UL SUBJECT 879B-2002 OUTLINE OF INVESTIGATION FOR POLYMERIC ENCLOSURE SYSTEMS FOR THE SPLICE BETWEEN NEON TUBING ELECTRODE LEADS AND GTO CABLE AND THE GTO CABLE LEADING TO THE SPLI_1.pdf
《UL SUBJECT 879B-2002 OUTLINE OF INVESTIGATION FOR POLYMERIC ENCLOSURE SYSTEMS FOR THE SPLICE BETWEEN NEON TUBING ELECTRODE LEADS AND GTO CABLE AND THE GTO CABLE LEADING TO THE SPLI_1.pdf》由会员分享,可在线阅读,更多相关《UL SUBJECT 879B-2002 OUTLINE OF INVESTIGATION FOR POLYMERIC ENCLOSURE SYSTEMS FOR THE SPLICE BETWEEN NEON TUBING ELECTRODE LEADS AND GTO CABLE AND THE GTO CABLE LEADING TO THE SPLI_1.pdf(20页珍藏版)》请在麦多课文档分享上搜索。
1、October 22, 20021SUBJECT 879BOUTLINE OF INVESTIGATIONFORPOLYMERIC ENCLOSURE SYSTEMS FOR THE SPLICE BETWEEN NEONTUBING ELECTRODE LEADS AND GTO CABLE, AND THE GTO CABLELEADING TO THE SPLICEIssue Number: 1OCTOBER 22, 2002COPYRIGHT 2002 UNDERWRITERS LABORATORIES INC.OCTOBER 22, 2002SUBJECT 879B2No Text
2、on This PageCONTENTSFOREWORD 4INTRODUCTION1 Scope .5CONSTRUCTION2 General 53 Systems for Dry and Damp Locations Only 63.1 Ratings 63.2 Markings 63.3 Installation instructions 64 Systems For Dry, Damp and Wet Locations 74.1 Ratings 74.2 Marking .74.3 Installation instructions 7PERFORMANCE5 Test for S
3、ystems for Dry and Damp Locations Only .85.1 Retention test 86 Tests for Systems for Dry, Damp and Wet Locations 86.1 As received dielectric voltage withstand test for systems with straight through style neonelectrode boots .86.2 As received dielectric voltage withstand test for systems with double
4、back style neonelectrode boots .96.3 Material conditioning 96.4 Dielectric voltage withstand test after conditioning .146.5 Ozone, UV, heat and moisture test 146.6 As received rain and electric discharge test .186.7 Electrostatic field material test 196.8 Retention test straight through and double b
5、ack style neon electrode boots .20OCTOBER 22, 2002 SUBJECT 879B 3FOREWORDA. This Outline of Investigation contains basic requirements for products covered by UnderwritersLaboratories Inc. (UL) under its Follow-Up Service for this category within the limitations given below andin the Scope section of
6、 this Outline of Investigation. They are subject to revision as further experience andinvestigation may show is necessary or desirable.B. The observance of these requirements by a manufacturer is one of the conditions of the continuedcoverage of the manufacturers product.C. A product which complies
7、with the text of this Outline of Investigation will not necessarily be judged tocomply with the Outline of Investigation if, when examined and tested, it is found to have other featureswhich impair the level of safety contemplated by these requirements.D. A product that contains features, characteri
8、stics, components, materials, or systems new or differentfrom those covered by the requirements in this Outline of Investigation, and that involves a risk of fire orof electric shock or injury to persons shall be evaluated using appropriate additional component andend-product requirements to maintai
9、n the level of safety as originally anticipated by the intent of thisOutline of Investigation. A product whose features, characteristics, components, materials, or systemsconflict with specific requirements or provisions of this Outline of Investigation does not comply with thisOutline of Investigat
10、ion. Revision of requirements shall be proposed and adopted in conformance with themethods employed for development, revision, and implementation of this Outline of Investigation.E. UL, in performing its functions in accordance with its objectives, does not assume or undertake todischarge any respon
11、sibility of the manufacturer or any other party. The opinions and findings of ULrepresent its professional judgement given with due consideration to the necessary limitations of practicaloperation and state of the art at the time the Outline of Investigation is processed. UL shall not beresponsible
