SANS 10120-5 F-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section F Pil.pdf
《SANS 10120-5 F-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section F Pil.pdf》由会员分享,可在线阅读,更多相关《SANS 10120-5 F-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section F Pil.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. Clause 1 . 1.1 2 . 2.1 2.2 2.3 3 . 3.1 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 3.1.6 3.1.7 3.1.8 3.1.9 3.1.10 3.1.11 3.1.12 3.2 3.2.1 3.2.2 3.2.3 3.2.4 3.2.5 3.2.6
4、 3.2.7 3.2.8 3.2.9 3.2.10 3.2.11 4 . 4.1 4.2 Drawing F-5.1 PART 5 : CONTRACT ADMINI STRATION SECTION F CONTENTS SABS 0120 : Part 5 Section F-1983 Piling . START OP CONSTRUCTION eneral . IMMEDIATELY AFTER THE HANDING OVER OF THE SITE Approval of Detail Sheets (If Any) . Setting Out working Level for
5、Piling . DURING CONSTRUCTION . Contract Administration Permanent steel casings . Obstructions Equipment for inspection of holes . . Alternative designs Inspection of preformed holes . Mechanical coupling devices for precast piling . Water jetting Heaved cast-in-situ piles Piling records Tests and in
6、terpretation of Danish test curves . Guarantee . standing time . Methods of Construction Piling hammer. leaders. and protection devices Subsoil conditions differ materially from those shown on drawings . Expeditious augering and boring of pile holes . . Disposal of spoil . Backfilling of pile bores
7、. Soft rock sockets Construction of rock sockets . Installation of piles in soil likely to heave Driving through fill of depth greater than 2 m Construction of multi-bulb piles Testing . QUALITY CONTROL AND OTHER CONSIDERATIONS General . Disputes Page Number DRAWINGS Typical graphs of penetration du
8、ring tests August 1983 Approved hy the COUNCIL OF THE SOUTH AFRICAN BUFUXU OF STANDARDS 1 SABS 1200 F : PILING SABS 0120 : Part 5 Section F-1983 Piling NOTE: The clausc iumber(s) given at the beginning or after the heading of a clause is/are, unless otherwise stated, the number(s) of the relevant cl
9、ause(s1 of SABS 1200 F. START OF CONSTRUCTION GENERAL. For the purposes of this part of the code, cont-ract administration starts with instructions to the contractor to commence work as set out in Subclause 4.1 of Section 0. IMMEDIATELY AFTER THE HANDING OVER OF THE SITE APPROVAL OF DETAIL SHEETS (I
10、F ANY). If detail sheets have not been signed before acceptance of the tender (as should have been done), to minimize the risk of costly delays and disputes (see 4.2 below), the contractor should ensure that the details set out on the detail sheets (which should have been carefully considered and co
11、mpleted at the tender stage) are, after amendment, if necessary, agreed with and signed by the engineer before work is started. (Sec Subclause 1.3.6 of Section F of Part 3 of the code. ) NOTE: The use of an incorrect method or the wrong equipment for a particular geotechnical condition may so retard
12、 installation that other subsequent construction programs are upset. SETTING OUT (Subclause 5.1.5). When the contractor sets out the pile positions he should make due allowance for the offset of raking piles where the level from which the piles are to be driven is different from that of the undersid
13、e of the pile cap. WORKING LEVEL FOR PILING (Subclausc 5.1.6). Before work commences, the contractor should, in his own interest, ensure that the engineer has agreed on and established an average ground surface as the working level from which piling is to be measured. In order to achieve this it is
14、essential that the contractor should advise the engineer of the date on which he intends to commence piling. DURING CONSTRUCTION CONTRACT ADMINISTKATION Permanent Steel Casings (Subclause 3.2). Permanent steel casings that comply with the requirements for Grade 1 of ASTM A 252 will have the followin
15、g characteristics and the steel will have been made by the open-hearth, the electric-furnace, or the basic-oxygen process: a) The material will have the following tensile properties: Tensile strength, min. 345 MPa Yield point, min. 205 MPa Basic minimum elongation for walls of thickness 5 m and more
16、: Elongation in 200 mm 18 % Elongation in 50 mm 30 % b) The outside diameter of the steel casings will not vary by more than 1 X from the diameter specified. C) The minimum wall thickness at any point will be at least 87,5 % of the wall thickness specified. Obstructions (Subclauses 3.4, 5.8, and 8.2
17、.5) Where the information provided by the contractor in terms of Subclause 5.8 of SABS 1200 F indicates the presence of one or more obstructions that have not been scheduled , or are different from those scheduled, a) the engineer should agree with the contractor on a classification or identificatio
18、n of the obstruction(s) and take steps to ensure reasonable payment in terms of the conditions of contract, and b) the contractor should state his proposed method(s) of overcoming the obstruction(6) and advise the engineer of any claims for plant, standing time, or relocations of plant that are cont
19、emplated (see 3.2.2 below). Equipment for Inspection of Holes (Subclauses 4.3 and 5.2.4). Where construction work falls under the Mines and Works Act, prior approval for persons to be lowered down pile holes must be obtained from the inspector for the area, and the contractor should ensure, in addit
20、ion, compliance with the code of practice referred to in Subclause 4.3 of SABS 1200 F. Alternative Designs (Subclauses 5.1.3 and 8.1.2). Whcre an alternative design has been accepted, both parties to the contract should be particularly punctilious in keeping a close record of the strata disclosed du
21、ring the execution of the work and in ensuring that the records are available in the event of a dispute in regard to paynient. (See 4.2 below and Subclauses 1.3.1 and 1.3.2 of Section F of Part 3 of the code. ) Inspection of Preformed Holes (Subclause 5.2.4). Subclause 5.2.4 of SABS 1200 F requires
22、the contractor to wait for an excavation to be inspected before carrying on with installation. The engineer has to inspect the hole for purposes of quality control and measurement of depth. Immediately after he has been informed that an excavation is ready for inspection, the engineer should inspect
23、 it, and thereafter issue his written acceptance of the pile excavation as quickly as is practicable to avoid disruption of the work. Mechanical Coupling Devices for Precast Pilj-ng (Subclause 5.6.4.5). Well in advance of the need arising to use them, the contractor should submlt to the engineer for
24、 approval details of the mechanical coupling devices he proposes to use. SABS 0120 : Part S Section F-1983 Piling Water Jetting (Subclauses 5.7.2.1 to 5.7.2.5). In view of the serious loss of bearing capacity thaf may be incurred by water jetting or by excrssive water jetting, the contractor should
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS101205F1983CODEOFPRACTICEFORUSEWITHSTANDARDIZEDSPECIFICATIONSFORCIVILENGINEERINGCONSTRUCTIONANDCONTRACTDOCUMENTSPART5CONTRACTADMINISTRATIONSECTIONFPILPDF

链接地址:http://www.mydoc123.com/p-1028598.html