TIA TSB105-1999 Clarification of Audit Order with Forced Re-Registration in Pre-TIA EIA-136-A Implementation《在TIA EIA-136-A执行前的带强行再注册的审计顺序的澄清》.pdf
《TIA TSB105-1999 Clarification of Audit Order with Forced Re-Registration in Pre-TIA EIA-136-A Implementation《在TIA EIA-136-A执行前的带强行再注册的审计顺序的澄清》.pdf》由会员分享,可在线阅读,更多相关《TIA TSB105-1999 Clarification of Audit Order with Forced Re-Registration in Pre-TIA EIA-136-A Implementation《在TIA EIA-136-A执行前的带强行再注册的审计顺序的澄清》.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、- R 3234bO0 0610508 b42 TIA/EIA TELECOMMUNICATIONS SYSTEMS BULLETIN Clarification of Audit Order with Forced Re-Regis t ration in Pr e-TI A/EH A-1 3 64 Implement at ion TSBIOS MARCH 1999 TELECOMMUNICATIONS INDUSTRY ASSOCIATION Elrctronic Industri- Alliance NOTICE WEIA Engineering Standards and Publi
2、cations are designed to serve the public interest through eliminating misunderstandings between manufacturers and purchasers, facilitating interchangeability and improvement of products, and assisting the purchaser in selecting and obtaining with minimum delay the proper product for his particular n
3、eed. Existence of such Standards and miblications shall not in any respect preclude any member or nonmember of WEIA from manufacturing or selling products not conforming to such Standards and Publications, nor shall the existence of such Standards and Publications preclude their voluntary use by tho
4、se other than TIA/= members, whether the standard is to be used either domestically or internationally. Standards, miblications and Bulletins are adopted by EU in accordance with the American National Standards Institute (ANSI) patent policy. By such action, WEIA does not assume any liability to any
5、 patent owner, nor does it assume any obligation whatever to parties adopting the Standard, Publication, or Bulletin. Technical Bulletins are distinguished from TAEA Standards or Interim Standards, in that they contain a compilation of engineering data or infomation useful to the technical community
6、, and represent approaches to good engineering practices that are suggested by the formulating committee. This Bulletin is not intended to preclude or discourage other approaches that similarly represent good engineehg practice, or that may be acceptable to, or have been accepted by, appropriate bod
7、ies. Parties who wish to bring other approaches to the attention of the formulating committee to be considered for inclusion in future revisions of this Bulletin are encouraged to do so. It is the intention of the formulating committee to revise and update this Bulletin from time to time as may be o
8、ccasioned by changes in technology, industry practice, or government regulations, or for other appropriate reasons. (From Project No. 440, formulated under the cognizance of the TLA “R-45.3 Subcommittee on Time Division Digital Technology.) Published by TELECOMMUNICATIONS INDUSTRY ASSOCIATION 1999 S
9、tandards and Technology Department 250 Wilson Boulevard Arlington, VA 22201 PRICE: Please refer to the current Catalog of EM, JEDEC and TIA STANDARDS and ENGINEERING PUBLICATIONS International (303-397-7956) or call Global Engineering Documents, USA and Canada (1-800-854-7179) All rights reserved Pr
10、inted in U.S.A. 3234bOO Ob10510 ZTT I TSB-105 Clarification of Audit Order with Forced Re-Registration in Pre-TINEIA-136-A Implementations o Table of Contents i 1. STATEMENT OF PROBLEM 1 2 2. PROPOSED SOLUTION . 2 3 4 I 3234b00 ObLOSLL L3b O 1. Statement of 9 10 11 12 13 14 15 16 17 18 19 P 21 P 23
11、24 25 26 n 28 29 3) 31 32 33 34 35 36 37 38 39 40 47 48 49 TSB-105 Clarification of Audit Order with Forced Re-Registration in Pre-TINEIA-136-A Implementations Problem A mobile station in the DCCH Camping state receives a PCH message and invokes the Termination procedure (see TIA/EIA-136-123 Section
12、 3.3 and Section 4.4). The mobile station determines that the PCH message is an Audit Order addressed to it and issues an RDCCH Request primitive containing an Audit Confirmation message along with any other coincidental messages required. According to TIA/EIA- 136-123 Section 8, the only message th
13、at can be concatenated with the Audit Confirmation is the MACA Report. Still executing the Termination procedure, the mobile station checks the Forced Re-Registration flag of the Audit Order. If the Forced Re- Registration Flag is enabled, then the mobile station invokes the Registration procedure (
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- TIATSB1051999CLARIFICATIONOFAUDITORDERWITHFORCEDREREGISTRATIONINPRETIAEIA136AIMPLEMENTATION TIAEIA136A

链接地址:http://www.mydoc123.com/p-1059814.html