12、to anyone for the use of or reliance upon this Outline of Investigation by anyone. UL shall notincur any obligation or liability for damages, including consequential damages, arising out of or inconnection with the use, interpretation of, or reliance upon this Outline of Investigation.F. Many tests
13、required by the Outline of Investigations of UL are inherently hazardous and adequatesafeguards for personnel and property shall be employed in conducting such tests.OCTOBER 22, 2002SUBJECT 879B4INTRODUCTION1 Scope1.1 This outline of investigation covers the evaluation of polymeric enclosure systems
14、 that enclose thesplice between neon tubing electrode leads and a GTO cable and the GTO cable leading to the splice.1.2 These products are only covered as systems consisting of a neon electrode boot and GTO cable withintegral sleeve. This outline of investigation does not cover individual component
15、parts of a system.CONSTRUCTION2 General2.1 The neon electrode boot shall have been evaluated and found suitable for the application.2.2 The GTO cable with integral sleeve shall comply with the requirements in the Standard for Safety forGas-Tube-Sign and Ignition Cable, UL 814.2.3 The material used s
16、hall be a minimum of 0.559 mm (0.022 inches) thick.2.4 The over surface and through air spacing for a neon electrode boot shall be a minimum of 38.1 mm(1.5 inches) from the intended point of splice connection to the outer edge of the neon electrode boot inany direction.2.5 The insulating properties
17、of materials provided in the system which are relied upon to insulate,enclose and maintain water tight integrity, shall continue to act in these capacities after being subjectedto the required environmental conditions and tests. Continued compliance is to be determined bycompliance with the dielectr
18、ic voltage withstand test and examination for moisture that may have migratedto the interior parts of the enclosure system, as specified in this Outline of Investigation.2.6 Materials used in enclosure systems shall have been evaluated in accordance with the Standard forSafety for Polymeric Material
19、s Use in Electrical Equipment Evaluations, UL 746C. Materials notpreviously evaluated shall be subjected to Differential Scanning Calorimetry (DSC), Qualitative InfraredAnalysis (IR) and Thermogravimetric Analysis (TGA) for purposes of identification.2.7 Materials shall have a relative temperature i
20、ndex of a minimum of 105C (221F) and/or comply withthe temperature aging conditioning specified in 6.3.3.2.8 Materials shall have a flammability rating of a minimum of 5VA or be determined to meet thisflammability rating by the end of product testing in accordance with the Standard for Safety for Po
21、lymericMaterials Use in Electrical Equipment Evaluations, UL 746C. End product flammability determination inaccordance with the Standard for Safety for Polymeric Materials Use in Electrical EquipmentEvaluations, UL 746C shall be conducted after ultraviolet radiation and temperature conditioning.2.9
22、Materials shall have a CTI rating or be tested to comply with a PLC of 2 or less.OCTOBER 22, 2002 SUBJECT 879B 52.10 Specimens in the natural and in the most heavily pigmented light and dark colors are to be provided.These are considered representative of the color range when test results are essent
23、ially the same. Inaddition, a set of specimens is to be provided in the heaviest organic pigment loading, unless the mostheavily pigmented light or dark color includes the highest organic pigment level. When certain colorpigments (for example, red or yellow) are known to affect flammability characte
24、ristics, they are also to beprovided.3 Systems for Dry and Damp Locations Only3.1 Ratings3.1.1 Systems are to be rated 5 kV, 2.5 kV ac to ground; 10 kV, 5 kV ac to ground; or 15 kV, 7.5 kV acto ground. Secondary circuits are to be rated for a maximum of 60 mA and for the diameter of the neontubing w
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ULSUBJECT879B2002OUTLINEOFINVESTIGATIONFORPOLYMERICENCLOSURESYSTEMSFORTHESPLICEBETWEENNEONTUBINGELECTRODELEADSANDGTOCABLEANDTHEGTOCABLELEADINGTOTHESPLI_1PDF

链接地址:http://www.mydoc123.com/p-1069510.html