REG NASA-LLIS-1571--2005 Lessons Learned Streamlining and Standardizing Project Planning Documents (prepared during formulation and into implementation phases).pdf
《REG NASA-LLIS-1571--2005 Lessons Learned Streamlining and Standardizing Project Planning Documents (prepared during formulation and into implementation phases).pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-1571--2005 Lessons Learned Streamlining and Standardizing Project Planning Documents (prepared during formulation and into implementation phases).pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 1571Lesson Info:a71 Lesson Number: 1571a71 Lesson Date: 2005-06-07a71 Submitting Organization: ARCa71 Authored by: Ronald C. WinterlinSubject: Streamlining and Standardizing Project Planning Documents (prepared during formulation and into implementation phases) Abstract: Advan
2、ced Air Transportation Technologies (AATT) was a nine-year effort and experienced significant changes in documentation requirements from Headquarters and the lead center. This had an effect on the policies, procedures, formats, and content for project planning and formulation documents including the
3、 program, project and sub-project plans (or IBPDs), along with related other agreements and supportive plans (e.g. Program Commitment Agreements, Risk Management/Mitigation Plans, Tech Transfer Plans, etc.). Examples include everything from title and formatting changes to basic content requirements
4、including the program and project Work Breakdown Structure (WBS). The WBS continues to be a key tool that is recognized as being one of the most important basic building blocks around which a program and project(s) should be developed. Its potential for being the central structure, providing the bas
5、is for successful financial and Earned Value management and control, along with project metrics, technical and performance tracking, and schedule development cannot be denied. AATT experienced confusing and sometimes unclear guidance regarding the best way to develop a WBS for projects focused on co
6、ncept exploration and development and demonstration. Both NASA and the private sector training provide theory and emphasize the key role and importance of a good WBS, but do not provide hands-on real world applications and assistance in creating a WBS for these types of projects. The various types o
7、f WBS formats and approaches are offered (e.g., organizational versus product versus work, etc.), but clear guidance as to real world applications for the best approach and how to do it, within the constraints and limitations of the NASA financial management system and full cost accounting, is lacki
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS15712005LESSONSLEARNEDSTREAMLININGANDSTANDARDIZINGPROJECTPLANNINGDOCUMENTSPREPAREDDURINGFORMULATIONANDINTOIMPLEMENTATIONPHASESPDF

链接地址:http://www.mydoc123.com/p-1019194.html