SANS 10120-3 HB-1985 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 3 Guidance for design Section HB Cladd.pdf
《SANS 10120-3 HB-1985 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 3 Guidance for design Section HB Cladd.pdf》由会员分享,可在线阅读,更多相关《SANS 10120-3 HB-1985 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 3 Guidance for design Section HB Cladd.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. SABS 0120 : Part 3 Section HB-1985 Cladding and sheeting Clause PART 3 t GUIDANCE FOR DESIGN SECTION HB CONTENTS Page Number PRE-TENDER CONSIDERITIONS .
4、Investigations Peak wind loads . Administration . Essential procedure before issue of letter of acceptance of tender Period of validity of tenders Approval of data given by tenderer on detail sheets . Tenderers and approved manufacturers Documentation . Provision for escalation . Detail sheets and s
5、pecial conditions of tender Project specification Inhibiting wet-storage stain on galvanized sheeting . Flashinqs to protrusions Site handling of aluminium sheeting Detail sheet . DESIGN REQUIREMENTS General Design and Selection of Fasteners Peak Wind Loads Detailed Instructions Flashinqs Factory gu
6、tters . Flashings to protrusions Gutters. Launders and Downpipes . APPLICABILITY OF OTHER CODES TEST PROCEDURES QUALITY CONTROL AND OTHER CONSIDERATIONS Failures due to Wind Loading February 1985 Approved by the COUNCIL OF THE SOUTH AFRICAN BIJREAU OF STANDARDS SABS 0120 : Part 3 Section HB-1985 Cla
7、dding and sheeting SABS 1200 Ill3 : CLADDING AND SHEETING NOTE: The clause nunrber(s) given at the beginning or after the heading of a clause is/are. unless otherwise stated, the number(s) of the relevant clause(s) of SABS 1200 HE. PRETENDER CONSIDERATIONS INVESTIGATJONS Peak Wind Loads, Determine t
8、he peak wind loads expected for the region in which the site is located. (See 5.1 below and Subclause 3.2.l(d) of Section HB of Part 2 of the code.) ADMINISTRATION Essential Procedure before lssue of Letter of Acceptance of Tender. Do not, on behalf of the employer, sign (or arrange for the employer
9、 to sign) the letter of acceptance of the tender until the action required in terms of 1.2.3 below and, when applicable, in terms of Subclauses 7.1.1 and 7.1.4 of SABS l200 HR has been finalized. This precaution is necessary because the contractors written completion of the tender together with a le
10、tter of acceptance from the employer constitutes a legally binding contract (see Subclause 1.3.2 of Section A of Part 3 of the code and The law of buildin contracts and arbitration in South frical). Should the prospective contractor propose a variation to9 the engineers tender enquiry or should he o
11、ffer alternative materials in his written completion of the tender, such a proposal would be a counter offer. McKenzie, in the book referred to above, states, “For a tender to be such that on acceptance a valid contract is created it must be intended to be the whole offer and must not leave certain
12、essential terms open to further negotiation“. NOTE: “Prospective contractor“ means the party or firm who has been advised that, provided that he/it complies, within an agreed time limit, with the engineers specified requirements with regard to alternative cladding (or sheeting) or fasteners, or both
13、, his/its tender will be accepted thus converting him/it into the contractor Period of Validity of Tenders. Ensure that the period of validity of all tenders is suitably extended if delays are likely to occur in obtaining the information and details required in terms of 1.2.3 below or in concluding
14、the tests required by the engineer in terms of Subclauses 7.1.1 and 7.1.4 of SABS 1200 HB. Approval of Data given by Tenderer on Detail Sheets. After a tender has been received and before the award of the contract ensure that a) all relevant information has been provided on the detail sheet(s), if a
15、ny, and that agreement has been reached on all detail data given on the detail sheet(s) (see 1.3.2 and 1.3.7 below); b) when relevant, each detail sheet has been suitably amended where necessary, any variations have been priced and each detail sheet has been signed by the engineer as having been app
16、roved (see 1.2.1 above and Subclause 3.2.2 of Section BB of Part 2 of the code); C) special requirements, if any, have been dealt with adequately and are fully understood and, if any doubt exists, confirm the understanding by the exchange of letters. Tenderers and Approved Manufacturers (Subclauses
17、3.2 and 3.4). Although it is the tenderers responsibility to determine the identity of approved manufacturers, the engineer must make such information available if so requested during the tender period, because certain requirements of the specification are dependant on those of approved manufacturer
18、s (see Subclause 3.2.1 of Section HB of Part 5 of the code). WCUMENTATION Provision for Escalation. Ensure that an appropriate escalation clause is included in the contract documents. (See Subclause 8.2.2 of SABS 1200 AH), and Subclause 1.3.2.2 of Section H.) Detail Sheets and Special Conditions of
19、Tender. When it is considered likely that manufacturers may be able to provide an acceptable cladding that differs in detail from that scheduled or specified in SABS 1200 HB or in the project specification, and also when it is required that the engineer be advised of particular details of the types
20、of material on offer, insert a clause in the special conditions of tender that requires the tenderer to complete one or more detail sheets (included in the document), and draw his attention to the requirements of the project specification covering the completion of such detail sheets (see 1.2.3 abov
21、e, 1.3.7 below and Suhclause 3.2.2 of Section HB of Part 2 of the code). Project Specification Fasteners (Subclause 3.7). On the basis of test results, preferably specify in the project specification the type of fasteners to be used, rather than leaving selection to the contractor. An alternative of
22、fered in the tender (see 1.3.7 below) may be accepted on the grounds of proven successful use in similar applications. (See also 2.2 below and Subclause 3.2.3 of Section HB of Part 2 of the code.) Installation tolerances for cladding and sheeting (Subclause 6.2.2). Take into account the aesthetic ap
23、pearance of the finished structure when giving installation tolerances for cladding and sheeting in the project specification. Inhibiting Wet-storage Stain on Galvanized Sheetinp. Galvanized sheeting materials are very susceptible to wet-storage stain during transit and storage on site. Consider spe
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS101203HB1985CODEOFPRACTICEFORUSEWITHSTANDARDIZEDSPECIFICATIONSFORCIVILENGINEERINGCONSTRUCTIONANDCONTRACTDOCUMENTSPART3GUIDANCEFORDESIGNSECTIONHBCLADDPDF

链接地址:http://www.mydoc123.com/p-1028527.html