REG UFGS-33 05 23 13-2013 UTILITY HORIZONTAL DIRECTIONAL DRILLING.pdf
《REG UFGS-33 05 23 13-2013 UTILITY HORIZONTAL DIRECTIONAL DRILLING.pdf》由会员分享,可在线阅读,更多相关《REG UFGS-33 05 23 13-2013 UTILITY HORIZONTAL DIRECTIONAL DRILLING.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-33 05 23.13 (November 2013)-Preparing Activity: NASA SupersedingUFGS-33 05 23.13 (February 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in Agreement with UMRL dated October 2013*SECTION TABLE OF CONTENTSDIVISION 33 - UTILITIESSECTION 33 05 23.13UTIL
2、ITY HORIZONTAL DIRECTIONAL DRILLING11/13PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 COMMENCEMENT, DELIVERY, STORAGE, AND HANDLING OF MATERIALS1.4 QUALITY ASSURANCE1.4.1 Qualifications1.4.2 SafetyPART 2 PRODUCTS2.1 EQUIPMENT2.1.1 Drill Rod2.1.2 Pipe2.2 MATERIALS2.2.1 Drilling FluidsPART 3 EXECUTION
3、3.1 INSTALLATION3.1.1 Drill Set-Up3.1.2 Drill Entrance and Exit Pits3.1.3 Drill Entrance and Exit Angle3.1.4 Pilot Hole3.1.5 Guidance Systems3.1.6 Reaming3.1.7 Pull Back3.1.8 Connection of Product Pipe to Pipeline3.2 FIELD QUALITY CONTROL3.3 CLOSEOUT ACTIVITIES- End of Section Table of Contents -SEC
4、TION 33 05 23.13 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-33 05 23.13 (November 2013)-Preparing Activity: NASA SupersedingUFGS-33 05 23.13 (February 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferen
5、ces are in Agreement with UMRL dated October 2013*SECTION 33 05 23.13UTILITY HORIZONTAL DIRECTIONAL DRILLING11/13*NOTE: This guide specification covers the requirements for directional drilling systems, equipment, piping and procedures.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (
6、UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove
7、 information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph i
8、s used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside
9、 of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.SECTION 33 05 23.13 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,
10、-,-References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referre
11、d to within the text by the basic designation only.AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO)AASHTO T 180 (2010) Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) DropU.S. NATIONAL ARCHIVES AND RECORD
12、S ADMINISTRATION (NARA)29 CFR 1926.652 Safety and Health Regulations for Construction; Subpart P, Excavations; Requirements for Protective Systems1.2 SUBMITTALS*NOTE: Review Submittal Description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only th
13、e submittals required for the project.The Guide Specification technical editors have designated those items that require Government approval, due to their complexity or criticality, with a “G.“ Generally, other submittal items can be reviewed by the Contractors Quality Control System. Only add a “G”
14、 to an item, if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes
15、for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically
16、are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*SECTION 33 05 23.13 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-
17、,-Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval.information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Governmen
18、t. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-01 Preconstruction SubmittalsStatement of Qualifications and Records; G; G, _SD-02 Shop DrawingsRecord Drawings; G; G, _SD-03 Product DataPolyethylene Pipe; G; G, _Drilling Fluids; G; G, _Additives; G; G, _Mixtures;
19、G; G, _SD-05 Design DataMaterial Safety Data Sheets; G; G, _SD-06 Test ReportsSoil Test Data; G; G, _SD-07 CertificatesDrill Rod; G; G, _SD-11 Closeout SubmittalsComplete Work Logs of Guided Directional Drill Operations; G; G, _1.3 COMMENCEMENT, DELIVERY, STORAGE, AND HANDLING OF MATERIALSPrior to c
20、ommencement of the work, submit the following to the Engineer of Record for review and approval:a. Polyethylene Pipeb. Material Safety Data Sheetsc. Statement of Qualifications and Recordsd. Soil Test DataProvide written documentation of conformance with AASHTO T 180. Submit a complete list of all d
21、rilling fluids, additives, and mixtures to be used along with Material Safety Data Sheets.SECTION 33 05 23.13 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Inspect materials delivered to the site for damage. All materials found during inspect
22、ion or during the progress of work to have cracks, flaws, surface abrasions, or other defects will be rejected. Remove defective materials from the job site.1.4 QUALITY ASSURANCE1.4.1 QualificationsEnsure that Contractor and his field supervisor assigned to this project are experienced in work of th
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGUFGS330523132013UTILITYHORIZONTALDIRECTIONALDRILLINGPDF

链接地址:http://www.mydoc123.com/p-1019672.html