ASSEMBLIES.pdf(13页珍藏版)》请在麦多课文档分享上搜索。
1、03-01-12 08 17 10-1 SECTION 08 17 10 INTEGRATED DOOR ASSEMBLIES SPEC WRITER NOTE: Delete between / - / if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. PART 1 - GENERAL 1.1 DESCRIPTION A. Work in this section includes in
2、tegrated door opening systems including metal frame, integrated doors, hanging device, latching mechanism and associated finish hardware, unless specified elsewhere. B. Smoke and draft control seals shall be included in this section, unless specifically listed elsewhere. C. All glass and glazing are
3、 not covered in this section. 1.2 RELATED WORK A. Blocking for Hardware: Section 06 10 00, ROUGH CARPENTRY. B. Key Cylinders: Section 08 71 00, DOOR HARDWARE C. Auto Door Operators: Section 08 71 13, AUTOMATIC DOOR OPERATORS /Section 08 71 13.11, LOW ENERGY DOOR OPERATORS. D. Painting: Section 09 91
4、 00, PAINTING. E. Card Readers: Section 28 13 11, PHYSICAL ACCESS CONTROL SYSTEMS. F. Electrical: Division 26, ELECTRICAL. G. Fire Detection: Section 28 31 00, FIRE DETECTION AND ALARM. 1.3 QUALITY ASSURANCE A. Hardware shall be installed by people knowledgeable and skilled in the application, insta
5、llation and adjustment of commercial grade doors and door hardware. Doors and Frames must be installed plumb, square and level. B. Doors frames must be properly prepared and reinforced to install hardware per the manufacturers template and installation instructions. Install door frames in accordance
6、 with ANSI/SDI A250.11 “Recommended Erection Instructions for Steel Frames.” C. Contractor shall provide and furnish screws, bolts, expansions shields or other fasteners to facilitate the proper installation of products, not furnished as part of the Integrated Door Assembly. 1.4 WARRANTY A. Provide
7、manufacturers standard five-year limited warranty against defects in material and workmanship unless noted otherwise. 1. Door Closers: 10 years Provided by IHSNot for Resale-,-,-03-01-12 08 17 10-2 2. Steel Pinned Continuous Hinges: 10 years 1.5 SUBMITTALS A. Submit shop drawings with proposed Integ
8、rated Door Assembly system, product and hardware options, in a timely manner to obtain the approval from architect in time to meet construction schedule of other trades. B. Provide for each door an frame location; frame type, profile, and installation details, items of finish hardware accessories, f
9、inishes, degree of opening and electrical rough-in requirements. Submit required templates to door and frame manufacturers to enable proper and accurate sizing and locations of hardware. C. Samples: Provide physical samples as required by Section 01 33 23. D. Provide Owner Manual, instruction sheets
10、 and installation. 1.6 DELIVERY, STORAGE AND HANDLING A. Integrated Door Assembly systems shall be delivered to the general contractor at the job site complete with necessary screws, miscellaneous parts, instructions, and installation templates. Each package shall be legibly and properly labeled to
11、correspond to the approved door schedule. B. Deliver Integrated Door Assembly system to project site. Contractor will jointly check in hardware with representatives of the supplier to verify shipment is correct and / or note and rectify discrepancies promptly. C. Furnish door assemblies with flush o
12、perating hardware flush with door skin, using protective wrappings and protective spacers between projecting hardware. Maintain and protect door assemblies using cardboard spacers and protective edge guards along the door edges, to reduce exposure to marring or damage during storage. D. Store door a
13、ssemblies in a dry and secure area. Storage area shall be void of any excess humidity that can cause damage to the product. 1.7 APPLICABLE PUBLICATIONS A. The following references established standards for architectural hardware as specified in this section. B. American National Standards Institute
14、(ANSI) ICC/ANSI A117.1-2003 . Accessible and Usable Buildings and Facilities ANSI/BHMA A156.1-2006 Butts and Hinges ANSI/BHMA A156.3-2008 Exit Devices ANSI/BHMA A156.4-2008 Door Controls - Closers Provided by IHSNot for Resale-,-,-03-01-12 08 17 10-3 ANSI/BHMA A156.5-2001 Auxiliary Locks and Associa
15、ted Products ANSI/BHMA A156.6-2005 Architectural Door Trim ANSI/BHMA A156.7-2009 Template Hinge Dimensions ANSI/BHMA A156.8-2005 Door Controls - Overhead Holders ANSI/BHMA A156.10-2005 . Power Operated Pedestrian Doors ANSI/BHMA A156.13-2002 . Mortise Locks and Latches ANSI/BHMA A156.15-2006 . Close
16、r Holder Release Devices ANSI/BHMA A156.16-2008 . Auxiliary Hardware ANSI/BHMA A156.18-2006 . Materials and Finishes ANSI/BHMA A156.19-2007 . Power Assist and Low Energy Power Operated Doors ANSI/BHMA A156.21-2009 . Thresholds ANSI/BHMA A156.22-2005 . Door Gasketing Systems ANSI/BHMA A156.23-2004 .
