SANS 10120-3 H-1990 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 3 Guidance for design Section H Structu.pdf
《SANS 10120-3 H-1990 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 3 Guidance for design Section H Structu.pdf》由会员分享,可在线阅读,更多相关《SANS 10120-3 H-1990 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 3 Guidance for design Section H Structu.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. SABS 0120 : Part 3 Section H-1990 Structural steelwork PART 3 : GUIDANCE FOR DESIGN SECTION H CONTENTS Clause PRE-TENDER CONSIDERATIONS Investigations .
4、General Cost . Administration . Selection of design codes Details to be given on drawings Type of contract . Data for tendering purposes Hard-standings . Documentation Drawings . Compi l ing tenderlcontract document for structural steelwork Corrosion protection . Dressing edges of flame-cut plates .
5、 Tolerances . Tests DESIGN REQUIREMENTS General Materials Weather-resistant steel . Brittle fracture Welding of special steels Steel of unknown properties Loading Dead and imposed loads . Wind loads . Loads due to temperature changes . . F1 uctuations of stress (fatigue) Holes for Holding-down Bolts
6、 . Joints in Compression Lifting Devices for Erection and Maintenance . Welding Techniques . General Guidance on weldability and methods Butt welds . Protective Treatment . General Safety During Erection . Sundry Items . Handrails Open grid floors . Floorplate floors APPLICABILITY OF OTHER CODES . T
7、EST PROCEDURES Normal Tests . Destructive Tests Tensioning of Steel Tape for Measurement of Tolerances . QUALITY CONTROL AND OTHER CONSIDERATIONS . General Lessons from Design Failures . General . Failure of the West Gate Bridge Page Number TEXT REFERENCES . 6 Second Revision August 1990 This sectio
8、n of the code supersedes SABS 0120 : Part 3 : Section H-1983 Approved by the COUNCIL OF THE SOUTH AFRICAN BUREAU OF STANDARDS SABS 0120 : Part 3 Section H-1990 Structural steelwork SABS 1200 H : STRUCTURAL STEELWORK NOTE: The clause number(s) given at the beginning or after the heading of a clause i
9、slare, unless otherwise stated, the number(s) of the relevant clause(s) of SABS 1200 H. PRE-TENDER CONSIDERATIONS INVESTIGATIONS General. In addition to investigating founding conditions, investigate the dimen- sionl requirements for the structure(s), and the loads to be carried (see 2.3) by the str
10、ucture(s). Cost The cost of completed structural steelwork depends on the amount of work (man-hours plus plantlequipment-hours) required per unit of mass, in addition to the cost of the steel itself and the cost of the corr sion protection system chosen (for corro- sion protection details see SABS 1
11、200 HC13). The completed cost per unit of mass of heavy steelwork involving a minimum of work will be less than that of light steelwork involving long lengths of light sections and still less than that of steelwork involving short lengths of light steelwork with many joints. ADMINISTRATION Selection
12、 of Desi n Codes. Ensure that structural steelw rk to be executed in terms of SABS 1200 H isgdesigned in accordance with SABS 016223 and this part of the code. Details to be Given onJyzint. Ensure that drawings for steelwork referred to in Im-ml the requiremen% of Subclause 5.1.l.of SABS 1200 H and
13、give sufficient detail for the schedule to be drawn up as shown in the typical schedule of Section H of Part 4 of the code. T e of Contract. Decide whether the documentation is to provide for the structural -P S eelwork to be executed a) as part of a main civil contract; b as part of an architectura
14、l contract; C as a separate contract; or d) as a nominated subcontract to the contract referred to in either (a) or (b) above. Data for Te derin Pur oses. Where the data called for in Subclause 2.1 of SZEfio?i-df-ofhe code have not been provided in the tender document or on the drawings, ensure that
15、 the information is issued before the closing date for receipt of tenders so that all tenders may be evaluated on the same basis and the need for subsequent negotiation is avoided. Hard-standin s (Subclause 5.5). Where SABS 1200 H i S used for a nominated sub- - confifrEw beeciwith SABS 1200 nfF or
16、SABS 1200 AA f 1, with any other general specifAcation, and with any other civil or mechanical engineering or architects general con- ditions of contract (such as those of Spoornet (E5), the Public Works Department (PW 54), and the A reement and schedule of conditions of building_contract as recomme
17、nded by thh-%T-iFoh Af rl can Arcliit%6TtfFi$Ssocii-01: South African Quantity Surveyors, and the Building Industries Federation (South Africa) provided that the contract includes a) special conditions of contract, or b) in the project specification, clauses that comply with the requirements of 1.3.
18、2.2 and 1.3.2.3. Contract erice adustmeg. Where SABS 1200 AH) is omitted from the contrac;, tkiT-ln .fddj- specification the contents of Su lause 8.2.2 of SABS 1200 AH37. (S ee also Subclause 1.2.1 of Section AH $5 , and Subclause l.L(b) of Section AH) of Part 2 of the code.) roved laboratories. Unl
19、ess otherwise stated in the project specification, tests or dKsiiiiwofIlirequ7-Fed in terms of a specification may be carried out in the testing laboratories of the South African Bureau of Standards, the Council for Scientific and Industrial Research, the relevant government departments or local aut
20、horities, or by other recognized or approved laboratories or inspection authori - ties. Definitions. Where GCC are not included in the contract, ensure that suitable defi- iiifiloiiS-of the following are included: a Employer b Engineer c Contractor site Prel imi nary and genes!-!terns not scheduled.
21、 When the engineer requires that the - conEact6FTTEeT“For sunin7 etc., should cover all costs of a pre- liminary and general nature in addition to the applicable of the operations spe- cified in Subclauses 8.3.1-8.3.11 of SABS 1200 H, include in the project specifi- cation the following: a) If SABS
22、12003) is included in the contract, requirement to theeffect that 7 the rovi sions of Subclause 8.3.1 of SABS 1200 AH amlv to each af Subclauses - 8.3.i-8.3.11, as r levant, of SABS 00 H, or S 51 b) if SABS 1200 A47 or SABS 120 AA is included in the contract, the contents of Subcl ause 8.3.1 of SABS
23、 1200 AH ), suitably amended with regard to the clause - refsrences. Corrosion Protect*. Refer to SABS 1200 HC) and Section HC of the code. Dressi n Edges of F1 ame-cut Pi ates (Subcl ause 5.2.3). Note that f l ame-cutti ng i S - accept% normardure and that where f l ame-cutt ng i S not to be a1 low
24、ed, this must be stated in the project specification. (See also Subclause 2.l(b) of Section H of Part 2 and Subclause 3.2.2.2 of Section H of Part 5 of the coce.) To1 erances - Tolerances - for extensions to existin structure (Subclause 6.2). Where the project nvolves extensions %?K3xTig-hncIude in
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS101203H1990CODEOFPRACTICEFORUSEWITHSTANDARDIZEDSPECIFICATIONSFORCIVILENGINEERINGCONSTRUCTIONANDCONTRACTDOCUMENTSPART3GUIDANCEFORDESIGNSECTIONHSTRUCTUPDF

链接地址:http://www.mydoc123.com/p-1028525.html