1、Lessons Learned Entry: 1555Lesson Info:a71 Lesson Number: 1555a71 Lesson Date: 2005-01-01a71 Submitting Organization: ARCa71 Submitted by: Donald R. Mendozaa71 Authored by: Ronald C WinterlinSubject: External Relations, Customers, Tech Transfer Abstract: Most all projects in todays environment invar
2、iably require the cooperation and support of multiple organizations both in development and acceptance of project deliverables (including multiple government agencies, the projects customers, educational institutions and potential industry stakeholders and users). With resources scarce at all levels
3、 and close oversight and scrutiny (both internally and externally), the importance of the inevitable matrix organizations established to carry out programs and projects from formulation through implementation cannot be overemphasized. The AATT Project made a significant effort in communicating and d
4、eveloping agreements with key partners such as the FAA, as a primary receiver/user of the Projects products. A multitude of Memorandum of Understanding/Agreements, etc, were established and utilized during the life of this project. Clearly, the partnership with the FAA proved to be the Projects grea
5、test challenge. With continuous management and organizational changes at all levels, policy and procedure changes, etc., AATT experienced problems, as grouped and summarized below: A. Interacting with, and learning to work with an entirely different federal agency such as the FAA: It took much time
6、and resources to experience and understand key cultural and organizational differences involving everything from policy, procedures, politics, and communication processes in both technical and administrative/management domains. Comments at all levels across the AATT Project demonstrate that this was
7、 one of the most significant ongoing challenges. The FAA failed for a number of reasons to provide consistent single points of contact (POC) for any appreciable length of time. One manager reports that “the average life” of an FAA POC has been less than 2 years”. Also, unexpected union issues and co
8、ncerns ensued with the National Air Traffic Controllers Association (NATCA) and the Professional Airways Systems Specialists (PASS), which were increased since AATT had a presence at more than one FAA facility. To further complicate things, Provided by IHSNot for ResaleNo reproduction or networking
9、permitted without license from IHS-,-,-continual shifts and/orreorganizations within the FAA resulted in AATT technology being moved from organization to organization constantly requiring NASA managers and researchers to educate and establish relationships with new FAA personnel. B. Resource Support
10、: As the AATT Project matured, FAA commitments to provide joint support funding, personnel and/or facilities declined for a number of reasons. AATT learned the high risk this really is from the start and how it can lead to de-scoping, schedule delays or tradeoffs not originally foreseen. C. Technica
11、l Transfer of Project Products: AATT invested much time and energy in working with a number of FAA POCs at various levels to establish an agreed upon process and understanding of technologies to be passed on for further development and implementation into the National Airspace System (NAS). The FAA
12、has stated that they are often unprepared for the research NASA develops that they are then expected to further develop and implement into the operational environment. The AATT tailored TRL (Technology Readiness Level) process has been used for these purposes. An ongoing problem AATT has experienced
13、 is the FAAs desire and need to know how a newly developed NASA technology being handed over, will fit into the evolving NAS. D. External Agreements and Management Support: As indicated above, the AATT Project was subjected to much instability and organizational dynamics in its relationship to the F
14、AA. Formal agreements that were made and in place between the FAA and the AATT Project regarding technologies to be prototyped, demonstrated, and transferred in support of stakeholder requirements were ignored. In light of this, it is crucial to gain long-term top-level management support from any a
15、nd all key participating organizations including necessary resource commitments. Description of Driving Event: N/ALesson(s) Learned: For all of the above listed examples, the importance of establishing strong up-front relationships and communications between all levels of management authority down t
16、o working collaborations cannot be overemphasized. This is especially important when two large federal agencies are involved that must work successfully together to research and develop complex technical concepts and tools that must be passed from one to the other for implementation into the operati
17、onal systems of the real world. Recommendation(s): A. A strong partnership with the FAA that includes the FAA Air Traffic organization buy-in and support is necessary for NASA to be successful in air traffic management research and technology demonstration. Access to FAA controllers and facilities i
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS15552005LESSONSLEARNEDEXTERNALRELATIONSCUSTOMERSTECHTRANSFERPDF

链接地址:http://www.mydoc123.com/p-1019178.html