SAE ARP 5453-2000 Training Pilots Prior Simultaneous Instrument Landing System (ILS) Precision Runway Monitor (PRM) Approaches to Closely-Spaced Parallel Runways《接近平行跑道时同步设备降落系统(IL.pdf
《SAE ARP 5453-2000 Training Pilots Prior Simultaneous Instrument Landing System (ILS) Precision Runway Monitor (PRM) Approaches to Closely-Spaced Parallel Runways《接近平行跑道时同步设备降落系统(IL.pdf》由会员分享,可在线阅读,更多相关《SAE ARP 5453-2000 Training Pilots Prior Simultaneous Instrument Landing System (ILS) Precision Runway Monitor (PRM) Approaches to Closely-Spaced Parallel Runways《接近平行跑道时同步设备降落系统(IL.pdf(30页珍藏版)》请在麦多课文档分享上搜索。
1、SAE Technical Standards Board Rules provide that: “This report is published by SAE to advance the state of technical and engineering sciences. The use of this report is entirelyvoluntary, and its applicability and suitability for any particular use, including any patent infringement arising therefro
2、m, is the sole responsibility of the user.”SAE reviews each technical report at least every five years at which time it may be reaffirmed, revised, or cancelled. SAE invites your written comments and suggestions.Copyright 2006 SAE InternationalAll rights reserved. No part of this publication may be
3、reproduced, stored in a retrieval system or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior written permission of SAE.TO PLACE A DOCUMENT ORDER: Tel: 877-606-7323 (inside USA and Canada)Tel: 724-776-4970 (outside USA)Fax: 724
4、-776-0790Email: CustomerServicesae.orgSAE WEB ADDRESS: http:/www.sae.orgAEROSPACE RECOMMENDED PRACTICEARP5453Issued 2000-09Reaffirmed 2006-08Training Pilots Prior to Simultaneous Instrument LandingSystem (ILS) Precision Runway Monitor (PRM) Approaches toClosely-Spaced Parallel RunwaysRATIONALEThis d
5、ocument has been reaffirmed to comply with the SAE 5-year Review policy.FOREWORDThe Precision Runway Monitor (PRM) system consists of high-speed update and high-resolution radar hardware, software, and video monitors. This significantly improves the air traffic controllers ability to monitor aircraf
6、t on final approach and enhances the overall safety of flight operations.These safety enhancements have immediately been offset by a reduction of minimum separation between aircraft on approach. Aircraft are proposed to be allowed on parallel approaches with runway centerlines as close as 3000 ft wi
7、thout the lateral, in-trail or stagger separation previously required. The stated intent is to bring instrument meteorological conditions arrival rates closer to arrival rates during visual meteorological conditions. If certain events occur, a breakout maneuver must be successfully accomplished with
8、in seconds to meet minimum aircraft separation requirements.The following documents the SAE Human Behavioral Engineering Technology (HBET/G-10) Realistic Training Subcommittees efforts to safely integrate high update radar into the national airspace system. To accomplish this goal, a Precision Runwa
9、y Monitor (PRM) regimen is provided which begins with authorizing documents such as operation specifications issued by the Federal Aviation Administrator. The regimen also includes an awareness video and handout, a means for measuring understanding of the knowledge essential to conducting safe and e
10、fficient PRM approaches, a train-to-proficiency simulator module, and a checklist to determine whether or not the flight may safely include a PRM approach and what preflight actions are required if PRM unable. All operators at PRM airports are invited to use this information as a standardized refere
11、nce.The material in this document is a result of the SAE HBET/G-10 Realistic Training Subcommittee review of current operator training programs and analysis, and the requirements and recommendations of regulators, air traffic controllers, airport facility managers, manufacturers, and pilot associati
12、ons. To maintain standardization and currency, user input is encouraged. Direct information and comments to the SAE G-10 Realistic Training Subcommittee Chairman, 400 Commonwealth Drive, Warrendale, PA 15096-0001, USA.This document is maintained in Adobe FrameMaker+SGML 5.5.SAE ARP5453 - 2 -FOREWORD
