欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-2157-2010 Lessons Learned Network Radio Frequency (RF) Compatibility Testing.pdf

    • 资源ID:1019362       资源大小:31.90KB        全文页数:4页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-2157-2010 Lessons Learned Network Radio Frequency (RF) Compatibility Testing.pdf

    1、Lessons Learned Entry: 2157Lessons Learned Entry: 2157Lesson Info:a71 Lesson Number: 2157a71 Submitting Organization: MSFCa71 Submitted by: Barbara Cobba71 POC Name: Barbara Cobba71 POC Email: barbara.cobbnasa.gova71 POC Phone: 256-961-7060Subject: Network/Radio Frequency (RF) Compatibility Testing

    2、Abstract: When conducting any type of compatibility testing, no matter how repetitive, it is important to always follow written procedures and best engineering practices even though those procedures have been run many times before. Not paying attention to detail and losing track of the hardware conf

    3、iguration can lead to confusion and a complete failure of the test.Description of Driving Event: The Network/Radio Frequency (RF) Compatibility Test was run to prove that the NASA ground network would work with the Hinode (Solar-B) satellite. At the time of the test, it was thought that the best way

    4、 to prove the NASA ground stations would be able to communicate with the Japanese-built satellite was to use the GSFC testing equipment designed specifically for this scenario. Typically, the test racks are packed, sent to wherever the satellite is being built, and tested there. In this case, testin

    5、g took place in Japan. This resulted in a number of problems: a71 During the test preparation timeframe, it was difficult to obtain information on the status of the test. a71 The shipment of the testing racks and power converters was coordinated very late, leading to confusion and frustration. a71 T

    6、he power converters may have played an important part in subsequent anomalies during the testing and should have been more thoroughly researched. a71 The testing racks were antiquated, leading to difficult situations during the testing. a71 Changes were made to the test requirements without a discus

    7、sion being held with the entire Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Lessons Learned Entry: 2157group; and consequently, they did not reflect the correct Solar-B requirements. a71 A Test Procedure Review was conducted the night before the

    8、test, and only after the MSFC Project Office insisted. a71 The test procedures should have been placed under configuration control and followed during the testing. a71 At the test site, the time given for configuration and verification of the test hardware was inadequate; and the racks were taken ap

    9、art and re-integrated using photographs. a71 Because there were no setup and verification procedures to follow, setup problems led to a loss of 2 days of testing time. a71 Uplink commands for the RF Compatibility Test were not loaded beforehand for efficiency. Loading the commands during the test wa

    10、sted the engineers time. a71 Troubleshooting during the testing did not follow standard engineering practices or another type of logic flow. During the troubleshooting, the engineers were unable to return the test racks to a known configuration because the configuration changes had not been tracked

    11、as the troubleshooting progressed. a71 As the testing and troubleshooting progressed, and even after the testing was complete, no one accepted responsibility for the schedule delays, problems during the test, or failure of the test. After the failed test, another test was performed, this time using

    12、a flight satellite with the same transponder and telemetry system as the one being tested on the ground station. The MSFC Project Office had originally suggested this test, but it was rejected. This test was easily passed with no complications.Lesson(s) Learned: If conducting RF compatibility testin

    13、g in the U.S., adequate planning must be done to prevent the problems that were encountered with shipping, outdated equipment, configuration control of test procedures and equipment, troubleshooting, and assigned responsibilities. If conducting the same testing overseas, the following feasibility st

    14、udy could be performed: If there is another satellite operating with the same transponder and telemetry system as the one being tested, the ground station could track the orbiting spacecraft to provide data for the characterization of the downlink telemetry performance and to verify station configur

    15、ation and telemetry data handling in support of the test spacecraft. This was done to finalize the incomplete RF Compatibility Test for Solar-B.Recommendation(s): Always plan adequately for compatibility testing. Always follow best engineering practices during testing: review, manage the configurati

    16、on, and follow all procedures in the test documentation (e.g., setup and verification procedures, test procedures, test commands). Perform any setup activities that can be done before the test to save time during the test. Document results of each step of the test, Provided by IHSNot for ResaleNo re

    17、production or networking permitted without license from IHS-,-,-Lessons Learned Entry: 2157including any unexpected results, malfunctions, anomalies, or hardware/software changes.Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): a71 ScienceAddit

    18、ional Key Phrase(s): a71 Missions and Systems Requirements Definition.Configuration control and data managementa71 Missions and Systems Requirements Definition.a71 Program Management.Risk managementa71 Systems Engineering and Analysis.a71 Safety and Mission Assurance.Maintenancea71 Safety and Missio

    19、n Assurance.Configuration Change Controla71 Safety and Mission Assurance.a71 Mission Operations and Ground Support Systems.Ground support systemsa71 Mission Operations and Ground Support Systems.a71 Integration and Testinga71 Systems Engineering and Analysis.Planning of requirements verification pro

    20、cessesa71 Systems Engineering and Analysis.Engineering design and project processes and standardsa71 Program Management.a71 Safety and Mission Assurance.Qualitya71 Safety and Mission Assurance.Reliabilitya71 Additional Categories.a71 Additional Categories.Communication Systemsa71 Safety and Mission

    21、Assurance.Product AssuranceAdditional Info: a71 Project: Hinode / Solar-BProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Lessons Learned Entry: 2157Approval Info: a71 Approval Date: 2010-04-29a71 Approval Name: mbella71 Approval Organization: HQProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-2157-2010 Lessons Learned Network Radio Frequency (RF) Compatibility Testing.pdf)为本站会员(赵齐羽)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开