SAE ARP 4014-1988 AIRCRAFT TURBINE ENGINE PNEUMATIC COMPONENT CONTAMINATED AIR ENDURANCE TEST《飞机涡轮发动机气动元件污染空气耐久性试验》.pdf
《SAE ARP 4014-1988 AIRCRAFT TURBINE ENGINE PNEUMATIC COMPONENT CONTAMINATED AIR ENDURANCE TEST《飞机涡轮发动机气动元件污染空气耐久性试验》.pdf》由会员分享,可在线阅读,更多相关《SAE ARP 4014-1988 AIRCRAFT TURBINE ENGINE PNEUMATIC COMPONENT CONTAMINATED AIR ENDURANCE TEST《飞机涡轮发动机气动元件污染空气耐久性试验》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、SAE ARP*LiOLLi 88 8357340 0027626 7 B The Engineering Society AEROSPACE =For Advancing Mobility Land Sea Air and Space RECOMMENDED PRACTICE 400 COMMONWEALTH DRIVE, WARRENDALE, PA 15096 y- 3 3 - L3 ARP40 14 Issued 8-31-88 I I Submitted for recognition as an American National Standard I AIRCRAFT TURBI
2、NE ENGINE PNEUMATIC COMPONENT CONTAMINATED AIR ENDURANCE TEST TABLE OF CONTENTS Page No. 1. SCOPE AND PURPOSE . 2 2. APPLICABLE DOCUMENTS 2 3. TEST SETUP I 2 4. TEST CIRCUIT 4 I 5. TEST METHOD . 6 6. TEST DATA . 7 7. LESSONS LEARNED . 8 I LIST OF ILLUSTRATIONS Contaminated Air Test Facility . Figure
3、 1 I 3 SAETechnical Board Rules provide that: “This report is published by SAE to advance the state of technical and engineering sciences. The use of this report is entirely voluntary, and its applicability and suitability for any particular use, including any patent infringement arising therefrom,
4、is the sole responsibility of the user.” CAE reviews each technical report at least every five years at which time it may be reaffirmed, revised, or cancelled. SAE invites your written comments and suggestions. Copyright 1988 Society of Automotive Engineers, Inc. Printed in U.S.A. All rights reserve
5、d. COPYRIGHT SAE International (Society of Automotive Engineers, Inc)Licensed by Information Handling ServicesSAE ARP*:L1OL:L1 88 = 83573qO 0027b27 9 = ARP40 14 EIE -QB Page 2 1 . SCOPE. AND PURPOSE : This recommended practice describes a method of conducting an endurance test using contaminated air
6、 when the applicable specification requires non-recirculation of the contaminants. determine the resistance of the engine mounted components to wear or damage caused by the contaminated air. The objective of the test is to The method described herein calls for non-recirculation of the contaminants a
7、nd is intended to provide a uniform distribution of the contaminant at the inlet to the Unit Under Test (UUT). The UUT may require the use of a hydraulic fluid for actuation of components within the test unit. Contamination of this test fluid is not part of this recommended practice, however, if req
8、uired by applicable test specification, refer to MAP 749A. 2, APPLICABLE DOCUMENTS : 2.1 blilitary Specifications: MIL-E-5007 - Engine, Aircraft, Turbojet and Turbofan, General Specification for 2,2 SAE Publications: MAP749A - Aircraft & Turbine Engine Fuel System Component Endurance Test (Contamina
9、ted Fuel) 3, 3, TEST SETUP (Ref. Fig. 1): Air Contamination: The air contamination requirements should be as specified in the applicable specification. Typical military requirements for pneumatic components are given in MIL-E-5007. 3,2 Test Fluid: Fluid, if required, should conform to the applicable
10、 specification. The engine primary fuel is recommended, however, if the test facility cannot be safely operated using fuel at high temperature, then the use of a silicone fluid having a specific gravity or viscosity, or both, similar to the engine fluid is recommended. 3.3 Test Fluid.Temperature: Co
11、ntrol is required as necessary to keep the UUT within its operational limits. 3.4 Test Fluid Pressure: The test fluid pressure should be as specified by the applicable test specification. 3.5 Ambient Temperature: Control required as necessary to keep the UUT within its operational limits. Test equip
12、ment used in a hot ambient facility may require special cooling provisions. - - 3.6 Inlet Air Temperature: The air temperature at the inlet of the UUT should be a minimum of 220OF or as otherwise specified by the applicable specification. COPYRIGHT SAE International (Society of Automotive Engineers,
