1、Public Lessons Learned Entry: 5156 Lesson Info: Lesson Number: 5156 Submitting Organization: KSC Submitted by: Dawn Martin Subject: Pad-39A Sandblast Pot Mishap Abstract: A worker disconnected a hose from the vent pipe attached to a sandblast pot, the stored pressure energy in the pot caused the pip
2、e to spin, and the worker was struck several times by the spinning vent pipe. The injured worker and several others involved in the sandblasting operation were employed under a subcontract to perform corrosion control, including sandblasting and painting. The oversight of equipment configuration and
3、 operations delegated to subcontractors can lead to unsafe operations. All pressure system maintenance should be performed by approved procedures that ensure configuration control and prime contractors should explicitly identify in their subcontracts the maintenance that subcontractors are authorize
4、d to perform without obtaining prime-contractor approval. Description of Driving Event: On July 19, 2006, at approximately 0714, Eastern Daylight Time, a sandblasting worker was struck several times by a spinning vent pipe assembly (consisting of 2-inch galvanized-steel pipes and fittings and a 2-in
5、ch bronze vent valve) attached to a sandblast pot while preparing for sandblast operations at the Kennedy Space Center (KSC) Launch Complex 39A (Pad 39A). Security, Fire/Rescue, and Emergency Medical Services (EMS) personnel arrived at the scene within a few minutes, and the injured worker was airli
6、fted to a nearby medical center. The injured worker and several others involved in the sandblasting operation were employed under a subcontract to perform corrosion control, including sandblasting and painting. The mishap involved the unsafe configuration of the sandblast pot due to the following de
7、ficiencies in the initial system setup of the pressure vessel/systems (PV/S): No safety relief valve (SRV) in the system was set at or below the maximum allowable working pressure (MAWP) of the sandblast pot (lowest-rated component in the system), as required by the American Society of Mechanical En
8、gineers (ASME). The sandblast pot was not equipped with a pressure gage or SRV as required by OSHA 29 CFR. Operating pressure was set higher than the sandblast pot (receiver) MAWP. The manufacturers certification was voided by postmanufacturing welds on the pressure vessel. The SRVs on the compresso
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS51562011LESSONSLEARNEDPAD39ASANDBLASTPOTMISHAPPDF

链接地址:http://www.mydoc123.com/p-1019483.html