REG NASA-LLIS-5044-2012 Lessons Learned - Unclear Responsibilities Requirements Quantities Schedules& Reviews For Contractor-Provided Ground Support Equipment.pdf
《REG NASA-LLIS-5044-2012 Lessons Learned - Unclear Responsibilities Requirements Quantities Schedules& Reviews For Contractor-Provided Ground Support Equipment.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-5044-2012 Lessons Learned - Unclear Responsibilities Requirements Quantities Schedules& Reviews For Contractor-Provided Ground Support Equipment.pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、Public Lessons Learned Entry: 5044 Lesson Info: Lesson Number: 5044 Submitting Organization: KSC Submitted by: Jenni Palmer Subject: Unclear Responsibilities, Requirements, Quantities, Schedules & Reviews For Contractor-Provided Ground Support Equipment Abstract: The process for reviewing, approving
2、, and identifying required quantity of contractor developed Ground Support Equipment (GSE) was unclear. As a result, the GSE contractor developed and designed hardware for use without adequate review and input from Ground Operations Project (GOP). Description of Driving Event: The following are exam
3、ples of occurrences that led to this lesson. The design of the Armadillo was supposedly baselined, but GOP personnel could not verify invitation to design reviews. Approximately 20 sets of the stabilization collar and sea anchor GSE are required to ensure worldwide rescue response capability. While
4、expected to work closely with contractor GSE designers, KSC personnel had no authority to direct contractor activities without going through Orion Project Office at JSC. Due to the absence of a formal mechanism, an informal GSE end item requirements sheet review process was established to provide a
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS50442012LESSONSLEARNEDUNCLEARRESPONSIBILITIESREQUIREMENTSQUANTITIESSCHEDULESREVIEWSFORCONTRACTORPROVIDEDGROUNDSUPPORTEQUIPMENTPDF

链接地址:http://www.mydoc123.com/p-1019478.html