13、 (Continued)This document was prepared by the SAE G-10G Realistic Training Subcommittee by the following individuals:Document Sponsor: Captain James WardDocument Team:Thomas Aberle Professor Richard AdamsLtCol Kenneth Burke, USAF Judith Burki-Cohen, PhDCAnne Cook Captain T. A. DemosthenesArchie Dill
14、ard, PhD Darlene FarrPeter Hwoschinsky, PhD Andrew Kendra, CFIProf. Jefferson Koonce, PhD Thomas McCloy, PhDSAE ARP5453 - 3 -TABLE OF CONTENTS1. SCOPE .32. REFERENCES .32.1 Applicable Documents 32.1.1 SAE Publications 32.1.2 U.S. Government Publications32.1.3 Jeppesen Publications 32.1.4 Aircraft Ma
15、nufacturer Operating Bulletin for Each Aircraft Type and Each Operator42.1.5 Video Tape 42.1.6 Evaluations .42.1.7 Evaluations .42.2 Glossary52.3 Abbreviations 63. GENERAL.6APPENDIX A ACTION TREE 9APPENDIX B AUTHORIZATION .11APPENDIX C READING MATERIAL .14APPENDIX D VIDEOTAPE20APPENDIX E CHECK FOR U
16、NDERSTANDING.21APPENDIX F SIMULATOR TRAINING .24APPENDIX G AIRCRAFT SPECIFIC PROCEDURES 25APPENDIX H DETERMINING AIR TRAFFIC CONTROL STATUS.28APPENDIX I CHECKLIST TO DETERMINE IF PRM ABLE/UNABLE .29SAE ARP5453 - 4 -1. SCOPE:This SAE Aerospace Recommended Practice (ARP) provides guidance to prepare p
17、ilots to participate in simultaneous instrument landing system (ILS) precision runway monitor (PRM) approaches to closely-spaced parallel runways.2. REFERENCES:2.1 Applicable Documents:The following publications form a part of this document to the extent specified herein. The latest issue of SAE pub
18、lications shall apply. The applicable issue of other publications shall be the issue in effect on the date of the purchase order. In the event of conflict between the text of this document and references cited herein, the text of this document takes precedence. Nothing in this document, however, sup
19、ersedes applicable laws and regulations unless a specific exemption has been obtained.2.1.1 SAE Publications: Available from SAE, 400 Commonwealth Drive, Warrendale, PA 15096-0001.SAE Aerospace Technical Report Style Manual (September 1997)2.1.2 U.S. Government Publications: Available from DODSSP, S
20、ubscription Services Desk, Building 4D, 700 Robbins Avenue, Philadelphia, PA 19111-5094.FAA Aeronautical Information Manual, Section 5-4-12 to 14, and Pilot/Controller GlossaryFAA Order 8400.10 Flight Standards Handbook Bulletin for Air Transportation (HBAT) 97-05 titled “Operations Specifications p
21、aragraph C052/A002 (revised), Operating Instruction, and Training Program Approval for Simultaneous Close Parallel ILS Approach and Landing (ILS PRM)” 4-29-97FAA Form 8400-8 Operations Specifications (issued for individual air carriers)FAA Order 7110.65 Air Traffic Control, Section 5-9-8 Simultaneou
22、s Independent Dual ILS/MLS Approaches-High Update RadarFederal Aviation Regulations, Part 12.1.3 Jeppesen Publications: Available from Jeppesen, 55 Inverness Drive, Englewood, CO 80112-5498.Attention all users page 11-0 (issued for the airport conducting ILS PRM approaches)Approach chart (issued for
23、 each runway to which ILS PRM approaches will be conducted)SAE ARP5453 - 5 -2.1.4 Aircraft Manufacturer Operating Bulletin for Each Aircraft Type and Each Operator:Northwest Airlines A-320 Operating Bulletin 97-1 Simultaneous Close Parallel ILS (ILS PRM) Approaches At MSP, April 25, 1997Northwest Ai
24、rlines Flight Operations General Bulletin 98-101, November 13, 19982.1.5 Video Tape: Available from System Resources Corporation, 3rd Floor, 5218 Atlantic Avenue, Mays Landing, NJ 08330; 609-625-5669; Fax 609-625-5497.“ILS PRM Approaches Information For Pilots” 16:00 7/24/97 DUB MST 586.012.1.6 Eval
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SAEARP54532000TRAININGPILOTSPRIORSIMULTANEOUSINSTRUMENTLANDINGSYSTEMILSPRECISIONRUNWAYMONITORPRMAPPROACHESTOCLOSELYSPACEDPARALLELRUNWAYS

链接地址:http://www.mydoc123.com/p-1023090.html