13、 Inc)Licensed by Information Handling Services SAE ARP*4OL4 88 W 8357340 0027628 O W Page 3 L - ARP4014 w FIGURE 1 - Contaminated Air Test Facility COPYRIGHT SAE International (Society of Automotive Engineers, Inc)Licensed by Information Handling Services _I_ - _-I_- SAE ARP*40L4 88 - 8357340 0027b2
14、7 2 - ARP40 14 Page 4 3.7 Inlet Air Pressure: The air pressure at the inlet of the UUT should be a minlmum of 15 psig or as otherwise specified by the applicable specification. 3.8 blounting: Each component should be mounted by its normal mounting pad for a level flight attitude. 3.9 Plumbing: Actua
15、l installation plumbing should be used when possible for connection of test components if two or more components are tested together. Where actual installation plumbing is not available, line sizes, lengths and bends should be duplicated as closely as possible. The matchup of the inlet air line and
16、the opening in the test unit (if not identical to the engine installation) shall be made to prevent contamination in the inlet air from collecting at this interface outside the UUT. 3.10 Facility Filters: A clean-up filter downstream of the facilitys backpressure control valve should be used if ther
17、e is a concern relative to exhausting contaminated air. This filter can be a cotton sateen dust bag sized for the exhaust line. 3.11 Functional Cycling Simulation: The cyclic variations in air flow rate can be accomplished by us-tng a cycle scheduler. Commercial units are available that can be progr
18、ammed to provide switch closures at various time intervals. With proper interface equipment, this scheduler would open and close valves in the test unit in addition to opening and closing a solenoid-operated rig bypass valve, in the opposite sense, so that the air flow rate through the facility rema
19、ins essentially constant. If an automatic cycler is used, consideration should also be given to incorporating an auto-abort system to prevent inadvertent damage to the UUT or test facility. 3.12 Termination f Test: The test should be terminated at a point where the engine system components have been
20、 operated as required under the applicable specification. These components should be functionally tested using the specified clean air after the completion of the contamination test requirements. 4. TEST CIRCUIT: 4,l Circuit Schematic: A typica “ 4.2 Circuit Components: system arrangement is shown i
21、n Fig, 1. 4.2.1 Location: The functional ocation of the circuit components should be as shown in Fig. 1. The locations of the contamination inputs to the inlet line shall be downstream of the UUT Bypass Valve, so that none of the contamination is dumped overboard. The flow rate in the inlet line mus
22、t be sufficient to avoid settling of sol id contaminants and resultant “slugging.“ COPYRIGHT SAE International (Society of Automotive Engineers, Inc)Licensed by Information Handling ServicesPage 5 s= I ARP4014 4.2.1 4.2.2 4.2.3 4.2,4 (Conti nued) : The physical location of the circuit components wil
23、l depend greatly on the facility configuration and the temperature of the air being used, for example, whether or not the UUT is in a hazardous environment relative to human safety. The contamination inputs to the inlet line should be as close to the UUT as possible, that is, less than 24 in, to red
24、uce the amount of contamination that could collect on the wall of the inlet line. The inlet line should have a good electrical ground to prevent a build-up of static electricity which could cause contamination to collect in this 1 ine. Contamination - Liquid contaminants, oil and salt water, may be
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SAEARP40141988AIRCRAFTTURBINEENGINEPNEUMATICCOMPONENTCONTAMINATEDAIRENDURANCETEST 飞机 涡轮 发动机 气动元件 污染 空气

链接地址:http://www.mydoc123.com/p-1022867.html