SANS 10120-5 DE-1984 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section DE S.pdf
《SANS 10120-5 DE-1984 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section DE S.pdf》由会员分享,可在线阅读,更多相关《SANS 10120-5 DE-1984 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section DE S.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. SABS 0120 : Part 5 section DE-1984 small earth dams PART 5 : CONTRACT ADMINISTRATION SECTION DE CONTENTS Clause Page Number . START OF CONSTRUCTION 1 Gen
4、eral 1 IMMEDIATELY AFTER THE HANDING OVER OF THE SITE 1 DURING CONSTRUCTION . 1 eth hods of Construction 1 Classification of excavated material 1 Topsoil . 2 Administration 2 Provision for settlement 2 QUALITY CONTROL AND OTHER CONSIDERATIONS 2 . General 2 Notes on Disputes. Mediations. Etc 2 Classi
5、fication of materials . 2 March 1984 Approved by the COUNCIL OF THE SOUTH AFRICAN BUREAU OF STANDARDS SABS 0120 : Part 5 Section DE-1984 Small earth dams SABS l200 DE : SMALL EARTH DAMS NOTE: The clause number(s) given at the beginning or after the heading of a clause is/are, unless otherwise stated
6、, the number(s) of the relevant clause(s) of SAJ3S 1200 DE. START OF CONSTRUCTION GENERAL. For the purposes of this part of the code, contract administration starts with instructions to the contractor to commence work as set out in Subclause 4.1 of Section 0. IMMEDIATELY AFTER THE HANDING OVER OF TH
7、E SITE. The engineer should give immediate attention to all matters necessary to ensure that the start of the contract is not adversely affected by lack of information. 3. DURING CONSTRUCTION 3.1 METHODS OF CONSTRUCTION 3.1.1 Classification of Excavated Material. The definition of the term “efficien
8、tly“ given in Subclause 3.1.1 of SABS 1200 DE (“in a manner that can reasonably be expected of a contractor having regard to the production achieved“) may give rise to differences between the interpretations put on the word “reasonably“ by the engineer and the contractor. This may result in the cont
9、tactor being reluctant to accept the engineers decision and requesting mediation in terms of the conditions of contract. Under such circumstances, before mediation proceedings are initiated, the engineer and the contractor should consider carrying out in-situ tests to prove the classification of the
10、 material in a particular area, in terms of agreed procedures and criteria such as the following1): Tests to verify the classification of excavated materials. The test procedures and the criteria for verifying the classification of excavated materials carried out in terms of Subclauses 3.1.1 and 3.1
11、.2 of SABS 1200 DE shall, subject to the explanation of terms given in A below, comply with the procedures and criteria given in B below. A. Explanation of Terms A.1 Trial machine. A trial machine is any of the appropriate machines (or machine units) specified in Subclauses 3.1.2 and 4.1 of SABS 120
12、0 DE. Two trial machines may apply to the intermediate class of excavation, the one to define the lower limit and the other to define the upper limit of the class of excavation. NOTE: Soft excavation and hard excavation,i.e. the lowest and the highest classes, have only one limit each, that is, an u
13、pper and a lower limit, respectively. The trial machine for ripping shall be fitted with a standard single-tine parallelogram-type ripper and shall be of the mass and engine power specified in Subclause 3.1.2 of SABS 1200 DE, for the relevant class of excavation. A. 2 Efficient ri in . Efficient rip
14、ping occurs when the tine of the ripper rips through the material wrile the folyzwi:g conditions apply simultaneously: a3 The ripper parallelogram remains within 5 O of a horizontal position; b) the machine is operating at full power; C) traction is maintained on both tracks; d) the machine advances
15、 without stalling at a rate of between 1.5 km/h and 3,5 km/h. The limit of efficient ripping is reached when the ripping operation just fails to comply with all the requirements of (a)-(d) simultaneously. A. 3 Mechanical ripping. Mechanical ripping commences when the limit of efficient ripping has b
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS101205DE1984CODEOFPRACTICEFORUSEWITHSTANDARDIZEDSPECIFICATIONSFORCIVILENGINEERINGCONSTRUCTIONANDCONTRACTDOCUMENTSPART5CONTRACTADMINISTRATIONSECTIONDESPDF

链接地址:http://www.mydoc123.com/p-1028594.html