UFC 3-600-01 CHANGE 1-2009 FIRE PROTECTION ENGINEERING FOR FACILITIES.pdf
《UFC 3-600-01 CHANGE 1-2009 FIRE PROTECTION ENGINEERING FOR FACILITIES.pdf》由会员分享,可在线阅读,更多相关《UFC 3-600-01 CHANGE 1-2009 FIRE PROTECTION ENGINEERING FOR FACILITIES.pdf(132页珍藏版)》请在麦多课文档分享上搜索。
1、UFC 3-600-01 26 September 2006 Change 1, 14 July 2009 UNIFIED FACILITIES CRITERIA (UFC) FIRE PROTECTION ENGINEERING FOR FACILITIES APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-UFC 3-600-01 26 Sep
2、tember 2006 Change 1, 14 July 2009 UNIFIED FACILITIES CRITERIA (UFC) FIRE PROTECTION ENGINEERING FOR FACILITIES Any copyrighted material included in this UFC is identified at its point of use. Use of the copyrighted material apart from this UFC must have the permission of the copyright holder. U.S.
3、ARMY CORPS OF ENGINEERS NAVAL FACILITIES ENGINEERING COMMAND (Preparing Activity) AIR FORCE CIVIL ENGINEER SUPPORT AGENCY Record of Changes (changes are indicated by 1 . /1/) Change No. Date Location 1 14 July 2009 Changes throughout. This UFC supersedes UFC 3-600-01, dated April 2003, and all subse
4、quent changes. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-UFC 6HSWHPEHU200 2FOREWORD an inhabited administrative building being converted to a primary gathering building or billeting; or a non-compliant primary gathering building/billeting being
5、 altered, modernized, modified, rehabilitated, or renovated and converted to billeting/primary gathering building. Definitions of inhabited, uninhabited, primary gather building and billeting are found in UFC 4-010-01 DoD Minimum Antiterrorism Standards For Buildings. 1-3.2.4.2 When any portion of a
6、 building is modified from its current use to that of a mission essential building for one year or more, the building must meet the requirements for new construction. Note: Examples would include a warehouse being converted to an aircraft hangar. 1-3.2.4.3 When any portion of a building is modified
7、from its current use to any other occupancy use for two years or more, the building must meet the requirements for new construction. Changing groups of occupants within the occupancy classification does not constitute an occupancy change. Note: An example of modifying from one occupancy to another w
8、ould include an office building converted to mercantile. An example of changing groups of occupants would include an installation personnel function occupying the office space formally used by an installation contracting function. 1-3.3 Absence of Criteria When a specific application is not covered
9、by the criteria cited in this UFC, follow national building codes, recognized industry standards, and standard engineering practices. In the absence of such technical information, contact the DOD component authority having jurisdiction (refer to paragraph 1-3.6). 1-3.4 Performance-Based Fire Safety
10、Design. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-UFC 3-600-01 26 September 2006 Change 1, 14 July 2009 5 It is permissible that performance-based fire safety design methods be applied to the renovation, restoration, remodeling or modernization
11、 of existing facilities to address the evaluation of a subsystem, system, or complete building when it is not possible to meet the provided prescriptive requirements for new construction. New facilities for which established prescriptive criteria exist, must not be permitted to use performance-based
12、 fire and life safety design methods. The use of performance-based fire safety design methods must only be permitted upon authorization by the DOD component authority having jurisdiction (AHJ) for new mission critical or unique facilities, where the user mandates requirements and objectives that are
13、 not addressed by established prescriptive requirements of national codes or this UFC. Performance-based fire safety design methods must not be used to eliminate required exiting requirements of NFPA 101, nor must it be used to eliminate automatic sprinkler systems required by DOD criteria. 1-3.4.1
14、Application and Use of Performance-Based Fire Safety Design Methods. If performance-based fire safety design is used or permitted by the DOD component AHJ, Appendix D describes the provisions and applicable requirements associated with the fire safety design of DOD facilities. Appendix D is in accor
15、dance with the performance-based option of NFPA 101, Life Safety Code, and the performance-based fire safety design approach of the Society of Fire Protection Engineers (SFPE), Introduction to Performance-Base Fire Safety. A fire protection engineer that meets the requirements of paragraph 1-6 below
16、 must perform the performance-based fire safety design. 1-3.5 Conflicts in Criteria. If a conflict exists between this UFC and any other DOD document, referenced code, standard, or publication, this UFC must take precedence. The individual DOD components may issue specific technical guidance that ex
17、pands the requirements of this UFC. The Army and Air Force issue engineering technical letters (ETLs); the Navy issues interim technical guidance (ITG); and the DLA issues technical policies. For Army, see http:/www.hnd.usace.army.mil/techinfo/engpubs.htm. For Air Force, see www.afcesa.af.mil/Direct
18、orate/CES/Mechanical/FireEngr/default.htm. For Navy, see http:/dod.wbdg.org/. 1-3.6 Authority Having Jurisdiction (AHJ). The term “AHJ“ as used in the codes and standards referenced in this UFC must mean the component office of responsibility, i.e., U.S. Army, HQ USACE/CECW-Provided by IHSNot for Re
19、saleNo reproduction or networking permitted without license from IHS-,-,-UFC 3-600-01 26 September 2006 Change 1, 14 July 2009 6 CE; U.S. Navy, NAVFACENGCOM HQ Code CHE; U.S. Marine Corps, HQMC Code LFF-1; U.S. Air Force, HQ AFCESA/CEO; Defense Logistics Agency (DLA), DES-SO; National Geospatial-Int
20、elligence Agency (NGA), Security and Installations; National Reconnaissance Office (NRO), MS Washington Headquarters Services (WHS), OPFM; and all other DOD components, Deputy Under Secretary of Defense for Installations via the DOD Fire Protection Engineering Working Group. 1-3.7 Equivalencies. Equ
21、ivalencies to established criteria may be approved by the AHJ, if the alternate fire protection engineering design provides an equivalent level of fire protection and life safety. Requests for approval must include written justification, hazard analysis, cost comparisons, criteria used, and other pe
22、rtinent data. Lack of funds is not considered sufficient justification for deviation from established criteria. Approved equivalencies and alternatives must only apply to the specific facility involved and do not constitute blanket approval for similar cases. 1-3.8 1 Exemptions. /1/ 1 Exemptions /1/
23、 to established criteria must be submitted to the AHJ for determination. The 1 exemption /1/ must demonstrate that the criteria cannot be technically executed, or execution of the criteria will increase a hazard or create a new hazard and no technical alternatives exist. Written request for 1 exempt
24、ions /1/ must include justification, hazards analysis, cost comparison, alternatives considered, and other pertinent data. Lack of funds or cost savings are not considered sufficient justification for deviation from established criteria. 1 Exemptions /1/ must only apply to the specific facility or p
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- UFC360001CHANGE12009FIREPROTECTIONENGINEERINGFORFACILITIESPDF

链接地址:http://www.mydoc123.com/p-1066948.html