17、Electromagnetic Locks ANSI/BHMA A156.24-2003 . Delayed Egress Locking Systems ANSI/BHMA A156.25-2007 . Electrified Locking Devices ANSI/BHMA A156.26-2006 . Continuous Hinges ANSI/BHMA A156.28-2007 . Master Keying Systems ANSI/BHMA A156.29-2007 . Exit Locks and Alarms ANSI/BHMA A156.30-2003 . High Se
18、curity Cylinders ANSI/BHMA A156.31-2007 . Electric Strikes and Frame Mounted Actuators ANSI/BHMA A156.32-2008 . Integrated Door Opening Assemblies ANSI/SDI A250.4-2001 . Test Procedure and Acceptance Criteria for Physical Evidence for Steel Doors, Frames, Frame Anchors and Reinforcings ANSI/SDI A250
19、.8-2003 . Recommended Specifications for Standard Steel Doors and Frames ANSI/SDI A250.11-2001 Recommended Erection Instructions for Steel Frames UL10C-2009 . Positive Pressure Fire Tests of Door Assemblies C. American Society for Testing and Materials (ASTM) 1. ASTM E2074 (2000): Standard Test Meth
20、od for Fire Tests of Door Assemblies 2. ASTM E2180 (2007): Standard Test Method for Determining the Activity of Incorporated Antimicrobial Agent(s) In Polymeric or Hydrophobic Materials Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS03-01-12 08 17 10-4 3
21、. ASTM F476 (2002): Standard Test Method for Security of Swinging Door Assemblies D. Door and Hardware Institute (DHI) 1. Recommended Locations for Builders Hardware for Standard Doors and Frames (2004) 2. Recommended Locations for Builders Hardware for Custom Steel Doors and Frames (1996) E. Metal
22、Door and Frame Associations 1. Hollow Metal Manufacturing Association (HMMA) a. National Association of Architectural Metal Manufacturers (NAAMM) 2. Steel Door Institute (SDI) F. Approved Testing Laboratories 1. Underwriters Laboratories, Inc. (UL) a. UL305 (2007): Panic Hardware b. UL1784 (2004): A
23、ir Leakage Tests of Door Assemblies 2. ITS / Intertek Testing Services / Warnock Hersey Inc. G. National Fire Protection Association (NFPA) 1. NFPA 70-2008: National Electrical Code 2. NFPA 80-2010: Standard for Fire Doors and Other Opening Protectives 3. NFPA 101-2009: Life Safety Code 4. NFPA 105-
24、2010: Standard for Installation of Smoke Door Assemblies and Other Opening Protectives 5. NFPA 252-2008: Standard Methods of Fire Tests of Door Assemblies H. Building Codes Applicable Building Code 1. 2009 International Building Code 2. All hardware shall comply with UFAS, (Uniform Federal Accessibl
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA0817102012INTEGRATEDDOORASSEMBLIESPDF
