1、Lessons Learned Entry: 2157Lessons Learned Entry: 2157Lesson Info:a71 Lesson Number: 2157a71 Submitting Organization: MSFCa71 Submitted by: Barbara Cobba71 POC Name: Barbara Cobba71 POC Email: barbara.cobbnasa.gova71 POC Phone: 256-961-7060Subject: Network/Radio Frequency (RF) Compatibility Testing
2、Abstract: When conducting any type of compatibility testing, no matter how repetitive, it is important to always follow written procedures and best engineering practices even though those procedures have been run many times before. Not paying attention to detail and losing track of the hardware conf
3、iguration can lead to confusion and a complete failure of the test.Description of Driving Event: The Network/Radio Frequency (RF) Compatibility Test was run to prove that the NASA ground network would work with the Hinode (Solar-B) satellite. At the time of the test, it was thought that the best way
4、 to prove the NASA ground stations would be able to communicate with the Japanese-built satellite was to use the GSFC testing equipment designed specifically for this scenario. Typically, the test racks are packed, sent to wherever the satellite is being built, and tested there. In this case, testin
5、g took place in Japan. This resulted in a number of problems: a71 During the test preparation timeframe, it was difficult to obtain information on the status of the test. a71 The shipment of the testing racks and power converters was coordinated very late, leading to confusion and frustration. a71 T
6、he power converters may have played an important part in subsequent anomalies during the testing and should have been more thoroughly researched. a71 The testing racks were antiquated, leading to difficult situations during the testing. a71 Changes were made to the test requirements without a discus
7、sion being held with the entire Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Lessons Learned Entry: 2157group; and consequently, they did not reflect the correct Solar-B requirements. a71 A Test Procedure Review was conducted the night before the
8、test, and only after the MSFC Project Office insisted. a71 The test procedures should have been placed under configuration control and followed during the testing. a71 At the test site, the time given for configuration and verification of the test hardware was inadequate; and the racks were taken ap
9、art and re-integrated using photographs. a71 Because there were no setup and verification procedures to follow, setup problems led to a loss of 2 days of testing time. a71 Uplink commands for the RF Compatibility Test were not loaded beforehand for efficiency. Loading the commands during the test wa
10、sted the engineers time. a71 Troubleshooting during the testing did not follow standard engineering practices or another type of logic flow. During the troubleshooting, the engineers were unable to return the test racks to a known configuration because the configuration changes had not been tracked
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS21572010LESSONSLEARNEDNETWORKRADIOFREQUENCYRFCOMPATIBILITYTESTINGPDF

链接地址:http://www.mydoc123.com/p-1019362.html