REG NASA-LLIS-0885-2000 Lessons Learned Verify Configuration of Flight Hardware Prior to Test (1998).pdf
《REG NASA-LLIS-0885-2000 Lessons Learned Verify Configuration of Flight Hardware Prior to Test (1998).pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-0885-2000 Lessons Learned Verify Configuration of Flight Hardware Prior to Test (1998).pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 0885Lesson Info:a71 Lesson Number: 0885a71 Lesson Date: 2000-06-8a71 Submitting Organization: JPLa71 Submitted by: R. Menke, R. Welch, D. OberhettingerSubject: Verify Configuration of Flight Hardware Prior to Test (1998) Abstract: During a system-level ambient functional test
2、of the MPL spacecraft, the software test sequence commanded the gimbaled medium gain antenna through its full range of motion, striking one of the undeployed solar panels. Confirm that developmental and flight hardware is in a configuration that has been reviewed for hardware and personnel safety pr
3、ior to beginning any test sequence and that the appropriate procedure for powering down flight hardware in all test configurations under any potential emergency condition has been determined. Hold a thorough Test Readiness Review using the most current checklist that addresses personnel safety, soft
4、ware and hardware safety, test operations and constraints, fault protection actions, kinematics and interference analysis, commandability, emergency shutdown, and restart procedures.Description of Driving Event: Flight hardware was damaged, and personnel safety potentially compromised, during a syst
5、em-level ambient functional test of the Mars Polar Lander (MPL) spacecraft intended to simulate the mission profile immediately after landing. The software test sequence that was programmed into the vehicle commanded the gimbaled medium gain antenna (MGA) through its full range of motion. This inadv
6、ertently drove the MGA into one of the undeployed solar panels, cracking the composite antenna reflector dish and scratching the substrate of that solar panel.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-refer to D descriptionD MPL in the “Landed“
7、 Configuration A previous test left the solar array configured on the lander in the stowed position. This undeployed mechanical configuration obstructs a full-range-of-motion test of the MGA. As the impending collision was observed, the test conductor attempted to command a halt to the motion. Howev
8、er, the commands did not execute because the uplink path was then in the process of being reconfigured from hard-line to radio frequency. Furthermore, the emergency power-off switch only governed the ground support equipment and could not shut down the spacecraft since it was in a battery-powered fl
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS08852000LESSONSLEARNEDVERIFYCONFIGURATIONOFFLIGHTHARDWAREPRIORTOTEST1998PDF

链接地址:http://www.mydoc123.com/p-1018531.html